The projects and associated bid dates listed are for information only as they are tentative and subject to change.

Capital Improvement Projects Anticipated Contract Awards

Data as of December 31, 2023
SchoolGeo DistrictProject Description$Estimated RangeProject Advertised DateConstruction CategoryStatus
BRONX
D022029 A SCHOOL WITHOUT WALLS PLAYGROUNDS
A SCHOOL WITHOUT WALLS 08OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/04PLAYGROUNDSDesign
D022250 A SCHOOL WITHOUT WALLS ACCESSIBILITY
A SCHOOL WITHOUT WALLS 08PATH OF TRAVEL-OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$250K - $500K2024/03ACCESSIBILITYDesign
D021669 ALFRED E. SMITH HS - X EXT. WORK
ALFRED E. SMITH HS - X 07STRUCTURAL CONCRETE FAILURE @ X600$750K - $1M2024/01EXT. WORKDesign
D022216 BRONX CNTR FOR SCIENCE & MATH - X WALK-IN REFRIGERATORS AND FREEZERS
BRONX CNTR FOR SCIENCE & MATH - X 09WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/04WALK-IN REFRIGERATORS AND FREEZERSDesign
D021848 BRONX HEALTH SCIENCES HS - X ROOM CONVERSIONS/UPGRADES
BRONX HEALTH SCIENCES HS - X 11RESO A CAFETERIA UPGRADE$500K - $750K2024/02ROOM CONVERSIONS/UPGRADESDesign
D021047 BRONX INTERNATIONAL - BRONX PLAYGROUNDS
BRONX INTERNATIONAL - BRONX 09TCU REMOVAL/PLAYGROUND REDEVELOPMENT$4M OVER2024/01PLAYGROUNDSDesign
D021238 BRONX INTERNATIONAL - BRONX ACCESSIBILITY
BRONX INTERNATIONAL - BRONX 09PATH OF TRAVEL TCU REMOVAL/PLAYGROUND REDEVELOPMENT$0 - $250K2024/01ACCESSIBILITYDesign
D022072 BRONX INTERNATIONAL - BRONX ACCESSIBILITY
BRONX INTERNATIONAL - BRONX 09PATH OF TRAVEL SCIENCE LAB UPGRADES$0 - $250K2024/01ACCESSIBILITYDesign
D022056 BRONX LAB SCHOOL - BRONX BUILDING SYSTEMS
BRONX LAB SCHOOL - BRONX 11REINFORCING SUPPORT ELEMENTS$4M OVER2024/05BUILDING SYSTEMSDesign
BRONX LAB SCHOOL - BRONX 11SWIMMING POOL$4M OVER2024/05MISCELLANEOUSDesign
D022304 BRONX LAB SCHOOL - BRONX ACCESSIBILITY
BRONX LAB SCHOOL - BRONX 11PATH OF TRAVEL SWIMMING POOL$750K - $1M2024/05ACCESSIBILITYDesign
D021042 BRONX LEADERSHIP ACADEMY II HS - BRONX INTERIOR
BRONX LEADERSHIP ACADEMY II HS - BRONX 07IDA INTERIOR SPACES$1M - $4M2024/01INTERIORDesign
X188 SPED - BRONX 07IDA FLOOD ELIMINATION$1M - $4M2024/01EXT. WORKDesign
D021844 BRONX SCHOOL FOR LAW, GOVERNMENT AND JUSTICE GYMNASIUM
BRONX SCHOOL FOR LAW, GOVERNMENT AND JUSTICE 09RESO A GYMNASIUM UPGRADE$250K - $500K2024/01GYMNASIUMDesign
D021826 CROTONA INTERNATIONAL HIGH SCHOOL - BRONX PLAYGROUNDS
CROTONA INTERNATIONAL HIGH SCHOOL - BRONX 10RESO A PLAYGROUND UPGRADE$1M - $4M2024/03PLAYGROUNDSDesign
D022039 CROTONA INTERNATIONAL HIGH SCHOOL - BRONX ACCESSIBILITY
CROTONA INTERNATIONAL HIGH SCHOOL - BRONX 10PATH OF TRAVEL RESO A PLAYGROUND UPGRADE$250K - $500K2024/03ACCESSIBILITYDesign
D021270 FAIRMONT NEIGHBORHOOD SCHOOL EXT. WORK
FAIRMONT NEIGHBORHOOD SCHOOL 12EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
FAIRMONT NEIGHBORHOOD SCHOOL 12ROOFS$4M OVER2024/01EXT. WORKDesign
FAIRMONT NEIGHBORHOOD SCHOOL 12FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
D020065 FORDHAM HS FOR THE ARTS - BRONX MISCELLANEOUS
FORDHAM HS FOR THE ARTS - BRONX 10STRUCTURAL ELEMENTS UNDER POOL$4M OVER2024/02MISCELLANEOUSDesign
D021064 FORDHAM HS FOR THE ARTS - BRONX ACCESSIBILITY
FORDHAM HS FOR THE ARTS - BRONX 10PATH OF TRAVEL STRUCTURAL ELEMENTS UNDER POOL$1M - $4M2024/02ACCESSIBILITYDesign
D021604 GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER EXT. WORK
GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER 09PARAPETS$1M - $4M2024/03EXT. WORKDesign
GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER 09WINDOWS$1M - $4M2024/03EXT. WORKDesign
GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER 09EXTERIOR MASONRY$1M - $4M2024/03EXT. WORKDesign
D021181 HARRY S. TRUMAN HS - X ACCESSIBILITY
HARRY S. TRUMAN HS - X 11PATH OF TRAVEL RESO A ATHLETIC FIELD$4M OVER2024/03ACCESSIBILITYDesign
HARRY S. TRUMAN HS - X 11RESO A ATHLETIC FIELD UPGRADE$4M OVER2024/03ATHLETIC FIELDSDesign
D018566 HOLCOMBE L. RUCKER SCHOOLOF COMMUNITY RESEARCH - BRONX BOILER ELECTRIFICATION
HOLCOMBE L. RUCKER SCHOOLOF COMMUNITY RESEARCH - BRONX 08ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/02BOILER ELECTRIFICATIONDesign
LONGWOOD PREPARATORY ACADEMY 08FIRE ALARM SYSTEM REPLACEMENT$4M OVER2024/02ELECTRICALDesign
LONGWOOD PREPARATORY ACADEMY 08ELECTRICAL SERVICE UPGRADE$4M OVER2024/02ELECTRICALDesign
D021602 HOSTOS-LINCOLN ACADEMY OF SCIENCE EXT. WORK
HOSTOS-LINCOLN ACADEMY OF SCIENCE 07PARAPETS$4M OVER2024/05EXT. WORKDesign
HOSTOS-LINCOLN ACADEMY OF SCIENCE 07EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
D021441 HS OF COMPUTERS & TECHNOLOGY - X GYMNASIUM
HS OF COMPUTERS & TECHNOLOGY - X 11RESO A LOCKER ROOM UPGRADE$4M OVER2024/03GYMNASIUMDesign
D021653 I.S. 118 - BRONX PLAYGROUNDS
I.S. 118 - BRONX 10OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/03PLAYGROUNDSDesign
D020700 I.S. 22 - BRONX AUDITORIUM UPGRADES
I.S. 22 - BRONX 09RESO A (MA) AUDITORIUM UPGRADE$1M - $4M2024/01AUDITORIUM UPGRADESDesign
D022092 I.S. 22 - BRONX EXT. WORK
I.S. 22 - BRONX 09ROOFS$4M OVER2024/06EXT. WORKDesign
I.S. 22 - BRONX 09GYMNASIUM FLOORING$4M OVER2024/06GYMNASIUMDesign
I.S. 22 - BRONX 09EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
I.S. 22 - BRONX 09WINDOWS$4M OVER2024/06EXT. WORKDesign
I.S. 22 - BRONX 09PARAPETS$4M OVER2024/06EXT. WORKDesign
D022218 I.S. 339 - BRONX WALK-IN REFRIGERATORS AND FREEZERS
I.S. 339 - BRONX 09WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D021915 I.S. 390 - BRONX ELECTRICAL
I.S. 390 - BRONX 10FIRE ALARM SYSTEM REPLACEMENT$1M - $4M2024/03ELECTRICALDesign
D021829 I.S. 391 - BRONX PLAYGROUNDS
I.S. 391 - BRONX 10RESO A PLAYGROUND UPGRADE$4M OVER2024/03PLAYGROUNDSDesign
D021989 I.S. 391 - BRONX ACCESSIBILITY
I.S. 391 - BRONX 10PATH OF TRAVEL RESO A PLAYGROUND UPGRADE$0 - $250K2024/03ACCESSIBILITYDesign
D021633 I.S. 424 - BRONX AUDITORIUM UPGRADES
I.S. 424 - BRONX 08RESO A AUDITORIUM UPGRADE$750K - $1M2024/03AUDITORIUM UPGRADESDesign
P026405 I.S. 562 - BRONX AUDITORIUM UPGRADES
I.S. 562 - BRONX 08RESO A AUDITORIUM UPGRADE$750K - $1M2024/01AUDITORIUM UPGRADESDesign
I.S. 562 - BRONX 08PATH OF TRAVEL RESO A AUDITORIUM UPGRADE$750K - $1M2024/01ACCESSIBILITYDesign
D021808 I.S. 80 - BRONX AUDITORIUM UPGRADES
I.S. 80 - BRONX 10RESO A AUDITORIUM UPGRADE$500K - $750K2024/07AUDITORIUM UPGRADESScope
D020997 M.S. 363 - BRONX MISCELLANEOUS
M.S. 363 - BRONX 10SWIMMING POOL$1M - $4M2024/01MISCELLANEOUSDesign
D021085 M.S. 363 - BRONX EXT. WORK
M.S. 363 - BRONX 10EXTERIOR MASONRY @ X115$1M - $4M2024/01EXT. WORKDesign
M.S. 363 - BRONX 10WINDOWS$1M - $4M2024/01EXT. WORKDesign
D022044 M.S. 363 - BRONX FLOORS
M.S. 363 - BRONX 10GYM FLOOR REPLACEMENT$1M - $4M2024/01FLOORSDesign
D021476 M.S./H.S. 225 - BRONX ROOM CONVERSIONS/UPGRADES
M.S./H.S. 225 - BRONX 10RESO A ROOM CONVERSION$750K - $1M2024/02ROOM CONVERSIONS/UPGRADESDesign
D022282 M.S./H.S. 225 - BRONX ACCESSIBILITY
M.S./H.S. 225 - BRONX 10PATH OF TRAVEL RESO A ROOM CONVERSION$0 - $250K2024/03ACCESSIBILITYDesign
D022257 M.S./H.S. 342 - BRONX ELECTRICAL
M.S./H.S. 342 - BRONX 10FIRE SPRINKLER SYSTEM$750K - $1M2024/05ELECTRICALDesign
D021474 M.S./H.S. 368 - BRONX ATHLETIC FIELDS
M.S./H.S. 368 - BRONX 10RESO A ATHLETIC FIELD UPGRADE$750K - $1M2024/02ATHLETIC FIELDSDesign
D021079 MORRIS COLLAB HS TECH & HUMAN - X SCIENCE LAB UPGRADES
MORRIS COLLAB HS TECH & HUMAN - X 09SCIENCE LAB UPGRADES$1M - $4M2024/01SCIENCE LAB UPGRADESDesign
D021454 P.S. 105 - BRONX ACCESSIBILITY
P.S. 105 - BRONX 11EXISTING BUILDING-AUDITORIUM$4M OVER2024/06ACCESSIBILITYDesign
P.S. 105 - BRONX 11EXISTING BUILDING-INTERIOR RENOVATIONS$4M OVER2024/06MISCELLANEOUSDesign
P.S. 105 - BRONX 11EXISTING BUILDING-IPDVS WORK$4M OVER2024/06ELECTRICALDesign
P.S. 105 - BRONX 11EXISTING BUILDING-FIRE ALARM WORK$4M OVER2024/06ELECTRICALDesign
P.S. 105 - BRONX 11EXISTING BUILDING-ELECTRICAL SYSTEMS$4M OVER2024/06ELECTRICALDesign
P.S. 105 - BRONX 11PARAPETS$4M OVER2024/06EXT. WORKDesign
P.S. 105 - BRONX 11EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
D021660 P.S. 105 - BRONX ACCESSIBILITY
P.S. 105 - BRONX 11EXISTING BUILDING-GYMNASIUM$750K - $1M2024/01ACCESSIBILITYDesign
D022049 P.S. 106 - BRONX EXT. WORK
P.S. 106 - BRONX 11EXTERIOR MASONRY$1M - $4M2024/07EXT. WORKDesign
D021629 P.S. 107 - BRONX EXT. WORK
P.S. 107 - BRONX 08EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
P.S. 107 - BRONX 08PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 107 - BRONX 08ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 107 - BRONX 08FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
D022217 P.S. 11 - BRONX WALK-IN REFRIGERATORS AND FREEZERS
P.S. 11 - BRONX 09WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/04WALK-IN REFRIGERATORS AND FREEZERSDesign
D018712 P.S. 110 - BRONX EXT. WORK
P.S. 110 - BRONX 09REPAIR RETAINING WALLS$1M - $4M2024/01EXT. WORKDesign
D021889 P.S. 112 - BRONX PLAYGROUNDS
P.S. 112 - BRONX 11RESO A PLAYGROUND UPGRADE$1M - $4M2024/06PLAYGROUNDSDesign
D021773 P.S. 119 - BRONX MISCELLANEOUS
P.S. 119 - BRONX 08STRUCTURAL ISSUES/BUILDING FACADES- PERM FIX$4M OVER2024/04MISCELLANEOUSDesign
P.S. 119 - BRONX 08ROOFS$4M OVER2024/04EXT. WORKDesign
P.S. 119 - BRONX 08WINDOWS$4M OVER2024/04EXT. WORKDesign
P.S. 119 - BRONX 08PARAPETS$4M OVER2024/04EXT. WORKDesign
D021065 P.S. 126 - BRONX ACCESSIBILITY
P.S. 126 - BRONX 09FULL PROGRAM ACCESSIBILITY$4M OVER2024/01ACCESSIBILITYDesign
P.S. 126 - BRONX 09LOW VOLTAGE ELECTRICAL SYSTEMS$4M OVER2024/01ELECTRICALDesign
D020055 P.S. 138 - BRONX BOILER/HEAT PUMP
P.S. 138 - BRONX 08PLANYC BOILER CONVERSION$4M OVER2024/02BOILER/HEAT PUMPDesign
D020056 P.S. 138 - BRONX BOILER/HEAT PUMP
P.S. 138 - BRONX 08PLANYC CLIMATE CONTROL$1M - $4M2024/02BOILER/HEAT PUMPDesign
D021767 P.S. 138 - BRONX MISCELLANEOUS
P.S. 138 - BRONX 08EXISTING BUILDING-INTERIOR RENOVATIONS$1M - $4M2024/05MISCELLANEOUSDesign
D022255 P.S. 15 - BRONX GYMNASIUM
P.S. 15 - BRONX 10RESO A GYMNASIUM UPGRADE$500K - $750K2024/04GYMNASIUMDesign
D020239 P.S. 150 - BRONX AUDITORIUM UPGRADES
P.S. 150 - BRONX 12RESO A AUDITORIUM UPGRADE$750K - $1M2024/01AUDITORIUM UPGRADESDesign
D019502 P.S. 152 - BRONX EXT. WORK
P.S. 152 - BRONX 08PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 152 - BRONX 08ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 152 - BRONX 08EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
