Navigate Up
Sign In
NYCSCA.ORG > Working with Us > Performing the Work > Design > Procedural Guidelines
Procedural Guidelines

Procedural Guidelines are administrative/managerial procedures that will guide A&E staff and their Design Consultants in procedural matters related to the scope, design and management of projects for the Authority. The Guidelines are organized first by stage or phase of work (General, Planning/Assignment, Scope & Design, Bid-Award, Construction, and Closeout) and within that by applicability to project type (CIP, Capacity, or CIP & Capacity). The naming convention for the Procedural Guidelines is as follows: all start with the prefix PG; then number (1-6) indicating overall stage/phase; then number (1-3) indicating project-type applicability; and finally sequential number of issuance. Note that two procedures previously issued as AEP (A&E Procedures) have been included as part of the Procedural Guidelines.

In order to view the Procedural Guidelines, you must download and install an MS Word Viewer or have a working version of MS Word 97 or later installed. You may download the latest viewer for free by following this link: Microsoft Word Viewer MS Word Viewer

Section 0.0 - Table of Contents

Procedural Guideline NumberProcedural Guideline TitleRev.Issue or Last Revision DateLatest Bulletin No.
0.0Table of Contents609/06/2011AE11-03
 
^ Top of Page