P.S. 152 - BRONX 08CHILLER PLANT UPGRADE$4M OVER2024/01BUILDING SYSTEMSDesign
P.S. 152 - BRONX 08FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
D020917 P.S. 154 - BRONX AUDITORIUM UPGRADES
P.S. 154 - BRONX 07RESO A AUDITORIUM UPGRADE$250K - $500K2024/01AUDITORIUM UPGRADESDesign
D021686 P.S. 161 - BRONX EXT. WORK
P.S. 161 - BRONX 07ROOF REPLACEMENT$4M OVER2024/05EXT. WORKDesign
P.S. 161 - BRONX 07PARAPETS$4M OVER2024/05EXT. WORKDesign
P.S. 161 - BRONX 07EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
D022096 P.S. 19 - BRONX EXT. WORK
P.S. 19 - BRONX 11EXTERIOR MASONRY$4M OVER2024/04EXT. WORKDesign
P.S. 19 - BRONX 11PARAPETS$4M OVER2024/04EXT. WORKDesign
P.S. 19 - BRONX 11FLOOD ELIMINATION$4M OVER2024/04EXT. WORKDesign
D021752 P.S. 195 - BRONX PLAYGROUNDS
P.S. 195 - BRONX 12OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/01PLAYGROUNDSDesign
D022308 P.S. 195 - BRONX ACCESSIBILITY
P.S. 195 - BRONX 12PATH OF TRAVEL- OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$250K - $500K2024/06ACCESSIBILITYDesign
D021073 P.S. 199 - BRONX ACCESSIBILITY
P.S. 199 - BRONX 09FULL PROGRAM ACCESSIBILITY$4M OVER2024/03ACCESSIBILITYDesign
D021619 P.S. 199 - BRONX EXT. WORK
P.S. 199 - BRONX 09ROOFS$4M OVER2024/03EXT. WORKDesign
P.S. 199 - BRONX 09PARAPETS$4M OVER2024/03EXT. WORKDesign
P.S. 199 - BRONX 09EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
P.S. 199 - BRONX 09WINDOWS$4M OVER2024/03EXT. WORKDesign
D021256 P.S. 20 - BRONX BOILER/HEAT PUMP
P.S. 20 - BRONX 10HVAC AND BMS UPGRADE$4M OVER2024/01BOILER/HEAT PUMPDesign
P.S. 20 - BRONX 10RTU REPLACEMENT$4M OVER2024/01BUILDING SYSTEMSDesign
P.S. 20 - BRONX 10FIRE ALARM SYSTEM REPLACEMENT$4M OVER2024/01ELECTRICALDesign
D022219 P.S. 214 - BRONX WALK-IN REFRIGERATORS AND FREEZERS
P.S. 214 - BRONX 12WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
P026398 P.S. 25 - BRONX ELECTRICAL
P.S. 25 - BRONX 07IPDVS CAMERA INSTALLATION$500K - $750K2024/01ELECTRICALDesign
P.S. 57 - BRONX 12IPDVS CAMERA INSTALLATION$500K - $750K2024/01ELECTRICALDesign
D021110 P.S. 279 - BRONX PLAYGROUNDS
P.S. 279 - BRONX 10PLAYGROUND UPGRADE$4M OVER2024/03PLAYGROUNDSDesign
D021654 P.S. 32 - BRONX PLAYGROUNDS
P.S. 32 - BRONX 10OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT:$1M - $4M2024/06PLAYGROUNDSDesign
D021621 P.S. 54 - BRONX EXT. WORK
P.S. 54 - BRONX 10PARAPETS$1M - $4M2024/02EXT. WORKDesign
P.S. 54 - BRONX 10EXTERIOR MASONRY$1M - $4M2024/02EXT. WORKDesign
P.S. 54 - BRONX 10ROOFS$1M - $4M2024/02EXT. WORKDesign
D020016 P.S. 67 - BRONX SCHOOL SAFETY
P.S. 67 - BRONX 12KITCHEN ANSUL SYSTEM$500K - $750K2024/01SCHOOL SAFETYDesign
D021648 P.S. 70 - BRONX PLAYGROUNDS
P.S. 70 - BRONX 09OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/03PLAYGROUNDSDesign
P.S. 70 - BRONX 09PATH OF TRAVEL-OTHER TEMP STRUCTURE REMOVAL$1M - $4M2024/03ACCESSIBILITYDesign
D022230 P.S. 70 - BRONX WALK-IN REFRIGERATORS AND FREEZERS
P.S. 70 - BRONX 09WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/04WALK-IN REFRIGERATORS AND FREEZERSDesign
D021272 P.S. 72 - BRONX EXT. WORK
P.S. 72 - BRONX 08EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
P.S. 72 - BRONX 08WINDOWS$4M OVER2024/03EXT. WORKDesign
P.S. 72 - BRONX 08PARAPETS$4M OVER2024/03EXT. WORKDesign
D022145 P.S. 73 - BRONX PLAYGROUNDS
P.S. 73 - BRONX 09OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/06PLAYGROUNDSDesign
D022180 P.S. 754 SPED - BRONX EXT. WORK
P.S. 754 SPED - BRONX 07ROOFS$4M OVER2024/05EXT. WORKDesign
P.S. 754 SPED - BRONX 07EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
P.S. 754 SPED - BRONX 07PARAPETS$4M OVER2024/05EXT. WORKDesign
D022023 P.S. 85 - BRONX PLAYGROUNDS
P.S. 85 - BRONX 10OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$4M OVER2024/04PLAYGROUNDSDesign
D022244 P.S. 85 - BRONX ACCESSIBILITY
P.S. 85 - BRONX 10PATH OF TRAVEL- OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDELOPMENT$0 - $250K2024/03ACCESSIBILITYDesign
D021190 P.S. 91 - BRONX PLAYGROUNDS
P.S. 91 - BRONX 10RESO A PLAYGROUND UPGRADE$1M - $4M2024/05PLAYGROUNDSDesign
D022071 P.S. 91 - BRONX EXT. WORK
P.S. 91 - BRONX 10ROOFS$4M OVER2024/05EXT. WORKDesign
P.S. 91 - BRONX 10PARAPETS$4M OVER2024/05EXT. WORKDesign
P.S. 91 - BRONX 10EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
P.S. 91 - BRONX 10WINDOWS$4M OVER2024/05EXT. WORKDesign
D021712 SCHOOL OF DIPLOMACY AUDITORIUM UPGRADES
SCHOOL OF DIPLOMACY 11AUDITORIUM UPGRADE$4M OVER2024/01AUDITORIUM UPGRADESDesign
D022020 SCHOOL OF DIPLOMACY ACCESSIBILITY
SCHOOL OF DIPLOMACY 11PATH OF TRAVEL AUDITORIUM UPGRADE$250K - $500K2024/01ACCESSIBILITYDesign
P026325 SCHOOL OF DIPLOMACY SCIENCE LAB UPGRADES
SCHOOL OF DIPLOMACY 11RESO A SCIENCE LAB UPGRADE$1M - $4M2024/01SCIENCE LAB UPGRADESDesign
SCHOOL OF DIPLOMACY 11PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE$1M - $4M2024/01ACCESSIBILITYDesign
D022231 THE URBAN ASSEMBLY BRONX ACADEMY OF LETTERS WALK-IN REFRIGERATORS AND FREEZERS
THE URBAN ASSEMBLY BRONX ACADEMY OF LETTERS 07WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/04WALK-IN REFRIGERATORS AND FREEZERSDesign
D022057 THE WALTON AVENUE SCHOOL PLAYGROUNDS
THE WALTON AVENUE SCHOOL 09TCU REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/04PLAYGROUNDSDesign
D022270 WILLIAMSBRIDGE NAACP EARLY CHILDHOOD EDUCATION CEN - BRONX LEASES
WILLIAMSBRIDGE NAACP EARLY CHILDHOOD EDUCATION CEN - BRONX 11ACS EARLY LEARN-LEASE RENOVATION$0 - $250K2024/06LEASESScope
D022301 X012 SPED - BRONX LIBRARY UPGRADES
X012 SPED - BRONX 11RESO A LIBRARY UPGRADE$500K - $750K2024/07LIBRARY UPGRADESScope
D022320 X168 SPED - BRONX ELECTRICAL
X168 SPED - BRONX 10RESO A IPDVS CAMERA INSTALLATION$0 - $250K2024/06ELECTRICALScope
D021743 X721 SPED - BRONX EXT. WORK
X721 SPED - BRONX 11ROOF REPLACEMENT$1M - $4M2024/07EXT. WORKScope
BROOKLYN
D020782 200 CENTRAL AVENUE DAY CARE CENTER LEASES
200 CENTRAL AVENUE DAY CARE CENTER 32ACS EARLY LEARN LEASE RENEWAL$0 - $250K2024/01LEASESDesign
D022064 ABRAHAM LINCOLN HS - BROOKLYN ADMIN/CODE COMP
ABRAHAM LINCOLN HS - BROOKLYN 21ATHLETIC FIELD BLEACHERS C OF O$500K - $750K2024/04ADMIN/CODE COMPDesign
D022069 ACHIEVEMENT FIRST EAST NEW YORK CHARTER SCHOOL - K EXT. WORK
ACHIEVEMENT FIRST EAST NEW YORK CHARTER SCHOOL - K 19PERM FIX- EXTERIOR MASONRY @ K065$4M OVER2024/03EXT. WORKDesign
D021756 BOYS & GIRLS HS - BROOKLYN GYMNASIUM
BOYS & GIRLS HS - BROOKLYN 16GYM UPGRADE$1M - $4M2024/02GYMNASIUMDesign
D022055 BOYS & GIRLS HS - BROOKLYN ACCESSIBILITY
BOYS & GIRLS HS - BROOKLYN 16PATH OF TRAVEL GYM UPGRADE$250K - $500K2024/02ACCESSIBILITYDesign
D022210 BROOKLYN ACADEMY HS - BROOKLYN WALK-IN REFRIGERATORS AND FREEZERS
BROOKLYN ACADEMY HS - BROOKLYN 13WALK-IN REFRIGERATORS AND FREEZERS$750K - $1M2024/04WALK-IN REFRIGERATORS AND FREEZERSDesign
D022104 BROOKLYN GARDENS ELEMENTARY SCHOOL ELECTRICAL
BROOKLYN GARDENS ELEMENTARY SCHOOL 19IPDVS INSTALLATION$0 - $250K2024/05ELECTRICALDesign
D021759 BROOKLYN LAB SCHOOL - BROOKLYN BOILER ELECTRIFICATION
BROOKLYN LAB SCHOOL - BROOKLYN 19ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/06BOILER ELECTRIFICATIONDesign
BROOKLYN LAB SCHOOL - BROOKLYN 19LOW VOLTAGE ELECTRICAL SYSTEMS$4M OVER2024/06ELECTRICALDesign
BROOKLYN LAB SCHOOL - BROOKLYN 19ELECTRICAL SERVICE UPGRADE$4M OVER2024/06ELECTRICALDesign
D021850 BROOKLYN SCIENCE AND ENGINEERING ACADEMY GYMNASIUM
BROOKLYN SCIENCE AND ENGINEERING ACADEMY 18RESO A GYMNASIUM UPGRADE$1M - $4M2024/02GYMNASIUMDesign
D022328 BROOKLYN SCIENCE AND ENGINEERING ACADEMY ELECTRICAL
BROOKLYN SCIENCE AND ENGINEERING ACADEMY 18RESO A IPDVS CAMERA INSTALLATION$0 - $250K2024/04ELECTRICALDesign
D021855 BROOKLYN THEATRE ARTS H.S. - K AUDITORIUM UPGRADES
BROOKLYN THEATRE ARTS H.S. - K 18RESO A AUDITORIUM UPGRADE$750K - $1M2024/05AUDITORIUM UPGRADESDesign
P026400 CHRISTOPHER AVENUE COMMUNITY SCHOOL EXT. WORK
CHRISTOPHER AVENUE COMMUNITY SCHOOL 23ROOFS$4M OVER2024/01EXT. WORKDesign
CHRISTOPHER AVENUE COMMUNITY SCHOOL 23PARAPETS$4M OVER2024/01EXT. WORKDesign
CHRISTOPHER AVENUE COMMUNITY SCHOOL 23EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
CHRISTOPHER AVENUE COMMUNITY SCHOOL 23ROOF TOP UNIT$4M OVER2024/01BUILDING SYSTEMSDesign
CHRISTOPHER AVENUE COMMUNITY SCHOOL 23PAVED AREAS- CONCRETE$4M OVER2024/01SITEDesign
D021584 COBBLE HILL SCHL OF AMER. STUD-K EXT. WORK
COBBLE HILL SCHL OF AMER. STUD-K 15ROOFS$4M OVER2024/01EXT. WORKDesign
COBBLE HILL SCHL OF AMER. STUD-K 15PARAPETS$4M OVER2024/01EXT. WORKDesign
COBBLE HILL SCHL OF AMER. STUD-K 15EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
COBBLE HILL SCHL OF AMER. STUD-K 15FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
D020672 CULT ACAD ARTS AND SCI - BROOKLYN ROOM CONVERSIONS/UPGRADES
CULT ACAD ARTS AND SCI - BROOKLYN 18RESO A- CULINARY ARTS KITCHEN$1M - $4M2024/03ROOM CONVERSIONS/UPGRADESDesign
D021970 CULT ACAD ARTS AND SCI - BROOKLYN ACCESSIBILITY
CULT ACAD ARTS AND SCI - BROOKLYN 18PATH OF TRAVEL RESO A KITCHEN UPGRADE$500K - $750K2024/02ACCESSIBILITYDesign
D022099 EAST NEW YORK ELEMENTARY SCHOOL OF EXCELLENCE -K ELECTRICAL
EAST NEW YORK ELEMENTARY SCHOOL OF EXCELLENCE -K 19IPDVS INSTALLATION$250K - $500K2024/05ELECTRICALDesign
D021038 EDWARD R. MURROW HS - K EXT. WORK
EDWARD R. MURROW HS - K 21IDA FLOOD ELIMINATION$1M - $4M2024/01EXT. WORKDesign
EDWARD R. MURROW HS - K 21IDA GYM PARTITION REPLACEMENT$1M - $4M2024/01GYMNASIUMDesign
D019498 FORT HAMILTON HS - K ELECTRICAL
FORT HAMILTON HS - K 20REPLACE 6' FIRE DOMESTIC WATER MAIN VALVES$250K - $500K2024/01ELECTRICALDesign
D021215 FORT HAMILTON HS - K EXT. WORK
FORT HAMILTON HS - K 20IDA FLOOD ELIMINATION$4M OVER2024/02EXT. WORKDesign
FORT HAMILTON HS - K 20IDA HEATING PLANT UPGRADE$4M OVER2024/02BOILER/HEAT PUMPDesign
FORT HAMILTON HS - K 20IDA CLIMATE CONTROL$4M OVER2024/02BOILER/HEAT PUMPDesign
FORT HAMILTON HS - K 20NON-IDA CLIMATE CONTROL$4M OVER2024/02BOILER/HEAT PUMPDesign
FORT HAMILTON HS - K 20IDA INTERIOR SPACES$4M OVER2024/02INTERIORDesign
FORT HAMILTON HS - K 20IDA POOL BOILER$4M OVER2024/02BOILER/HEAT PUMPDesign
FORT HAMILTON HS - K 20IDA ELECTRICAL SYSTEMS$4M OVER2024/02ELECTRICALDesign
D021565 FRANKLIN D. ROOSEVELT HS - K EXT. WORK
FRANKLIN D. ROOSEVELT HS - K 20ROOFS$4M OVER2024/01EXT. WORKDesign
FRANKLIN D. ROOSEVELT HS - K 20PARAPETS$4M OVER2024/01EXT. WORKDesign
FRANKLIN D. ROOSEVELT HS - K 20EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
FRANKLIN D. ROOSEVELT HS - K 20WINDOWS$4M OVER2024/01EXT. WORKDesign
D022013 HIGH SCHOOL FOR CIVIL RIGHTS - K ATHLETIC FIELDS
HIGH SCHOOL FOR CIVIL RIGHTS - K 19FIELD HOUSE$4M OVER2024/05ATHLETIC FIELDSDesign
HIGH SCHOOL FOR CIVIL RIGHTS - K 19ATHLETIC FIELD$4M OVER2024/05ATHLETIC FIELDSDesign
D022340 HIGH SCHOOL FOR CIVIL RIGHTS - K ATHLETIC FIELDS
HIGH SCHOOL FOR CIVIL RIGHTS - K 19EARLY DEMO PACKAGE$1M - $4M2024/02ATHLETIC FIELDSDesign
D022031 HS FOR MEDICAL PROFESSIONS - K SCIENCE LAB UPGRADES
HS FOR MEDICAL PROFESSIONS - K 18RESO A SCIENCE LAB UPGRADE$750K - $1M2024/01SCIENCE LAB UPGRADESDesign
D022040 HS FOR MEDICAL PROFESSIONS - K ACCESSIBILITY
HS FOR MEDICAL PROFESSIONS - K 18PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE$0 - $250K2024/01ACCESSIBILITYDesign
D021738 I.S. 162 - BROOKLYN ACCESSIBILITY
I.S. 162 - BROOKLYN 32FULL PROGRAM ACCESSIBILITY$4M OVER2024/03ACCESSIBILITYDesign
D022240 I.S. 201 - BROOKLYN GYMNASIUM
I.S. 201 - BROOKLYN 20GYM FLOOR REPLACEMENT$1M - $4M2024/05GYMNASIUMDesign
D022267 I.S. 218 - BROOKLYN EXT. WORK
I.S. 218 - BROOKLYN 19EXTERIOR MASONRY$500K - $750K2024/04EXT. WORKDesign
D022082 I.S. 228 - BROOKLYN EXT. WORK
I.S. 228 - BROOKLYN 21ROOFS$4M OVER2024/06EXT. WORKDesign
I.S. 228 - BROOKLYN 21PARAPETS$4M OVER2024/06EXT. WORKDesign
I.S. 228 - BROOKLYN 21EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
I.S. 228 - BROOKLYN 21FLOOD ELIMINATION$4M OVER2024/06EXT. WORKDesign
I.S. 228 - BROOKLYN 21WINDOWS$4M OVER2024/06EXT. WORKDesign
P026387 I.S. 246 - BROOKLYN LIBRARY UPGRADES
I.S. 246 - BROOKLYN 17RESO A LIBRARY UPGRADE$500K - $750K2024/01LIBRARY UPGRADESDesign
I.S. 246 - BROOKLYN 17PATH OF TRAVEL RESO A LIBRARY UPGRADE$500K - $750K2024/01ACCESSIBILITYDesign
P026406 I.S. 259 - BROOKLYN SCIENCE LAB UPGRADES
I.S. 259 - BROOKLYN 20RESO A SCIENCE LAB UPGRADE$1M - $4M2024/01SCIENCE LAB UPGRADESDesign
I.S. 259 - BROOKLYN 20PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE$1M - $4M2024/01ACCESSIBILITYDesign
D022209 I.S. 267 - BROOKLYN WALK-IN REFRIGERATORS AND FREEZERS
I.S. 267 - BROOKLYN 16WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D021624 I.S. 281 - BROOKLYN EXT. WORK
I.S. 281 - BROOKLYN 21EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
I.S. 281 - BROOKLYN 21WINDOWS$4M OVER2024/03EXT. WORKDesign
I.S. 281 - BROOKLYN 21ROOFS$4M OVER2024/03EXT. WORKDesign
D020169 I.S. 285 - BROOKLYN SCIENCE LAB UPGRADES
I.S. 285 - BROOKLYN 18RESO A SCIENCE LAB UPGRADES$1M - $4M2024/03SCIENCE LAB UPGRADESDesign
D020170 I.S. 285 - BROOKLYN ACCESSIBILITY
I.S. 285 - BROOKLYN 18RESO A PATH OF TRAVEL SCIENCE LAB UPGRADES$0 - $250K2024/02ACCESSIBILITYDesign
D021062 I.S. 291 - BROOKLYN EXT. WORK
I.S. 291 - BROOKLYN 32IDA FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
I.S. 291 - BROOKLYN 32IDA INTERIOR SPACES$4M OVER2024/01INTERIORDesign
D021639 I.S. 291 - BROOKLYN ACCESSIBILITY
I.S. 291 - BROOKLYN 32PATH OF TRAVEL NON-IDA FLOOD ELIMINATION$0 - $250K2024/01ACCESSIBILITYDesign
D022189 I.S. 292 - BROOKLYN EXT. WORK
I.S. 292 - BROOKLYN 19ROOFS$4M OVER2024/04EXT. WORKDesign
I.S. 292 - BROOKLYN 19EXTERIOR MASONRY$4M OVER2024/04EXT. WORKDesign
D021860 I.S. 30 - BROOKLYN LIBRARY UPGRADES
I.S. 30 - BROOKLYN 20RESO A LIBRARY UPGRADE$250K - $500K2024/04LIBRARY UPGRADESDesign
D019438 I.S. 340 - BROOKLYN ELECTRICAL
I.S. 340 - BROOKLYN 13LOW VOLTAGE ELECTRICAL SYSTEMS$750K - $1M2024/01ELECTRICALDesign
D022186 I.S. 349 - BROOKLYN EXT. WORK
I.S. 349 - BROOKLYN 32ROOFS$4M OVER2024/05EXT. WORKDesign
I.S. 349 - BROOKLYN 32WINDOWS$4M OVER2024/05EXT. WORKDesign
I.S. 349 - BROOKLYN 32EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
D018437 I.S. 351 - BROOKLYN SCIENCE LAB UPGRADES
I.S. 351 - BROOKLYN 13RESO A COURTYARD GREENHOUSE$1M - $4M2024/01SCIENCE LAB UPGRADESDesign
D020638 I.S. 382 - BROOKLYN EXT. WORK
I.S. 382 - BROOKLYN 17PARAPET AND SIDE OF BUILDING DAMAGE @ K465$4M OVER2024/01EXT. WORKDesign
I.S. 382 - BROOKLYN 17EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
I.S. 382 - BROOKLYN 17ROOFS$4M OVER2024/01EXT. WORKDesign
I.S. 382 - BROOKLYN 17FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
I.S. 382 - BROOKLYN 17WINDOWS$4M OVER2024/01EXT. WORKDesign
D022091 I.S. 394 - BROOKLYN EXT. WORK
I.S. 394 - BROOKLYN 17ROOFS$4M OVER2024/06EXT. WORKDesign
I.S. 394 - BROOKLYN 17EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
I.S. 394 - BROOKLYN 17WINDOWS$4M OVER2024/06EXT. WORKDesign
I.S. 394 - BROOKLYN 17FLOOD ELIMINATION$4M OVER2024/06EXT. WORKDesign
I.S. 394 - BROOKLYN 17PARAPETS$4M OVER2024/06EXT. WORKDesign
P026401 I.S. 452 LIBRARY UPGRADES
I.S. 452 19RESO A LIBRARY UPGRADE$750K - $1M2024/01LIBRARY UPGRADESDesign
I.S. 452 19PATH OF TRAVEL RESO A LIBRARY UPGRADE$750K - $1M2024/01ACCESSIBILITYDesign
D021863 I.S. 518 - BROOKLYN AUDITORIUM UPGRADES
I.S. 518 - BROOKLYN 23RESO A AUDITORIUM UPGRADE$250K - $500K2024/01AUDITORIUM UPGRADESDesign
P026407 I.S. 577 - BROOKLYN ELECTRICAL
I.S. 577 - BROOKLYN 14IPDVS INSTALLATION$250K - $500K2024/01ELECTRICALDesign
P.S. 346 - BROOKLYN 19IPDVS INSTALLATION$250K - $500K2024/01ELECTRICALDesign
D018776 I.S. 61 - BROOKLYN EXT. WORK
I.S. 61 - BROOKLYN 17ROOFS$4M OVER2024/03EXT. WORKDesign
I.S. 61 - BROOKLYN 17PARAPETS$4M OVER2024/03EXT. WORKDesign
I.S. 61 - BROOKLYN 17WINDOWS$4M OVER2024/03EXT. WORKDesign
I.S. 61 - BROOKLYN 17EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
I.S. 61 - BROOKLYN 17DOORS$4M OVER2024/03SCHOOL SAFETYDesign
I.S. 61 - BROOKLYN 17SIDEWALK ELEVATOR$4M OVER2024/03BUILDING SYSTEMSDesign
I.S. 61 - BROOKLYN 17HVAC UPGRADE FOR CLASSROOMS AND PA SPACES$4M OVER2024/03BUILDING SYSTEMSDesign
I.S. 61 - BROOKLYN 17ELECTRICAL UPGRADE$4M OVER2024/03ELECTRICALDesign
I.S. 61 - BROOKLYN 17HOT WATER HEATERS$4M OVER2024/03BOILER/HEAT PUMPDesign
I.S. 61 - BROOKLYN 17FIRE ALARM SYSTEM REPLACEMENT$4M OVER2024/03ELECTRICALDesign
D022222 I.S. 71 - BROOKLYN WALK-IN REFRIGERATORS AND FREEZERS
I.S. 71 - BROOKLYN 14WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D022171 I.S. 722 - BROOKLYN BUILDING SYSTEMS
I.S. 722 - BROOKLYN 17CHILLER REPLACEMENT @ K391$1M - $4M2024/04BUILDING SYSTEMSDesign
I.S. 722 - BROOKLYN 17FIRE ALARM SYSTEM$1M - $4M2024/04ELECTRICALDesign
D021248 I.S. 78 - BROOKLYN BOILER/HEAT PUMP
I.S. 78 - BROOKLYN 22PLANYC CLIMATE CONTROL$4M OVER2024/01BOILER/HEAT PUMPDesign
I.S. 78 - BROOKLYN 22PLANYC BOILER CONVERSION$4M OVER2024/01BOILER/HEAT PUMPDesign
I.S. 78 - BROOKLYN 22FIRE ALARM SYSTEM REPLACEMENT$4M OVER2024/01ELECTRICALDesign
D022264 IT TAKES A VILLAGE ACADEMY - K ELECTRICAL
IT TAKES A VILLAGE ACADEMY - K 18FIRE ALARM SYSTEM REPLACEMENT$1M - $4M2024/03ELECTRICALDesign
P026256 IT TAKES A VILLAGE ACADEMY - K ROOM CONVERSIONS/UPGRADES
IT TAKES A VILLAGE ACADEMY - K 18CAFETERIA UPGRADE$4M OVER2024/01ROOM CONVERSIONS/UPGRADESDesign
IT TAKES A VILLAGE ACADEMY - K 18PATH OF TRAVEL CAFETERIA UPGRADE$4M OVER2024/01ACCESSIBILITYDesign
D022187 J.H.S. 126 - BROOKLYN EXT. WORK
J.H.S. 126 - BROOKLYN 14ROOFS$4M OVER2024/05EXT. WORKDesign
J.H.S. 126 - BROOKLYN 14FLOOD ELIMINATION$4M OVER2024/05EXT. WORKDesign
J.H.S. 126 - BROOKLYN 14EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
D021897 J.H.S. 50 - BROOKLYN BUILDING SYSTEMS
J.H.S. 50 - BROOKLYN 14REINFORCING SUPPORT ELEMENTS$1M - $4M2024/01BUILDING SYSTEMSDesign
D021442 JAMES MADISON HS - BROOKLYN EXT. WORK
JAMES MADISON HS - BROOKLYN 22EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
JAMES MADISON HS - BROOKLYN 22PARAPETS$4M OVER2024/06EXT. WORKDesign
JAMES MADISON HS - BROOKLYN 22ROOFS$4M OVER2024/06EXT. WORKDesign
JAMES MADISON HS - BROOKLYN 22WINDOWS$4M OVER2024/06EXT. WORKDesign
D021706 K036 SPED - BROOKLYN BUILDING SYSTEMS
K036 SPED - BROOKLYN 19ELEVATOR MODERNIZATION$1M - $4M2024/03BUILDING SYSTEMSDesign
K036 SPED - BROOKLYN 19FIRE ALARM SYSTEM REPLACEMENT$1M - $4M2024/03ELECTRICALDesign
K036 SPED - BROOKLYN 19ELECTRICAL SYSTEMS$1M - $4M2024/03ELECTRICALDesign
D022188 K140 SPED - BROOKLYN EXT. WORK
K140 SPED - BROOKLYN 13ROOFS$4M OVER2024/05EXT. WORKDesign
K140 SPED - BROOKLYN 13EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
D022047 K372 SPED - BROOKLYN PLAYGROUNDS
K372 SPED - BROOKLYN 15PLAYGROUND UPGRADE$500K - $750K2024/02PLAYGROUNDSDesign
D022369 K372 SPED - BROOKLYN ACCESSIBILITY
K372 SPED - BROOKLYN 15PATH OF TRAVEL PLAYGROUND UPGRADE$0 - $250K2024/07ACCESSIBILITYScope
D021012 K753 SPED - BROOKLYN ACCESSIBILITY
K753 SPED - BROOKLYN 13FULL PROGRAM ACCESSIBILITY$1M - $4M2024/01ACCESSIBILITYDesign
D021570 K753 SPED - BROOKLYN EXT. WORK
K753 SPED - BROOKLYN 13ROOFS$4M OVER2024/01EXT. WORKDesign
K753 SPED - BROOKLYN 13PARAPETS$4M OVER2024/01EXT. WORKDesign
D019802 K811 SPED - BROOKLYN ACCESSIBILITY
K811 SPED - BROOKLYN 22FULL PROGRAM ACCESSIBILITY$4M OVER2024/03ACCESSIBILITYDesign
K811 SPED - BROOKLYN 22LOW VOLTAGE ELECTRICAL SYSTEM$4M OVER2024/03ELECTRICALDesign
D020898 LEADERS HIGH SCHOOL - K ACCESSIBILITY
LEADERS HIGH SCHOOL - K 21PATH OF TRAVEL RESO A LIBRARY UPGRADE$750K - $1M2024/01ACCESSIBILITYDesign
LEADERS HIGH SCHOOL - K 21RESO A LIBRARY UPGRADE$750K - $1M2024/01LIBRARY UPGRADESDesign
D021739 LIBERTY AVENUE MIDDLE SCHOOL ACCESSIBILITY
LIBERTY AVENUE MIDDLE SCHOOL 19FULL PROGRAM ACCESSIBILITY$4M OVER2024/03ACCESSIBILITYDesign
LIBERTY AVENUE MIDDLE SCHOOL 19FIRE ALARM SYSTEM REPLACEMENT$4M OVER2024/03ELECTRICALDesign
D022223 LIBERTY AVENUE MIDDLE SCHOOL WALK-IN REFRIGERATORS AND FREEZERS
LIBERTY AVENUE MIDDLE SCHOOL 19WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2024/04WALK-IN REFRIGERATORS AND FREEZERSDesign
D020776 LOVE IN ACTION DAY CARE LEASES
LOVE IN ACTION DAY CARE 23ACS EARLY LEARN LEASE RENEWAL$250K - $500K2024/05LEASESDesign
D021305 MIDWOOD HS - BROOKLYN ATHLETIC FIELDS
MIDWOOD HS - BROOKLYN 21IDA FLOOD ELIMINATION$1M - $4M2024/01ATHLETIC FIELDSDesign
MIDWOOD HS - BROOKLYN 21IDA PAVED AREAS- BLACKTOP$1M - $4M2024/01SITEDesign
MIDWOOD HS - BROOKLYN 21IDA HEATING PLANT UPGRADE$1M - $4M2024/01BOILER/HEAT PUMPDesign
D021659 MOSDOTH DAY CARE CENTER, INC. LEASES
MOSDOTH DAY CARE CENTER, INC. 17ACS EARLY LEARN RENEWAL$250K - $500K2024/06LEASESDesign
D021503 P.S. 1 - BROOKLYN ACCESSIBILITY
P.S. 1 - BROOKLYN 15FULL PROGRAM ACCESSIBILITY$4M OVER2024/01ACCESSIBILITYDesign
P.S. 1 - BROOKLYN 15FIRE ALARM SYSTEM REPLACEMENT$4M OVER2024/01ELECTRICALDesign
D021552 P.S. 1 - BROOKLYN EXT. WORK
P.S. 1 - BROOKLYN 15ROOFS$1M - $4M2024/01EXT. WORKDesign
P.S. 1 - BROOKLYN 15PARAPETS$1M - $4M2024/01EXT. WORKDesign
P.S. 1 - BROOKLYN 15EXTERIOR MASONRY$1M - $4M2024/01EXT. WORKDesign
D021861 P.S. 104 - BROOKLYN PLAYGROUNDS
P.S. 104 - BROOKLYN 20RESO A OUTDOOR STEM CENTER$500K - $750K2024/07PLAYGROUNDSScope
D022201 P.S. 106 - BROOKLYN EXT. WORK
P.S. 106 - BROOKLYN 32EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
P.S. 106 - BROOKLYN 32FLOOD ELIMINATION$4M OVER2024/05EXT. WORKDesign
P.S. 106 - BROOKLYN 32ROOFS$4M OVER2024/05EXT. WORKDesign
D021811 P.S. 107 - BROOKLYN PLAYGROUNDS
P.S. 107 - BROOKLYN 15RESO A PLAYGROUND UPGRADE$500K - $750K2024/02PLAYGROUNDSDesign
D021822 P.S. 115 - BROOKLYN LIBRARY UPGRADES
P.S. 115 - BROOKLYN 18RESO A LIBRARY UPGRADE$500K - $750K2024/02LIBRARY UPGRADESDesign
D021553 P.S. 12 - BROOKLYN EXT. WORK
P.S. 12 - BROOKLYN 23ROOFS$4M OVER2024/06EXT. WORKDesign
P.S. 12 - BROOKLYN 23PARAPETS$4M OVER2024/06EXT. WORKDesign
P.S. 12 - BROOKLYN 23WINDOWS$4M OVER2024/06EXT. WORKDesign
P.S. 12 - BROOKLYN 23EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
P.S. 12 - BROOKLYN 23FENCING$4M OVER2024/06SITEDesign
D022206 P.S. 12 - BROOKLYN WALK-IN REFRIGERATORS AND FREEZERS
P.S. 12 - BROOKLYN 23WALK-IN REFRIGERATORS AND FREEZERS$750K - $1M2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D020536 P.S. 120 - BROOKLYN ACCESSIBILITY
P.S. 120 - BROOKLYN 14FULL PROGRAM ACCESSIBILITY$4M OVER2024/01ACCESSIBILITYDesign
P.S. 120 - BROOKLYN 14LOW VOLTAGE ELECTRICAL SYSTEM$4M OVER2024/01ELECTRICALDesign
D021530 P.S. 120 - BROOKLYN EXT. WORK
P.S. 120 - BROOKLYN 14ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 120 - BROOKLYN 14PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 120 - BROOKLYN 14EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
D022074 P.S. 139 - BROOKLYN EXT. WORK
P.S. 139 - BROOKLYN 22EXTERIOR MASONRY$250K - $500K2024/03EXT. WORKDesign
P026399 P.S. 139 - BROOKLYN AUDITORIUM UPGRADES
P.S. 139 - BROOKLYN 22RESO A AUDITORIUM UPGRADE$750K - $1M2024/01AUDITORIUM UPGRADESDesign
P.S. 139 - BROOKLYN 22PATH OF TRAVEL RESO A AUDITORIUM UPGRADE$750K - $1M2024/01ACCESSIBILITYDesign
D022331 P.S. 145 - BROOKLYN ELECTRICAL
P.S. 145 - BROOKLYN 32RESO A PA SYSTEM UPGRADE$0 - $250K2024/06ELECTRICALScope
P026384 P.S. 145 - BROOKLYN ELECTRICAL
P.S. 145 - BROOKLYN 32IPDVS CAMERA INSTALLATION$250K - $500K2024/01ELECTRICALDesign
P.S. 151 - BROOKLYN 32IPDVS CAMERA INSTALLATION$250K - $500K2024/01ELECTRICALDesign
D021275 P.S. 15 - BROOKLYN PLAYGROUNDS
P.S. 15 - BROOKLYN 15RESO A PLAYGROUND UPGRADE$1M - $4M2024/05PLAYGROUNDSDesign
P026381 P.S. 15 - BROOKLYN ELECTRICAL
P.S. 15 - BROOKLYN 15IPDVS CAMERA INSTALLATION$250K - $500K2024/01ELECTRICALDesign
P.S. 24 - BROOKLYN 15IPDVS CAMERA INSTALLATION$250K - $500K2024/01ELECTRICALDesign
D022087 P.S. 156 - BROOKLYN EXT. WORK
P.S. 156 - BROOKLYN 23ROOFS$4M OVER2024/05EXT. WORKDesign
P.S. 156 - BROOKLYN 23EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
D019420 P.S. 157 - BROOKLYN EXT. WORK
P.S. 157 - BROOKLYN 14EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
P.S. 157 - BROOKLYN 14PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 157 - BROOKLYN 14FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
P.S. 157 - BROOKLYN 14ROOFS$4M OVER2024/01EXT. WORKDesign
D022208 P.S. 157 - BROOKLYN WALK-IN REFRIGERATORS AND FREEZERS
P.S. 157 - BROOKLYN 14WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D018658 P.S. 169 - BROOKLYN ACCESSIBILITY
P.S. 169 - BROOKLYN 15FULL PROGRAM ACCESSIBILITY$4M OVER2024/03ACCESSIBILITYDesign
P.S. 169 - BROOKLYN 15LOW VOLTAGE ELECTRICAL SYSTEM$4M OVER2024/03ELECTRICALDesign
D020186 P.S. 169 - BROOKLYN PLAYGROUNDS
P.S. 169 - BROOKLYN 15RESO A PLAYGROUND UPGRADE$500K - $750K2024/03PLAYGROUNDSDesign
D021554 P.S. 18 - BROOKLYN EXT. WORK
P.S. 18 - BROOKLYN 14ROOFS$4M OVER2024/03EXT. WORKDesign
P.S. 18 - BROOKLYN 14PARAPETS$4M OVER2024/03EXT. WORKDesign
P.S. 18 - BROOKLYN 14EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
P.S. 18 - BROOKLYN 14PLAYGROUND UPGRADE$4M OVER2024/03PLAYGROUNDSDesign
D022512 P.S. 18 - BROOKLYN ACCESSIBILITY
P.S. 18 - BROOKLYN 14PATH OF TRAVEL PLAYGROUND UPGRADE$0 - $250K2024/04ACCESSIBILITYDesign
D021902 P.S. 185 - BROOKLYN FLOORS
P.S. 185 - BROOKLYN 20CLASSROOM FLOORING$1M - $4M2024/04FLOORSDesign
D022362 P.S. 185 - BROOKLYN ACCESSIBILITY
P.S. 185 - BROOKLYN 20PATH OF TRAVEL CLASSROOM FLOORING$0 - $250K2024/04ACCESSIBILITYDesign
D022106 P.S. 190 - BROOKLYN ELECTRICAL
P.S. 190 - BROOKLYN 19IPDVS INSTALLATION$250K - $500K2024/03ELECTRICALDesign
D021911 P.S. 191 - BROOKLYN BOILER ELECTRIFICATION
P.S. 191 - BROOKLYN 17ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/06BOILER ELECTRIFICATIONDesign
P.S. 191 - BROOKLYN 17WINDOWS$4M OVER2024/06EXT. WORKDesign
P.S. 191 - BROOKLYN 17ELECTRICAL SERVICE UPGRADE$4M OVER2024/06ELECTRICALDesign
P.S. 191 - BROOKLYN 17FIRE ALARM$4M OVER2024/06ELECTRICALDesign
D020630 P.S. 193 - BROOKLYN ACCESSIBILITY
P.S. 193 - BROOKLYN 22FULL PROGRAM ACCESSIBILITY$4M OVER2024/01ACCESSIBILITYDesign
P.S. 193 - BROOKLYN 22LOW VOLTAGE ELECTRICAL SYSTEM$4M OVER2024/01ELECTRICALDesign
D021559 P.S. 193 - BROOKLYN EXT. WORK
P.S. 193 - BROOKLYN 22PARAPETS$4M OVER2024/03EXT. WORKDesign
P.S. 193 - BROOKLYN 22EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
P.S. 193 - BROOKLYN 22ROOFS$4M OVER2024/03EXT. WORKDesign
D021560 P.S. 199 - BROOKLYN EXT. WORK
P.S. 199 - BROOKLYN 21ROOFS$4M OVER2024/06EXT. WORKDesign
P.S. 199 - BROOKLYN 21PARAPETS$4M OVER2024/06EXT. WORKDesign
P.S. 199 - BROOKLYN 21EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
P.S. 199 - BROOKLYN 21WINDOWS$4M OVER2024/06EXT. WORKDesign
D021221 P.S. 20 - BROOKLYN ACCESSIBILITY
P.S. 20 - BROOKLYN 13FULL PROGRAM ACCESSIBILITY$4M OVER2024/02ACCESSIBILITYDesign
P.S. 20 - BROOKLYN 13PLAYGROUND RENOVATION$4M OVER2024/02PLAYGROUNDSDesign
P.S. 20 - BROOKLYN 13FIRE ALARM SYSTEM$4M OVER2024/02ELECTRICALDesign
D021567 P.S. 20 - BROOKLYN EXT. WORK
P.S. 20 - BROOKLYN 13ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 20 - BROOKLYN 13PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 20 - BROOKLYN 13EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
D022276 P.S. 20 - BROOKLYN EXT. WORK
P.S. 20 - BROOKLYN 13RESO A GREEN ROOF$4M OVER2024/07EXT. WORKScope
D021758 P.S. 209 - BROOKLYN PLAYGROUNDS
P.S. 209 - BROOKLYN 21TCU REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/01PLAYGROUNDSDesign
D021561 P.S. 221 - BROOKLYN EXT. WORK
P.S. 221 - BROOKLYN 17ROOFS$4M OVER2024/03EXT. WORKDesign
P.S. 221 - BROOKLYN 17PARAPETS$4M OVER2024/03EXT. WORKDesign
P.S. 221 - BROOKLYN 17EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
P.S. 221 - BROOKLYN 17FLOOD ELIMINATION$4M OVER2024/03EXT. WORKDesign
D020924 P.S. 222 - BROOKLYN PLAYGROUNDS
P.S. 222 - BROOKLYN 22RESO A PLAYGROUND UPGRADE$500K - $750K2024/02PLAYGROUNDSDesign
D019402 P.S. 224 - BROOKLYN EXT. WORK
P.S. 224 - BROOKLYN 19EXTERIOR MASONRY$4M OVER2024/02EXT. WORKDesign
P.S. 224 - BROOKLYN 19PARAPETS$4M OVER2024/02EXT. WORKDesign
P.S. 224 - BROOKLYN 19FLOOD ELIMINATION$4M OVER2024/02EXT. WORKDesign
P.S. 224 - BROOKLYN 19ROOFS$4M OVER2024/02EXT. WORKDesign
P.S. 224 - BROOKLYN 19AIR CONDENSING UNIT$4M OVER2024/02BUILDING SYSTEMSDesign
D021818 P.S. 229 - BROOKLYN LIBRARY UPGRADES
P.S. 229 - BROOKLYN 20RESO A LIBRARY UPGRADE$500K - $750K2024/01LIBRARY UPGRADESDesign
D019244 P.S. 235 - BROOKLYN BUILDING SYSTEMS
P.S. 235 - BROOKLYN 18REPLACE (3) ROOF TOP UNITS$1M - $4M2024/01BUILDING SYSTEMSDesign
P.S. 235 - BROOKLYN 18ROOFS$1M - $4M2024/01EXT. WORKDesign
D021876 P.S. 24 - BROOKLYN PLAYGROUNDS
P.S. 24 - BROOKLYN 15RESO A PLAYGROUND UPGRADE$500K - $750K2024/07PLAYGROUNDSScope
D022261 P.S. 243 - BROOKLYN EXT. WORK
P.S. 243 - BROOKLYN 16TERRACOTTA PANEL REPLACEMENT$1M - $4M2024/04EXT. WORKDesign
P026389 P.S. 251 - BROOKLYN LIBRARY UPGRADES
P.S. 251 - BROOKLYN 22RESO A (MA) LIBRARY UPGRADE$500K - $750K2024/01LIBRARY UPGRADESDesign
P.S. 251 - BROOKLYN 22PATH OF TRAVEL RESO A LIBRARY UPGRADE$500K - $750K2024/01ACCESSIBILITYDesign
D020446 P.S. 253 - BROOKLYN MISCELLANEOUS
P.S. 253 - BROOKLYN 21EXISTING BUILDING RENOVATION WORK$1M - $4M2024/04MISCELLANEOUSDesign
D021747 P.S. 256 - BROOKLYN EXT. WORK
P.S. 256 - BROOKLYN 13PARAPETS$4M OVER2024/05EXT. WORKDesign
P.S. 256 - BROOKLYN 13ROOFS$4M OVER2024/05EXT. WORKDesign
P.S. 256 - BROOKLYN 13EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
D021740 P.S. 257 - BROOKLYN ACCESSIBILITY
P.S. 257 - BROOKLYN 14FULL PROGRAM ACCESSIBILITY$4M OVER2024/02ACCESSIBILITYDesign
P.S. 257 - BROOKLYN 14LOW VOLTAGE ELECTRICAL SYSTEMS$4M OVER2024/02ELECTRICALDesign
D022090 P.S. 257 - BROOKLYN EXT. WORK
P.S. 257 - BROOKLYN 14ROOFS$4M OVER2024/06EXT. WORKDesign
P.S. 257 - BROOKLYN 14EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
P026402 P.S. 257 - BROOKLYN ELECTRICAL
P.S. 257 - BROOKLYN 14IPDVS CAMERA INSTALLATION$250K - $500K2024/01ELECTRICALDesign
P.S. 297 - BROOKLYN 14IPDVS CAMERA INSTALLATION$250K - $500K2024/01ELECTRICALDesign
D018694 P.S. 261 - BROOKLYN EXT. WORK
P.S. 261 - BROOKLYN 15FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
P.S. 261 - BROOKLYN 15PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 261 - BROOKLYN 15ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 261 - BROOKLYN 15PLAYGROUND REDEVELOPMENT$4M OVER2024/01PLAYGROUNDSDesign
D021685 P.S. 261 - BROOKLYN PLAYGROUNDS
P.S. 261 - BROOKLYN 15TCU REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/02PLAYGROUNDSDesign
D021744 P.S. 261 - BROOKLYN ACCESSIBILITY
P.S. 261 - BROOKLYN 15PATH OF TRAVEL TCU REMOVAL/PLAYGROUND REDEVELOPMENT$0 - $250K2024/02ACCESSIBILITYDesign
D021814 P.S. 262 - BROOKLYN PLAYGROUNDS
P.S. 262 - BROOKLYN 16RESO A PLAYGROUND UPGRADE$1M - $4M2024/04PLAYGROUNDSDesign
D021982 P.S. 262 - BROOKLYN ACCESSIBILITY
P.S. 262 - BROOKLYN 16PATH OF TRAVEL RESO A PLAYGROUND UPGRADE$250K - $500K2024/05ACCESSIBILITYDesign
D021849 P.S. 264 - BROOKLYN AUDITORIUM UPGRADES
P.S. 264 - BROOKLYN 20RESO A AUDITORIUM UPGRADE$250K - $500K2024/01AUDITORIUM UPGRADESDesign
P026386 P.S. 272 - BROOKLYN LIBRARY UPGRADES
P.S. 272 - BROOKLYN 18RESO A MULTIMEDIA CENTER$500K - $750K2024/01LIBRARY UPGRADESDesign
P.S. 272 - BROOKLYN 18PATH OF TRAVEL RESO A MULTIMEDIA CENTER$500K - $750K2024/01ACCESSIBILITYDesign
D017767 P.S. 284 - BROOKLYN MISCELLANEOUS
P.S. 284 - BROOKLYN 23SWIMMING POOL$4M OVER2024/03MISCELLANEOUSDesign
D020190 P.S. 284 - BROOKLYN ACCESSIBILITY
P.S. 284 - BROOKLYN 23RESO A PATH OF TRAVEL PLAYGROUND UPGRADE$0 - $250K2024/01ACCESSIBILITYDesign
D020192 P.S. 284 - BROOKLYN PLAYGROUNDS
P.S. 284 - BROOKLYN 23RESO A PLAYGROUND UPGRADE$250K - $500K2024/01PLAYGROUNDSDesign
D021524 P.S. 284 - BROOKLYN EXT. WORK
P.S. 284 - BROOKLYN 23ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 284 - BROOKLYN 23PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 284 - BROOKLYN 23EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
P.S. 284 - BROOKLYN 23WINDOWS$4M OVER2024/01EXT. WORKDesign
P.S. 284 - BROOKLYN 23EXTERIOR DOORS$4M OVER2024/01SCHOOL SAFETYDesign
P.S. 284 - BROOKLYN 23FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
D022060 P.S. 284 - BROOKLYN ACCESSIBILITY
P.S. 284 - BROOKLYN 23PATH OF TRAVEL SWIMMING POOL$0 - $250K2024/03ACCESSIBILITYDesign
D021504 P.S. 29 - BROOKLYN ACCESSIBILITY
P.S. 29 - BROOKLYN 15FULL PROGRAM ACCESSIBILITY$4M OVER2024/01ACCESSIBILITYDesign
P.S. 29 - BROOKLYN 15LOW VOLTAGE ELECTRICAL SYSTEMS$4M OVER2024/01ELECTRICALDesign
D021710 P.S. 308 - BROOKLYN PLAYGROUNDS
P.S. 308 - BROOKLYN 16PLAYGROUND UPGRADE$1M - $4M2024/02PLAYGROUNDSDesign
D019397 P.S. 31 - BROOKLYN ACCESSIBILITY
P.S. 31 - BROOKLYN 14FULL PROGRAM ACCESSIBILITY$4M OVER2024/01ACCESSIBILITYDesign
D021824 P.S. 312 - BROOKLYN LIBRARY UPGRADES
P.S. 312 - BROOKLYN 22RESO A LIBRARY UPGRADE$1M - $4M2024/02LIBRARY UPGRADESDesign
D021714 P.S. 315 - BROOKLYN BOILER/HEAT PUMP
P.S. 315 - BROOKLYN 22HVAC UPGRADE$4M OVER2024/05BOILER/HEAT PUMPDesign
P.S. 315 - BROOKLYN 22BMS UPGRADE$4M OVER2024/05BOILER/HEAT PUMPDesign
D022181 P.S. 315 - BROOKLYN EXT. WORK
P.S. 315 - BROOKLYN 22ROOFS$4M OVER2024/06EXT. WORKDesign
P.S. 315 - BROOKLYN 22EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
P.S. 315 - BROOKLYN 22WINDOWS$4M OVER2024/06EXT. WORKDesign
P.S. 315 - BROOKLYN 22PARAPETS$4M OVER2024/06EXT. WORKDesign
P.S. 315 - BROOKLYN 22FLOOD ELIMINATION$4M OVER2024/06EXT. WORKDesign
P.S. 315 - BROOKLYN 22PAVED AREA- CONCRETE$4M OVER2024/06SITEDesign
D021823 P.S. 316 - BROOKLYN AUDITORIUM UPGRADES
P.S. 316 - BROOKLYN 17RESO A AUDITORIUM UPGRADE$250K - $500K2024/03AUDITORIUM UPGRADESDesign
D022190 P.S. 327 - BROOKLYN EXT. WORK
P.S. 327 - BROOKLYN 23ROOFS$4M OVER2024/03EXT. WORKDesign
P.S. 327 - BROOKLYN 23PARAPETS$4M OVER2024/03EXT. WORKDesign
P.S. 327 - BROOKLYN 23EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
D021562 P.S. 329 - BROOKLYN EXT. WORK
P.S. 329 - BROOKLYN 21ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 329 - BROOKLYN 21PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 329 - BROOKLYN 21EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
D022163 P.S. 375 - BROOKLYN EXT. WORK
P.S. 375 - BROOKLYN 17ROOFS$4M OVER2024/04EXT. WORKDesign
P.S. 375 - BROOKLYN 17PARAPETS$4M OVER2024/04EXT. WORKDesign
P.S. 375 - BROOKLYN 17EXTERIOR MASONRY$4M OVER2024/04EXT. WORKDesign
P.S. 375 - BROOKLYN 17FLOOD ELIMINATION$4M OVER2024/04EXT. WORKDesign
D019250 P.S. 384 - BROOKLYN EXT. WORK
P.S. 384 - BROOKLYN 32ROOF REPLACEMENT$4M OVER2024/01EXT. WORKDesign
P.S. 384 - BROOKLYN 32FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
P.S. 384 - BROOKLYN 32PARAPETS$4M OVER2024/01EXT. WORKDesign
D022315 P.S. 39 - BROOKLYN ELECTRICAL
P.S. 39 - BROOKLYN 15RESO A ELECTRICAL UPGRADE$0 - $250K2024/06ELECTRICALScope
D020535 P.S. 45 - BROOKLYN ACCESSIBILITY
P.S. 45 - BROOKLYN 32FULL PROGRAM ACCESSIBILITY$4M OVER2024/01ACCESSIBILITYDesign
D020761 P.S. 45 - BROOKLYN EXT. WORK
P.S. 45 - BROOKLYN 32ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 45 - BROOKLYN 32EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
P.S. 45 - BROOKLYN 32ROOFTOP EXHAUST FAN REPLACEMENT$4M OVER2024/01BUILDING SYSTEMSDesign
D021753 P.S. 503 - BROOKLYN BUILDING SYSTEMS
P.S. 503 - BROOKLYN 20CHILLER REPLACEMENT$4M OVER2024/01BUILDING SYSTEMSDesign
P.S. 503 - BROOKLYN 20AHU REPLACEMENT$4M OVER2024/01BUILDING SYSTEMSDesign
P.S. 503 - BROOKLYN 20BMS UPGRADE$4M OVER2024/01BOILER/HEAT PUMPDesign
D019398 P.S. 54 - BROOKLYN ACCESSIBILITY
P.S. 54 - BROOKLYN 13FULL PROGRAM ACCESSIBILITY$4M OVER2024/01ACCESSIBILITYDesign
P.S. 54 - BROOKLYN 13FIRE ALARM REPLACEMENT$4M OVER2024/01ELECTRICALDesign
D021566 P.S. 54 - BROOKLYN EXT. WORK
P.S. 54 - BROOKLYN 13ROOFS$4M OVER2024/04EXT. WORKDesign
P.S. 54 - BROOKLYN 13PARAPETS$4M OVER2024/04EXT. WORKDesign
P.S. 54 - BROOKLYN 13EXTERIOR MASONRY$4M OVER2024/04EXT. WORKDesign
D021846 P.S. 6 - BROOKLYN AUDITORIUM UPGRADES
P.S. 6 - BROOKLYN 17RESO A AUDITORIUM UPGRADE$250K - $500K2024/01AUDITORIUM UPGRADESDesign
D021515 P.S. 67 - BROOKLYN ACCESSIBILITY
P.S. 67 - BROOKLYN 13FULL PROGRAM ACCESSIBILITY$4M OVER2024/03ACCESSIBILITYDesign
P.S. 67 - BROOKLYN 13PA SYSTEM REPLACEMENT$4M OVER2024/03ELECTRICALDesign
D022207 P.S. 705 - BROOKLYN WALK-IN REFRIGERATORS AND FREEZERS
P.S. 705 - BROOKLYN 17WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D021827 P.S. 748 - BROOKLYN ELECTRICAL
P.S. 748 - BROOKLYN 20RESO A ELECTRICAL UPGRADE$0 - $250K2024/03ELECTRICALDesign
D022170 P.S. 748 - BROOKLYN EXT. WORK
P.S. 748 - BROOKLYN 20EXTERIOR MASONRY$1M - $4M2024/03EXT. WORKDesign
P.S. 748 - BROOKLYN 20PARAPETS$1M - $4M2024/03EXT. WORKDesign
D021821 P.S. 8 - BROOKLYN PLAYGROUNDS
P.S. 8 - BROOKLYN 13RESO A PLAYGROUND UPGRADE$250K - $500K2024/02PLAYGROUNDSDesign
D021568 P.S. 81 - BROOKLYN EXT. WORK
P.S. 81 - BROOKLYN 16ROOFS$4M OVER2024/03EXT. WORKDesign
P.S. 81 - BROOKLYN 16EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
P.S. 81 - BROOKLYN 16FLOOD ELIMINATION$4M OVER2024/03EXT. WORKDesign
D020645 P.S. 84 - BROOKLYN ACCESSIBILITY
P.S. 84 - BROOKLYN 14FULL PROGRAM ACCESSIBILITY$4M OVER2024/01ACCESSIBILITYDesign
D021556 P.S. 86 - BROOKLYN EXT. WORK
P.S. 86 - BROOKLYN 32ROOFS$1M - $4M2024/01EXT. WORKDesign
P.S. 86 - BROOKLYN 32EXTERIOR MASONRY$1M - $4M2024/01EXT. WORKDesign
P.S. 86 - BROOKLYN 32FLOOD ELIMINATION$1M - $4M2024/01EXT. WORKDesign
D020806 P.S. 90 - BROOKLYN EXT. WORK
P.S. 90 - BROOKLYN 21FLOOD ELIMINATION$4M OVER2024/03EXT. WORKDesign
P.S. 90 - BROOKLYN 21ROOFS$4M OVER2024/03EXT. WORKDesign
P.S. 90 - BROOKLYN 21PARAPETS$4M OVER2024/03EXT. WORKDesign
P.S. 90 - BROOKLYN 21EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
D021142 P.S. 90 - BROOKLYN EXT. WORK
P.S. 90 - BROOKLYN 21RESO A ROOFTOP GARDEN$4M OVER2024/03EXT. WORKDesign
D021114 P.S. 94 - BROOKLYN BUILDING SYSTEMS
P.S. 94 - BROOKLYN 15VENTILATION$4M OVER2024/01BUILDING SYSTEMSDesign
P.S. 94 - BROOKLYN 15FIRE ALARM SYSTEM REPLACEMENT$4M OVER2024/01ELECTRICALDesign
P.S. 94 - BROOKLYN 15BMS UPGRADE$4M OVER2024/01BOILER/HEAT PUMPDesign
D017779 P.S. 97 - BROOKLYN BOILER/HEAT PUMP
P.S. 97 - BROOKLYN 21PLANYC BOILER CONVERSION$4M OVER2024/01BOILER/HEAT PUMPDesign
D018260 P.S. 97 - BROOKLYN BOILER/HEAT PUMP
P.S. 97 - BROOKLYN 21PLANYC CLIMATE CONTROL$1M - $4M2024/01BOILER/HEAT PUMPDesign
D022168 P.S./I.S. 323 - BROOKLYN EXT. WORK
P.S./I.S. 323 - BROOKLYN 23ROOFS$4M OVER2024/05EXT. WORKDesign
P.S./I.S. 323 - BROOKLYN 23WINDOWS$4M OVER2024/05EXT. WORKDesign
P.S./I.S. 323 - BROOKLYN 23EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
P.S./I.S. 323 - BROOKLYN 23PAVED AREA- CONCRETE$4M OVER2024/05SITEDesign
P.S./I.S. 323 - BROOKLYN 23PARAPETS$4M OVER2024/05EXT. WORKDesign
D022174 PERFORMING ARTS AND TECH. HS - K EXT. WORK
PERFORMING ARTS AND TECH. HS - K 19ROOFS$4M OVER2024/05EXT. WORKDesign
PERFORMING ARTS AND TECH. HS - K 19WINDOWS$4M OVER2024/05EXT. WORKDesign
PERFORMING ARTS AND TECH. HS - K 19PARAPETS$4M OVER2024/05EXT. WORKDesign
PERFORMING ARTS AND TECH. HS - K 19FLOOD ELIMINATION$4M OVER2024/05EXT. WORKDesign
PERFORMING ARTS AND TECH. HS - K 19EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
PERFORMING ARTS AND TECH. HS - K 19ANSUL SYSTEMS$4M OVER2024/05SCHOOL SAFETYDesign
PERFORMING ARTS AND TECH. HS - K 19FIRE ALARM SYSTEM$4M OVER2024/05ELECTRICALDesign
D022045 R. CARSON SCL OF COASTAL ST-K ROOM CONVERSIONS/UPGRADES
R. CARSON SCL OF COASTAL ST-K 21RESO A ROOM CONVERSIONS / PARTITIONING$500K - $750K2024/03ROOM CONVERSIONS/UPGRADESDesign
D022272 R. CARSON SCL OF COASTAL ST-K ACCESSIBILITY
R. CARSON SCL OF COASTAL ST-K 21PATH OF TRAVEL RESO A ROOM CONVERSIONS/PARTITIONING$0 - $250K2024/02ACCESSIBILITYDesign
D022318 R. CARSON SCL OF COASTAL ST-K ELECTRICAL
R. CARSON SCL OF COASTAL ST-K 21RESO A IPDVS CAMERA INSTALLATION$0 - $250K2024/05ELECTRICALDesign
D021842 RIVERDALE AVENUE MIDDLE SCHOOL AUDITORIUM UPGRADES
RIVERDALE AVENUE MIDDLE SCHOOL 23RESO A AUDITORIUM UPGRADE$500K - $750K2024/01AUDITORIUM UPGRADESDesign
D021971 RIVERDALE AVENUE MIDDLE SCHOOL ACCESSIBILITY
RIVERDALE AVENUE MIDDLE SCHOOL 23PATH OF TRAVEL RESO A AUDITORIUM UPGRADE$0 - $250K2024/01ACCESSIBILITYDesign
D021754 THE URBAN ASSEMBLY SCHOOL FOR COLLABORATIVE HEALTHCARE ACCESSIBILITY
THE URBAN ASSEMBLY SCHOOL FOR COLLABORATIVE HEALTHCARE 19ACCESSIBLE RAMP$1M - $4M2024/02ACCESSIBILITYDesign
D020777 URBAN STRATEGIES DAY CARE CENTER SITE 1 LEASES
URBAN STRATEGIES DAY CARE CENTER SITE 1 19ACS EARLY LEARN LEASE IMPROVEMENT$500K - $750K2024/03LEASESDesign
D022175 URBAN STRATEGIES DAY CARE CENTER SITE 1 ACCESSIBILITY
URBAN STRATEGIES DAY CARE CENTER SITE 1 19PATH OF TRAVEL$0 - $250K2024/03ACCESSIBILITYDesign
D021555 WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN EXT. WORK
WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN 16PARAPETS$4M OVER2024/02EXT. WORKDesign
WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN 16EXTERIOR MASONRY$4M OVER2024/02EXT. WORKDesign
WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN 16WINDOWS$4M OVER2024/02EXT. WORKDesign
WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN 16PAVED AREAS- CONCRETE$4M OVER2024/02SITEDesign
D020890 WIILIAMSBURG PREP- BROOKLYN ELECTRICAL
WIILIAMSBURG PREP- BROOKLYN 14FIRE ALARM SYSTEM$1M - $4M2024/01ELECTRICALDesign
D022211 WILLIAM MAXWELL VOC HS - K WALK-IN REFRIGERATORS AND FREEZERS
WILLIAM MAXWELL VOC HS - K 19WALK-IN REFRIGERATORS AND FREEZERS$750K - $1M2024/04WALK-IN REFRIGERATORS AND FREEZERSDesign
MANHATTAN
D019803 BERGTRAUM HS - MANHATTAN ATHLETIC FIELDS
BERGTRAUM HS - MANHATTAN 02ATHLETIC FIELD UPGRADE$4M OVER2024/05ATHLETIC FIELDSDesign
D021209 CENTRAL PARK EAST HS - MANHATTAN PLAYGROUNDS
CENTRAL PARK EAST HS - MANHATTAN 04NON-IDA PLAYGROUND UPGRADE$4M OVER2024/02PLAYGROUNDSDesign
P.S. 497 - MANHATTAN 04IDA FLOOD ELIMINATION$4M OVER2024/02EXT. WORKDesign
P.S. 497 - MANHATTAN 04IDA ELECTRICAL UPGRADE$4M OVER2024/02ELECTRICALDesign
P.S. 497 - MANHATTAN 04IDA ROOFS$4M OVER2024/02EXT. WORKDesign
P.S. 497 - MANHATTAN 04IDA HEATING PLANT UPGRADE$4M OVER2024/02BOILER/HEAT PUMPDesign
P.S. 497 - MANHATTAN 04IDA INTERIOR SPACES$4M OVER2024/02INTERIORDesign
D021519 EAST SIDE COMMUNITY SCHOOL BUILDING SYSTEMS
EAST SIDE COMMUNITY SCHOOL 01VENTILATION$4M OVER2024/01BUILDING SYSTEMSDesign
EAST SIDE COMMUNITY SCHOOL 01FIRE ALARM SYSTEM REPLACEMENT$4M OVER2024/01ELECTRICALDesign
D022161 FIORELLO LAGUARDIA HS - MANHATTAN INTERIOR
FIORELLO LAGUARDIA HS - MANHATTAN 03STAIRWELL WALLS$1M - $4M2024/03INTERIORDesign
D021715 FREDERICK DOUGLAS ACADEMY - M EXT. WORK
FREDERICK DOUGLAS ACADEMY - M 05ROOF LEAK$4M OVER2024/01EXT. WORKDesign
FREDERICK DOUGLAS ACADEMY - M 05EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
FREDERICK DOUGLAS ACADEMY - M 05WINDOWS$4M OVER2024/01EXT. WORKDesign
D021880 HAMILTON GRANGE MIDDLE SCHOOL AUDITORIUM UPGRADES
HAMILTON GRANGE MIDDLE SCHOOL 06RESO A AUDITORIUM UPGRADE$250K - $500K2024/01AUDITORIUM UPGRADESDesign
D020701 I.S. 114 - MANHATTAN ROOM CONVERSIONS/UPGRADES
I.S. 114 - MANHATTAN 02RESO A- DANCE STUDIO$250K - $500K2024/01ROOM CONVERSIONS/UPGRADESDesign
D021641 I.S. 293 - MANHATTAN EXT. WORK
I.S. 293 - MANHATTAN 06FLOOD ELIMINATION$4M OVER2024/05EXT. WORKDesign
I.S. 293 - MANHATTAN 06EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
I.S. 293 - MANHATTAN 06PARAPETS$4M OVER2024/05EXT. WORKDesign
I.S. 293 - MANHATTAN 06ROOFS$4M OVER2024/05EXT. WORKDesign
D021718 I.S. 293 - MANHATTAN BOILER ELECTRIFICATION
I.S. 293 - MANHATTAN 06ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/06BOILER ELECTRIFICATIONScope
D021603 I.S. 328 - MANHATTAN EXT. WORK
I.S. 328 - MANHATTAN 06ROOFS$4M OVER2024/01EXT. WORKDesign
I.S. 328 - MANHATTAN 06PARAPETS$4M OVER2024/01EXT. WORKDesign
I.S. 328 - MANHATTAN 06EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
D021687 I.S. 328 - MANHATTAN SCIENCE LAB UPGRADES
I.S. 328 - MANHATTAN 06SCIENCE LAB UPGRADES$1M - $4M2024/02SCIENCE LAB UPGRADESDesign
D021900 I.S. 328 - MANHATTAN ACCESSIBILITY
I.S. 328 - MANHATTAN 06PATH OF TRAVEL SCIENCE LAB UPGRADE$0 - $250K2024/02ACCESSIBILITYDesign
D021636 I.S. 528 - MANHATTAN PLAYGROUNDS
I.S. 528 - MANHATTAN 06RESO A PLAYGROUND UPGRADE$500K - $750K2024/01PLAYGROUNDSDesign
D021600 I.S. 54 - MANHATTAN EXT. WORK
I.S. 54 - MANHATTAN 03ROOFS$4M OVER2024/06EXT. WORKDesign
I.S. 54 - MANHATTAN 03PARAPETS$4M OVER2024/06EXT. WORKDesign
I.S. 54 - MANHATTAN 03EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
I.S. 54 - MANHATTAN 03FLOOD ELIMINATION$4M OVER2024/06EXT. WORKDesign
I.S. 54 - MANHATTAN 03WINDOWS$4M OVER2024/06EXT. WORKDesign
D021956 I.S. 862 - MANHATTAN ACCESSIBILITY
I.S. 862 - MANHATTAN 03PATH OF TRAVEL RESO A GYMNASIUM UPGRADE$0 - $250K2024/03ACCESSIBILITYDesign
D021858 I.S. 896 - MANHATTAN LIBRARY UPGRADES
I.S. 896 - MANHATTAN 02RESO A LIBRARY UPGRADE$250K - $500K2024/02LIBRARY UPGRADESDesign
D021936 I.S. 896 - MANHATTAN ACCESSIBILITY
I.S. 896 - MANHATTAN 02PATH OF TRAVEL RESO A LIBRARY UPGRADE$0 - $250K2024/02ACCESSIBILITYDesign
D018801 J. K. ONASSIS HS FOR INT CAREERS-M EXT. WORK
J. K. ONASSIS HS FOR INT CAREERS-M 02FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
J. K. ONASSIS HS FOR INT CAREERS-M 02PARAPETS$4M OVER2024/01EXT. WORKDesign
J. K. ONASSIS HS FOR INT CAREERS-M 02EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
J. K. ONASSIS HS FOR INT CAREERS-M 02ROOFS$4M OVER2024/01EXT. WORKDesign
J. K. ONASSIS HS FOR INT CAREERS-M 02WINDOWS$4M OVER2024/01EXT. WORKDesign
D020709 J.H.S. 292 - MANHATTAN ELECTRICAL
J.H.S. 292 - MANHATTAN 01LOW-VOLTAGE ELECTRICAL SYSTEM$1M - $4M2024/01ELECTRICALDesign
D021760 J.H.S. 52 - MANHATTAN EXT. WORK
J.H.S. 52 - MANHATTAN 06EXTERIOR MASONRY$4M OVER2024/04EXT. WORKDesign
J.H.S. 52 - MANHATTAN 06ROOFS$4M OVER2024/04EXT. WORKDesign
J.H.S. 52 - MANHATTAN 06WINDOWS$4M OVER2024/04EXT. WORKDesign
J.H.S. 52 - MANHATTAN 06PARAPETS$4M OVER2024/04EXT. WORKDesign
J.H.S. 52 - MANHATTAN 06FLOOD ELIMINATION$4M OVER2024/04EXT. WORKDesign
D022089 M811 SPED - MANHATTAN EXT. WORK
M811 SPED - MANHATTAN 03ROOFS$4M OVER2024/05EXT. WORKDesign
M811 SPED - MANHATTAN 03WINDOWS$4M OVER2024/05EXT. WORKDesign
M811 SPED - MANHATTAN 03EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
M811 SPED - MANHATTAN 03PARAPETS$4M OVER2024/05EXT. WORKDesign
D017131 MURRAY HILL ACADEMY HS - M EXT. WORK
MURRAY HILL ACADEMY HS - M 02EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
MURRAY HILL ACADEMY HS - M 02FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
MURRAY HILL ACADEMY HS - M 02ROOFS$4M OVER2024/01EXT. WORKDesign
MURRAY HILL ACADEMY HS - M 02PARAPETS$4M OVER2024/01EXT. WORKDesign
MURRAY HILL ACADEMY HS - M 02WINDOWS$4M OVER2024/01EXT. WORKDesign
D019271 NEW YORK HARBOR SCHOOL - MANHATTAN BUILDING SYSTEMS
NEW YORK HARBOR SCHOOL - MANHATTAN 02STRUCTURAL ISSUES$750K - $1M2024/01BUILDING SYSTEMSDesign
D022024 NEW YORK HARBOR SCHOOL - MANHATTAN ELECTRICAL
NEW YORK HARBOR SCHOOL - MANHATTAN 02IPDVS UPGRADE- EXISTING BUILDING$0 - $250K2024/01ELECTRICALDesign
D021643 NYC LAB MIDDLE SCHOOL - MANHATTAN GYMNASIUM
NYC LAB MIDDLE SCHOOL - MANHATTAN 02RESO A LOCKER ROOM UPGRADE$1M - $4M2024/06GYMNASIUMScope
D022213 P.S. 108 - MANHATTAN WALK-IN REFRIGERATORS AND FREEZERS
P.S. 108 - MANHATTAN 04WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D020990 P.S. 110 - MANHATTAN EXT. WORK
P.S. 110 - MANHATTAN 01FACADE REMEDIATION @M110$4M OVER2024/01EXT. WORKDesign
P.S. 110 - MANHATTAN 01PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 110 - MANHATTAN 01ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 110 - MANHATTAN 01FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
P026404 P.S. 111 - MANHATTAN ELECTRICAL
P.S. 111 - MANHATTAN 02IPDVS CAMERA INSTALLATION$500K - $750K2024/01ELECTRICALDesign
P.S. 19 - MANHATTAN 01IPDVS CAMERA INSTALLATION$500K - $750K2024/01ELECTRICALDesign
P.S. 89 - MANHATTAN 02IPDVS CAMERA INSTALLATION$500K - $750K2024/01ELECTRICALDesign
D020321 P.S. 115 - MANHATTAN EXT. WORK
P.S. 115 - MANHATTAN 06FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
P.S. 115 - MANHATTAN 06PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 115 - MANHATTAN 06EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
P.S. 115 - MANHATTAN 06WINDOWS$4M OVER2024/01EXT. WORKDesign
P.S. 115 - MANHATTAN 06ELECTRICAL UPGRADE$4M OVER2024/01ELECTRICALDesign
D021307 P.S. 116 - MANHATTAN PLAYGROUNDS
P.S. 116 - MANHATTAN 02RESO A PLAYGROUND UPGRADE$500K - $750K2024/05PLAYGROUNDSDesign
D022088 P.S. 123 - MANHATTAN EXT. WORK
P.S. 123 - MANHATTAN 05WINDOWS$4M OVER2024/06EXT. WORKDesign
P.S. 123 - MANHATTAN 05EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
D021183 P.S. 124 - MANHATTAN PLAYGROUNDS
P.S. 124 - MANHATTAN 02RESO A PLAYGROUND UPGRADE$500K - $750K2024/01PLAYGROUNDSDesign
D021903 P.S. 125 - MANHATTAN ROOM CONVERSIONS/UPGRADES
P.S. 125 - MANHATTAN 05RESO A CAFETERIA UPGRADE$250K - $500K2024/02ROOM CONVERSIONS/UPGRADESDesign
D021904 P.S. 125 - MANHATTAN MISCELLANEOUS
P.S. 125 - MANHATTAN 05RESO A POOL UPGRADE$4M OVER2024/04MISCELLANEOUSDesign
D021972 P.S. 125 - MANHATTAN ACCESSIBILITY
P.S. 125 - MANHATTAN 05PATH OF TRAVEL RESO A POOL UPGRADE$0 - $250K2024/02ACCESSIBILITYDesign
D022263 P.S. 128 - MANHATTAN ELECTRICAL
P.S. 128 - MANHATTAN 06RESO A IPDVS CAMERA INSTALLATION$0 - $250K2024/04ELECTRICALDesign
D022124 P.S. 133 - MANHATTAN ELECTRICAL
P.S. 133 - MANHATTAN 05IPDVS CAMERA INSTALLATION$0 - $250K2024/01ELECTRICALDesign
D021572 P.S. 146 - MANHATTAN EXT. WORK
P.S. 146 - MANHATTAN 04ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 146 - MANHATTAN 04EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
P.S. 146 - MANHATTAN 04FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
D021526 P.S. 152 - MANHATTAN EXT. WORK
P.S. 152 - MANHATTAN 06ROOFS$4M OVER2024/06EXT. WORKDesign
P.S. 152 - MANHATTAN 06PARAPETS$4M OVER2024/06EXT. WORKDesign
P.S. 152 - MANHATTAN 06WINDOWS$4M OVER2024/06EXT. WORKDesign
P.S. 152 - MANHATTAN 06EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
P.S. 152 - MANHATTAN 06EMERGENCY GENERATOR$4M OVER2024/06ELECTRICALDesign
P.S. 152 - MANHATTAN 06FLOOD ELIMINATION$4M OVER2024/06EXT. WORKDesign
D022214 P.S. 152 - MANHATTAN WALK-IN REFRIGERATORS AND FREEZERS
P.S. 152 - MANHATTAN 06WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D022324 P.S. 152 - MANHATTAN ELECTRICAL
P.S. 152 - MANHATTAN 06RESO A IPDVS CAMERA INSTALLATION$0 - $250K2024/05ELECTRICALDesign
D021647 P.S. 154 - MANHATTAN ELECTRICAL
P.S. 154 - MANHATTAN 05FIRE ALARM SYSTEM REPLACEMENT$750K - $1M2024/01ELECTRICALDesign
D021722 P.S. 155 - MANHATTAN BOILER ELECTRIFICATION
P.S. 155 - MANHATTAN 04ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/06BOILER ELECTRIFICATIONDesign
P.S. 155 - MANHATTAN 04WINDOWS$4M OVER2024/06EXT. WORKDesign
P.S. 155 - MANHATTAN 04ROOFS$4M OVER2024/06EXT. WORKDesign
P.S. 155 - MANHATTAN 04ELECTRICAL UPGRADE$4M OVER2024/06ELECTRICALDesign
D020677 P.S. 165 - MANHATTAN AUDITORIUM UPGRADES
P.S. 165 - MANHATTAN 03RESO A AUDITORIUM UPGRADE$1M - $4M2024/04AUDITORIUM UPGRADESDesign
D021835 P.S. 165 - MANHATTAN GYMNASIUM
P.S. 165 - MANHATTAN 03RESO A GYMNASIUM UPGRADE$750K - $1M2024/03GYMNASIUMDesign
D021974 P.S. 187 - MANHATTAN ACCESSIBILITY
P.S. 187 - MANHATTAN 06PATH OF TRAVEL RESO A PLAYGROUND UPGRADE$0 - $250K2024/01ACCESSIBILITYDesign
D021741 P.S. 192 - MANHATTAN SITE
P.S. 192 - MANHATTAN 06OTHER TEMP STRUCTURE REMOVAL/PAVED AREA-CONCRETE$1M - $4M2024/02SITEDesign
P026133 P.S. 192 - MANHATTAN SITE
P.S. 192 - MANHATTAN 06PAVED AREAS - CONCRETE$1M - $4M2024/01SITEDesign
P.S. 192 - MANHATTAN 06EXTERIOR STAIRS$1M - $4M2024/01EXT. WORKDesign
P026378 P.S. 199 - MANHATTAN ELECTRICAL
P.S. 199 - MANHATTAN 03IPDVS CAMERA INSTALLATION$500K - $750K2024/01ELECTRICALDesign
P.S. 75 - MANHATTAN 03IPDVS CAMERA INSTALLATION$500K - $750K2024/01ELECTRICALDesign
D020374 P.S. 210 - MANHATTAN EXT. WORK
P.S. 210 - MANHATTAN 06ROOFS$1M - $4M2024/01EXT. WORKDesign
D021796 P.S. 225 - MANHATTAN GYMNASIUM
P.S. 225 - MANHATTAN 02RESO A LOCKER ROOM UPGRADE$1M - $4M2024/01GYMNASIUMDesign
D021953 P.S. 225 - MANHATTAN ACCESSIBILITY
P.S. 225 - MANHATTAN 02PATH OF TRAVEL RESO A LOCKER ROOM UPGRADE$0 - $250K2024/01ACCESSIBILITYDesign
D022010 P.S. 28 - MANHATTAN EXT. WORK
P.S. 28 - MANHATTAN 06WATER INFILTRATION INTO ELECTRCIAL EQUIPMENT$1M - $4M2024/01EXT. WORKDesign
P.S. 28 - MANHATTAN 06FIRE ALARM SYSTEM REPLACEMENT$1M - $4M2024/01ELECTRICALDesign
D021655 P.S. 290 - MANHATTAN EXT. WORK
P.S. 290 - MANHATTAN 02RESO A ROOFTOP PLAYGROUND$4M OVER2024/01EXT. WORKDesign
D022017 P.S. 30 - MANHATTAN BOILER ELECTRIFICATION
P.S. 30 - MANHATTAN 05ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/06BOILER ELECTRIFICATIONDesign
P.S. 30 - MANHATTAN 05ELECTRICAL SERVICE UPGRADE$4M OVER2024/06ELECTRICALDesign
D022215 P.S. 311 - MANHATTAN WALK-IN REFRIGERATORS AND FREEZERS
P.S. 311 - MANHATTAN 06WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D019558 P.S. 333 - MANHATTAN ELECTRICAL
P.S. 333 - MANHATTAN 03RPZ BACKFLOW PREVENTION DEVICES$500K - $750K2024/01ELECTRICALDesign
D022224 P.S. 333 - MANHATTAN WALK-IN REFRIGERATORS AND FREEZERS
P.S. 333 - MANHATTAN 03WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2024/05WALK-IN REFRIGERATORS AND FREEZERSDesign
D021766 P.S. 37 - MANHATTAN SITE
P.S. 37 - MANHATTAN 04SIDEWALK REPAIR$1M - $4M2024/01SITEDesign
D022285 P.S. 37 - MANHATTAN EXT. WORK
P.S. 37 - MANHATTAN 04ROOFS$4M OVER2024/05EXT. WORKDesign
P.S. 37 - MANHATTAN 04EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
P.S. 37 - MANHATTAN 04PARAPETS$4M OVER2024/05EXT. WORKDesign
D022077 P.S. 38 - MANHATTAN EXT. WORK
P.S. 38 - MANHATTAN 04ROOFS$4M OVER2024/05EXT. WORKDesign
P.S. 38 - MANHATTAN 04EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
P.S. 38 - MANHATTAN 04PARAPETS$4M OVER2024/05EXT. WORKDesign
P.S. 38 - MANHATTAN 04FLOOD ELIMINATION$4M OVER2024/05EXT. WORKDesign
D022068 P.S. 452 - MANHATTAN GYMNASIUM
P.S. 452 - MANHATTAN 03GYM CEILING RESTORATION- PERMANENT FIX$500K - $750K2024/01GYMNASIUMDesign
D022022 P.S. 46 - MANHATTAN PLAYGROUNDS
P.S. 46 - MANHATTAN 05OTHER TEMP STRUCTURE REMOVAL/PAVED AREA-CONCRETE$1M - $4M2024/02PLAYGROUNDSDesign
D017528 P.S. 48 - MANHATTAN ADMIN/CODE COMP
P.S. 48 - MANHATTAN 06CERTIFICATE OF OCCUPANCY$1M - $4M2024/01ADMIN/CODE COMPDesign
D021097 P.S. 48 - MANHATTAN ELECTRICAL
P.S. 48 - MANHATTAN 06FIRE ALARM$4M OVER2024/05ELECTRICALDesign
P.S. 48 - MANHATTAN 06ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/05BOILER ELECTRIFICATIONDesign
P.S. 48 - MANHATTAN 06WINDOWS$4M OVER2024/05EXT. WORKDesign
P.S. 48 - MANHATTAN 06ELECTRICAL SERVICE UPGRADE$4M OVER2024/05ELECTRICALDesign
D021750 P.S. 497 - MANHATTAN ACCESSIBILITY
P.S. 497 - MANHATTAN 04PATH OF TRAVEL IDA FLOOD ELIMINATION$250K - $500K2024/02ACCESSIBILITYDesign
D019951 P.S. 64 - MANHATTAN PLAYGROUNDS
P.S. 64 - MANHATTAN 01RESO A PLAYGROUND UPGRADE$1M - $4M2024/01PLAYGROUNDSDesign
D020191 P.S. 64 - MANHATTAN ACCESSIBILITY
P.S. 64 - MANHATTAN 01RESO A PATH OF TRAVEL PLAYGROUND UPGRADE$0 - $250K2024/01ACCESSIBILITYDesign
D022235 P.S. 72 - MANHATTAN EXT. WORK
P.S. 72 - MANHATTAN 04ROOF REPLACEMENT$1M - $4M2024/04EXT. WORKDesign
P.S. 72 - MANHATTAN 04EXTERIOR MASONRY$1M - $4M2024/04EXT. WORKDesign
D022319 P.S. 77 - MANHATTAN ELECTRICAL
P.S. 77 - MANHATTAN 02RESO A IPDVS CAMERA INSTALLATION$250K - $500K2024/05ELECTRICALDesign
D022260 P.S. 83 - MANHATTAN EXT. WORK
P.S. 83 - MANHATTAN 04ROOFS$4M OVER2024/05EXT. WORKDesign
P.S. 83 - MANHATTAN 04WINDOWS$4M OVER2024/05EXT. WORKDesign
P.S. 83 - MANHATTAN 04PARAPETS$4M OVER2024/05EXT. WORKDesign
P.S. 83 - MANHATTAN 04EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
D021751 P.S. 98 - MANHATTAN PLAYGROUNDS
P.S. 98 - MANHATTAN 06OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT:$1M - $4M2024/02PLAYGROUNDSDesign
D022054 P.S. 98 - MANHATTAN ACCESSIBILITY
P.S. 98 - MANHATTAN 06PATH OF TRAVEL-OTHER TEMP STRUCTURE REMOVAL$0 - $250K2024/02ACCESSIBILITYDesign
D021210 P.S./I.S. 276 - MANHATTAN INTERIOR
P.S./I.S. 276 - MANHATTAN 02IDA INTERIOR SPACES$750K - $1M2024/02INTERIORDesign
P.S./I.S. 276 - MANHATTAN 02IDA FLOOD ELIMINATION$750K - $1M2024/02EXT. WORKDesign
D021737 SCHOOL FOR COOPERATIVE TECHNICAL EDUCATION EXT. WORK
SCHOOL FOR COOPERATIVE TECHNICAL EDUCATION 04EXTERIOR MASONRY- PERMANENT FIX$4M OVER2024/05EXT. WORKDesign
SCHOOL FOR COOPERATIVE TECHNICAL EDUCATION 04PARAPETS$4M OVER2024/05EXT. WORKDesign
D020325 SCHOOL OF THE FUTURE - MANHATTAN EXT. WORK
SCHOOL OF THE FUTURE - MANHATTAN 02FLOOD ELIMINATION$1M - $4M2024/01EXT. WORKDesign
SCHOOL OF THE FUTURE - MANHATTAN 02WINDOWS$1M - $4M2024/01EXT. WORKDesign
SCHOOL OF THE FUTURE - MANHATTAN 02EXTERIOR MASONRY$1M - $4M2024/01EXT. WORKDesign
D020784 U.F.B.C.O. LEASES
U.F.B.C.O. 06ACS EARLY LEARN LEASE IMPROVEMENT$0 - $250K2024/06LEASESDesign
D021745 WADLEIGH SECONDARY SCHOOL FOR THE PERFORMING & VISUAL ARTS EXT. WORK
WADLEIGH SECONDARY SCHOOL FOR THE PERFORMING & VISUAL ARTS 03FLOOD ELIMINATION$1M - $4M2024/02EXT. WORKDesign
D022196 WADLEIGH SECONDARY SCHOOL FOR THE PERFORMING & VISUAL ARTS EXT. WORK
WADLEIGH SECONDARY SCHOOL FOR THE PERFORMING & VISUAL ARTS 03ROOFS$4M OVER2024/04EXT. WORKDesign
WADLEIGH SECONDARY SCHOOL FOR THE PERFORMING & VISUAL ARTS 03EXTERIOR MASONRY$4M OVER2024/04EXT. WORKDesign
D022065 YOUNG WOMEN'S LEADERSHIP SCHOOL ELECTRICAL
YOUNG WOMEN'S LEADERSHIP SCHOOL 04IPDVS CAMERA INSTALLATION$0 - $250K2024/01ELECTRICALDesign
QUEENS
D021830 ACAD. OF MEDICAL TECHNOLOGY - Q ELECTRICAL
ACAD. OF MEDICAL TECHNOLOGY - Q 27RESO A ELECTRICAL UPGRADE$250K - $500K2024/04ELECTRICALDesign
D021205 AVIATION HS - QUEENS EXT. WORK
AVIATION HS - QUEENS 24IDA FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
AVIATION HS - QUEENS 24IDA HEATING PLANT UPGRADE$4M OVER2024/01BOILER/HEAT PUMPDesign
AVIATION HS - QUEENS 24NON-IDA CLIMATE CONTROL$4M OVER2024/01BOILER/HEAT PUMPDesign
AVIATION HS - QUEENS 24IDA INTERIOR SPACES$4M OVER2024/01INTERIORDesign
D020024 BAYSIDE HIGH SCHOOL - QUEENS SCIENCE LAB UPGRADES
BAYSIDE HIGH SCHOOL - QUEENS 26RESO A GREENHOUSE$1M - $4M2024/04SCIENCE LAB UPGRADESDesign
D018886 BENJAMIN N. CARDOZO HS - QUEENS ELECTRICAL
BENJAMIN N. CARDOZO HS - QUEENS 26RPZ VALVES$500K - $750K2024/01ELECTRICALDesign
D022305 BENJAMIN N. CARDOZO HS - QUEENS PLAYGROUNDS
BENJAMIN N. CARDOZO HS - QUEENS 26TCU REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/06PLAYGROUNDSScope
D022269 BETTER CCOMMUNITY LIFE DAY CARE CENTER SITE LEASES
BETTER CCOMMUNITY LIFE DAY CARE CENTER SITE 24ACS EARLY LEARN-LEASE RENOVATION$0 - $250K2024/07LEASESScope
D021630 BUSINESS TECHNOLOGY EARLY COLLEGE HIGH SCHOOL ELECTRICAL
BUSINESS TECHNOLOGY EARLY COLLEGE HIGH SCHOOL 26LOW VOLTAGE ELECTRICAL SYSTEMS$4M OVER2024/02ELECTRICALDesign
MARTIN VAN BUREN HS - QUEENS 26FULL PROGRAM ACCESSIBILITY$4M OVER2024/02ACCESSIBILITYDesign
D019326 CHANNEL VIEW SCL FOR RESEARCH - Q SITE
CHANNEL VIEW SCL FOR RESEARCH - Q 27SEA WALL / BULKHEAD REPAIR$4M OVER2024/05SITEDesign
D020200 CHANNEL VIEW SCL FOR RESEARCH - Q GYMNASIUM
CHANNEL VIEW SCL FOR RESEARCH - Q 27RESO A WEIGHT ROOM$1M - $4M2024/02GYMNASIUMDesign
D021309 COLLEGE POINT COLLABORATIVE - QUEENS PLAYGROUNDS
COLLEGE POINT COLLABORATIVE - QUEENS 25RESO A PLAYGROUND UPGRADE$250K - $500K2024/01PLAYGROUNDSDesign
D022169 COLLEGE POINT COLLABORATIVE - QUEENS SCHOOL SAFETY
COLLEGE POINT COLLABORATIVE - QUEENS 25RESO A EXTERIOR DOOR$0 - $250K2024/03SCHOOL SAFETYDesign
D021658 DISTRICT 25 PRE-K CENTER ELECTRICAL
DISTRICT 25 PRE-K CENTER 25FIRE ALARM SYSTEM REPLACEMENT$1M - $4M2024/01ELECTRICALDesign
D022316 EAGLE ACADEMY III - QUEENS ELECTRICAL
EAGLE ACADEMY III - QUEENS 29RESO A ELECTRICAL UPGRADE$0 - $250K2024/06ELECTRICALScope
D021794 FLUSHING HS - QUEENS ATHLETIC FIELDS
FLUSHING HS - QUEENS 25RESO A ATHLETIC FIELD UPGRADE$4M OVER2024/03ATHLETIC FIELDSDesign
D021810 FLUSHING HS - QUEENS GYMNASIUM
FLUSHING HS - QUEENS 25RESO A GYMNASIUM UPGRADE$500K - $750K2024/03GYMNASIUMDesign
D021984 FLUSHING HS - QUEENS ACCESSIBILITY
FLUSHING HS - QUEENS 25PATH OF TRAVEL RESO A GYMNASIUM UPGRADE$0 - $250K2024/03ACCESSIBILITYDesign
D021673 FOREST HILLS HS - QUEENS EXT. WORK
FOREST HILLS HS - QUEENS 28SLATE ROOF TILES - SCOPE ONLY$4M OVER2024/04EXT. WORKDesign
D021872 FOREST HILLS HS - QUEENS AUDITORIUM UPGRADES
FOREST HILLS HS - QUEENS 28RESO A AUDITORIUM UPGRADE$1M - $4M2024/03AUDITORIUM UPGRADESDesign
D021266 FRANCIS LEWIS HS - QUEENS EXT. WORK
FRANCIS LEWIS HS - QUEENS 26IDA FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
FRANCIS LEWIS HS - QUEENS 26NON-IDA REINFORCE SUPPORT ELEMENTS$4M OVER2024/01BUILDING SYSTEMSDesign
FRANCIS LEWIS HS - QUEENS 26IDA HEATING PLANT UPGRADE$4M OVER2024/01BOILER/HEAT PUMPDesign
FRANCIS LEWIS HS - QUEENS 26IDA INTERIOR SPACES$4M OVER2024/01INTERIORDesign
D019994 HS FOR ARTS AND BUSINESS - QUEENS EXT. WORK
HS FOR ARTS AND BUSINESS - QUEENS 24FLOOD ELIMINATION$4M OVER2024/03EXT. WORKDesign
D021241 I.S. 109 - QUEENS ELECTRICAL
I.S. 109 - QUEENS 29LOW VOLTAGE ELECTRICAL SYSTEM$1M - $4M2024/01ELECTRICALDesign
D021838 I.S. 119 - QUEENS ROOM CONVERSIONS/UPGRADES
I.S. 119 - QUEENS 24RESO A COMPUTER LAB UPGRADE$250K - $500K2024/03ROOM CONVERSIONS/UPGRADESDesign
D021748 I.S. 125 - QUEENS EXT. WORK
I.S. 125 - QUEENS 24FLOOD ELIMINATION$1M - $4M2024/04EXT. WORKDesign
D021837 I.S. 126 - QUEENS SCIENCE LAB UPGRADES
I.S. 126 - QUEENS 30RESO A SCIENCE LAB$500K - $750K2024/04SCIENCE LAB UPGRADESDesign
D021933 I.S. 126 - QUEENS ACCESSIBILITY
I.S. 126 - QUEENS 30PATH OF TRAVEL RESO A SCIENCE LAB$0 - $250K2024/03ACCESSIBILITYDesign
D022193 I.S. 145 - QUEENS EXT. WORK
I.S. 145 - QUEENS 30ROOFS$4M OVER2024/06EXT. WORKDesign
I.S. 145 - QUEENS 30FLOOD ELIMINATION$4M OVER2024/06EXT. WORKDesign
I.S. 145 - QUEENS 30PARAPETS$4M OVER2024/06EXT. WORKDesign
I.S. 145 - QUEENS 30EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
D020332 I.S. 202 - QUEENS EXT. WORK
I.S. 202 - QUEENS 27FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
I.S. 202 - QUEENS 27PARAPETS$4M OVER2024/01EXT. WORKDesign
I.S. 202 - QUEENS 27ROOFS$4M OVER2024/01EXT. WORKDesign
I.S. 202 - QUEENS 27EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
I.S. 202 - QUEENS 27SIDEWALK REPAIR$4M OVER2024/01SITEDesign
I.S. 202 - QUEENS 27WINDOWS$4M OVER2024/01EXT. WORKDesign
D022229 I.S. 202 - QUEENS WALK-IN REFRIGERATORS AND FREEZERS
I.S. 202 - QUEENS 27WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D021008 I.S. 226 - QUEENS BUILDING SYSTEMS
I.S. 226 - QUEENS 27RTU REPLACEMENT$1M - $4M2024/01BUILDING SYSTEMSDesign
I.S. 226 - QUEENS 27ROOFS$1M - $4M2024/01EXT. WORKDesign
D020730 I.S. 294 - QUEENS AUDITORIUM UPGRADES
I.S. 294 - QUEENS 25RESO A AUDITORIUM UPGRADE$250K - $500K2024/01AUDITORIUM UPGRADESDesign
D021616 I.S. 318 - QUEENS EXT. WORK
I.S. 318 - QUEENS 27WINDOWS$4M OVER2024/05EXT. WORKDesign
P.S. 317 - QUEENS 27ROOFS$4M OVER2024/05EXT. WORKDesign
P.S. 317 - QUEENS 27PARAPETS$4M OVER2024/05EXT. WORKDesign
P.S. 317 - QUEENS 27EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
D021885 I.S. 5 - QUEENS PLAYGROUNDS
I.S. 5 - QUEENS 24RESO A PLAYGROUND UPGRADE$250K - $500K2024/01PLAYGROUNDSDesign
D022226 I.S. 53 - QUEENS WALK-IN REFRIGERATORS AND FREEZERS
I.S. 53 - QUEENS 27WALK-IN REFRIGERTAORS AND FREEZERS$500K - $750K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D021605 I.S. 59 - QUEENS EXT. WORK
I.S. 59 - QUEENS 29ROOFS$4M OVER2024/01EXT. WORKDesign
I.S. 59 - QUEENS 29PARAPETS$4M OVER2024/01EXT. WORKDesign
I.S. 59 - QUEENS 29EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
D019634 I.S. 73 - QUEENS ELECTRICAL
I.S. 73 - QUEENS 24SMOKE PURGE SYSTEM$750K - $1M2024/01ELECTRICALDesign
D021041 I.S. 74 - QUEENS EXT. WORK
I.S. 74 - QUEENS 26IDA FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
I.S. 74 - QUEENS 26IDA INTERIOR SPACES$4M OVER2024/01INTERIORDesign
I.S. 74 - QUEENS 26IDA DOMESTIC PIPING$4M OVER2024/01ELECTRICALDesign
I.S. 74 - QUEENS 26IDA ELECTRICAL SYSTEMS$4M OVER2024/01ELECTRICALDesign
I.S. 74 - QUEENS 26IDA CLIMATE CONTROL$4M OVER2024/01BOILER/HEAT PUMPDesign
D022283 J.H.S. 158 - QUEENS ELECTRICAL
J.H.S. 158 - QUEENS 26RESO A IPDVS CAMERA INSTALLATION$0 - $250K2024/05ELECTRICALDesign
D022025 J.H.S. 190 - QUEENS PLAYGROUNDS
J.H.S. 190 - QUEENS 28RESO A SCHOOLYARD UPGRADE$750K - $1M2024/02PLAYGROUNDSDesign
D022148 J.H.S. 25 - QUEENS EXT. WORK
J.H.S. 25 - QUEENS 25ROOFS$1M - $4M2024/04EXT. WORKDesign
J.H.S. 25 - QUEENS 25EXTERIOR MASONRY$1M - $4M2024/04EXT. WORKDesign
J.H.S. 25 - QUEENS 25PARAPETS$1M - $4M2024/04EXT. WORKDesign
D021606 J.H.S. 67 - QUEENS EXT. WORK
J.H.S. 67 - QUEENS 26ROOFS$4M OVER2024/01EXT. WORKDesign
J.H.S. 67 - QUEENS 26PARAPETS$4M OVER2024/01EXT. WORKDesign
J.H.S. 67 - QUEENS 26EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
D022197 J.H.S. 8 - QUEENS EXT. WORK
J.H.S. 8 - QUEENS 28ROOFS$4M OVER2024/06EXT. WORKDesign
P026304 JAMAICA GATEWAY TO THE SCIENCES - Q SCIENCE LAB UPGRADES
JAMAICA GATEWAY TO THE SCIENCES - Q 28SCIENCE LAB UPGRADE$1M - $4M2024/01SCIENCE LAB UPGRADESDesign
QUEENS COLLEGIATE SCHOOL - QUEENS 28SCIENCE DEMO ROOM UPGRADES$1M - $4M2024/01SCIENCE LAB UPGRADESDesign
D021043 JOHN BOWNE HS - QUEENS EXT. WORK
JOHN BOWNE HS - QUEENS 25IDA FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
JOHN BOWNE HS - QUEENS 25IDA INTERIOR SPACES$4M OVER2024/01INTERIORDesign
D021471 JOHN BOWNE HS - QUEENS ACCESSIBILITY
JOHN BOWNE HS - QUEENS 25PATH OF TRAVEL IDA GYM FLOOR REPLACEMENT$0 - $250K2024/01ACCESSIBILITYDesign
D022256 JOHN BOWNE HS - QUEENS ACCESSIBILITY
JOHN BOWNE HS - QUEENS 25PATH OF TRAVEL IDA INTERIOR SPACES$0 - $250K2024/01ACCESSIBILITYDesign
D022273 JOHN BOWNE HS - QUEENS ELECTRICAL
JOHN BOWNE HS - QUEENS 25RPZ BACKFLOW PREVENTION DEVICES$1M - $4M2024/03ELECTRICALDesign
D022278 JOHN BOWNE HS - QUEENS PLAYGROUNDS
JOHN BOWNE HS - QUEENS 25RESO A FARM BUILDING$1M - $4M2024/07PLAYGROUNDSScope
D022314 LONG ISLAND CITY H.S. ELECTRICAL
LONG ISLAND CITY H.S. 30RESO A ELECTRICAL UPGRADE$500K - $750K2024/06ELECTRICALScope
D022080 LONG ISLAND CITY HS - Q ELECTRICAL
LONG ISLAND CITY HS - Q 30PUBLIC ADDRESS SYSTEM REPLACEMENT$1M - $4M2024/02ELECTRICALDesign
D020346 M.S. 282 - QUEENS MISCELLANEOUS
M.S. 282 - QUEENS 27SWIMMING POOL$4M OVER2024/02MISCELLANEOUSDesign
D021063 M.S. 282 - QUEENS ACCESSIBILITY
M.S. 282 - QUEENS 27PATH OF TRAVEL SWIMMING POOL$0 - $250K2024/03ACCESSIBILITYScope
D022351 M.S. 282 - QUEENS ELECTRICAL
M.S. 282 - QUEENS 27LOW VOLTAGE ELECTRICAL SYSTEMS$4M OVER2024/06ELECTRICALScope
D022167 P.S. 100 - QUEENS EXT. WORK
P.S. 100 - QUEENS 27ROOFS$4M OVER2024/06EXT. WORKDesign
P.S. 100 - QUEENS 27EMERGENCY GENERATOR$4M OVER2024/06ELECTRICALDesign
P.S. 100 - QUEENS 27EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
P.S. 100 - QUEENS 27WINDOWS$4M OVER2024/06EXT. WORKDesign
P.S. 100 - QUEENS 27PARAPETS$4M OVER2024/06EXT. WORKDesign
D021574 P.S. 105 - QUEENS EXT. WORK
P.S. 105 - QUEENS 27ROOFS$1M - $4M2024/05EXT. WORKDesign
P.S. 105 - QUEENS 27PARAPETS$1M - $4M2024/05EXT. WORKDesign
P.S. 105 - QUEENS 27EXTERIOR MASONRY$1M - $4M2024/05EXT. WORKDesign
D021677 P.S. 110 - QUEENS ELECTRICAL
P.S. 110 - QUEENS 24RESO A IPDVS CAMERA INSTALLATION$0 - $250K2024/02ELECTRICALDesign
D021607 P.S. 113 - QUEENS EXT. WORK
P.S. 113 - QUEENS 24EXTERIOR MASONRY$1M - $4M2024/04EXT. WORKDesign
P.S. 113 - QUEENS 24ROOFS$1M - $4M2024/04EXT. WORKDesign
D021713 P.S. 116 - QUEENS MISCELLANEOUS
P.S. 116 - QUEENS 29EXISTING BUILDING-INTERIOR RENOVATION/PROGRAM ACCESSIBILITY$4M OVER2024/03MISCELLANEOUSDesign
D022421 P.S. 118 - QUEENS PLAYGROUNDS
P.S. 118 - QUEENS 29RESO A PLAYGROUND UPGRADE$750K - $1M2024/07PLAYGROUNDSScope
D021608 P.S. 122 - QUEENS EXT. WORK
P.S. 122 - QUEENS 30ROOFS$4M OVER2024/02EXT. WORKDesign
P.S. 122 - QUEENS 30PARAPETS$4M OVER2024/02EXT. WORKDesign
P.S. 122 - QUEENS 30EXTERIOR MASONRY$4M OVER2024/02EXT. WORKDesign
P.S. 122 - QUEENS 30FLOOD ELIMINATION$4M OVER2024/02EXT. WORKDesign
D022406 P.S. 128 - QUEENS PLAYGROUNDS
P.S. 128 - QUEENS 24RESO A PLAYGROUND UPGRADE$1M - $4M2024/07PLAYGROUNDSScope
D018395 P.S. 131 - QUEENS MISCELLANEOUS
P.S. 131 - QUEENS 29PHASE 4 EXISTING BUILDING WORK$500K - $750K2024/02MISCELLANEOUSDesign
D019982 P.S. 131 - QUEENS EXT. WORK
P.S. 131 - QUEENS 29WINDOWS$4M OVER2024/01EXT. WORKDesign
P.S. 131 - QUEENS 29EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
P.S. 131 - QUEENS 29FLOOD ELIMINATION$4M OVER2024/01EXT. WORKDesign
D021917 P.S. 131 - QUEENS SITE
P.S. 131 - QUEENS 29DRAINAGE$1M - $4M2024/02SITEDesign
D022202 P.S. 133 - QUEENS EXT. WORK
P.S. 133 - QUEENS 26ROOFS$4M OVER2024/05EXT. WORKDesign
P.S. 133 - QUEENS 26FLOOD ELIMINATION$4M OVER2024/05EXT. WORKDesign
P.S. 133 - QUEENS 26EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
P.S. 133 - QUEENS 26PARAPETS$4M OVER2024/05EXT. WORKDesign
D021874 P.S. 14 - QUEENS ROOM CONVERSIONS/UPGRADES
P.S. 14 - QUEENS 24RESO A ROOM CONVERSION$0 - $250K2024/02ROOM CONVERSIONS/UPGRADESDesign
P026403 P.S. 147 - QUEENS EXT. WORK
P.S. 147 - QUEENS 29ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 147 - QUEENS 29PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 147 - QUEENS 29EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
Q811 SPED - QUEENS 29ROOF REPLACEMENT$4M OVER2024/01EXT. WORKDesign
D021446 P.S. 149 - QUEENS EXT. WORK
P.S. 149 - QUEENS 30EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
P.S. 149 - QUEENS 30PARAPETS$4M OVER2024/05EXT. WORKDesign
P.S. 149 - QUEENS 30ROOFS$4M OVER2024/05EXT. WORKDesign
P.S. 149 - QUEENS 30WINDOWS$4M OVER2024/05EXT. WORKDesign
P.S. 149 - QUEENS 30PAVED AREAS- CONCRETE$4M OVER2024/05SITEDesign
P.S. 149 - QUEENS 30FLOOD ELIMINATION$4M OVER2024/05EXT. WORKDesign
D021840 P.S. 150 - QUEENS AUDITORIUM UPGRADES
P.S. 150 - QUEENS 30RESO A AUDITORIUM UPGRADE$750K - $1M2024/05AUDITORIUM UPGRADESDesign
D020851 P.S. 152 - QUEENS EXT. WORK
P.S. 152 - QUEENS 30ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 152 - QUEENS 30PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 152 - QUEENS 30EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
P.S. 152 - QUEENS 30GYM WINDOWS$4M OVER2024/01EXT. WORKDesign
P.S. 152 - QUEENS 30RTU REPLACEMENT$4M OVER2024/01BUILDING SYSTEMSDesign
P.S. 152 - QUEENS 30FIRE ALARM REPLACEMENT$4M OVER2024/01ELECTRICALDesign
P026383 P.S. 156 - QUEENS ROOM CONVERSIONS/UPGRADES
P.S. 156 - QUEENS 29RESO A COMPUTER LAB UPGRADE$500K - $750K2024/01ROOM CONVERSIONS/UPGRADESDesign
P.S. 156 - QUEENS 29PATH OF TRAVEL RESO A COMPUTER LAB UPGRADE$500K - $750K2024/01ACCESSIBILITYDesign
D021153 P.S. 160 - QUEENS MISCELLANEOUS
P.S. 160 - QUEENS 28EXISTING BUILDING-INTERIOR RENOVATIONS$1M - $4M2024/07MISCELLANEOUSDesign
P.S. 160 - QUEENS 28EXISTING BUILDING-AUDITORIUM$1M - $4M2024/07ACCESSIBILITYDesign
P.S. 160 - QUEENS 28EXISTING BUILDING-CAFETERIA$1M - $4M2024/07ACCESSIBILITYDesign
P.S. 160 - QUEENS 28EXISTING BUILDING-GYMNASIUM$1M - $4M2024/07ACCESSIBILITYDesign
D022063 P.S. 161 - QUEENS EXT. WORK
P.S. 161 - QUEENS 28WINDOWS$4M OVER2024/03EXT. WORKDesign
P.S. 161 - QUEENS 28PARAPETS$4M OVER2024/03EXT. WORKDesign
D022284 P.S. 161 - QUEENS ELECTRICAL
P.S. 161 - QUEENS 28RESO A IPDVS CAMERA INSTALLATION$0 - $250K2024/05ELECTRICALDesign
D020733 P.S. 162 - QUEENS PLAYGROUNDS
P.S. 162 - QUEENS 26PLAYGROUND REDEVELOPMENT$500K - $750K2024/03PLAYGROUNDSDesign
D022237 P.S. 162 - QUEENS ACCESSIBILITY
P.S. 162 - QUEENS 26PATH OF TRAVEL PLAYGROUND REDEVELOPMENT$0 - $250K2024/06ACCESSIBILITYDesign
D022084 P.S. 166 - QUEENS EXT. WORK
P.S. 166 - QUEENS 30ROOFS$4M OVER2024/05EXT. WORKDesign
P.S. 166 - QUEENS 30PARAPETS$4M OVER2024/05EXT. WORKDesign
P.S. 166 - QUEENS 30EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
D021779 P.S. 169 - QUEENS BOILER ELECTRIFICATION
P.S. 169 - QUEENS 25ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/03BOILER ELECTRIFICATIONDesign
P.S. 169 - QUEENS 25ELECTRICAL UPGRADE$4M OVER2024/03ELECTRICALDesign
P.S. 169 - QUEENS 25WINDOWS$4M OVER2024/03EXT. WORKDesign
P.S. 169 - QUEENS 25ROOFS$4M OVER2024/03EXT. WORKDesign
D022173 P.S. 17 - QUEENS EXT. WORK
P.S. 17 - QUEENS 30ROOFS$4M OVER2024/06EXT. WORKDesign
P.S. 17 - QUEENS 30EXTERIOR MASONRY$4M OVER2024/06EXT. WORKDesign
P.S. 17 - QUEENS 30PARAPETS$4M OVER2024/06EXT. WORKDesign
P.S. 17 - QUEENS 30WINDOWS$4M OVER2024/06EXT. WORKDesign
D021020 P.S. 174 - QUEENS ELECTRICAL
P.S. 174 - QUEENS 28EXISTING BUILDING-PA/CLOCK SYSTEMS$1M - $4M2024/01ELECTRICALDesign
P.S. 174 - QUEENS 28EXISTING BUILDING-FIRE ALARM SYSTEM$1M - $4M2024/01ELECTRICALDesign
P.S. 174 - QUEENS 28EXISTING BUILDING- INTERIOR RENOVATIONS$1M - $4M2024/01MISCELLANEOUSDesign
P.S. 174 - QUEENS 28EXISTING BUILDING-AUDITORIUM$1M - $4M2024/01ACCESSIBILITYDesign
P.S. 174 - QUEENS 28EXISTING BUILDING-GYMNASIUM$1M - $4M2024/01ACCESSIBILITYDesign
D021610 P.S. 184 - QUEENS EXT. WORK
P.S. 184 - QUEENS 25ROOFS$4M OVER2024/03EXT. WORKDesign
P.S. 184 - QUEENS 25PARAPETS$4M OVER2024/03EXT. WORKDesign
P.S. 184 - QUEENS 25EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
D022191 P.S. 19 - QUEENS EXT. WORK
P.S. 19 - QUEENS 24PARAPETS$4M OVER2024/04EXT. WORKDesign
P.S. 19 - QUEENS 24ROOFS$4M OVER2024/04EXT. WORKDesign
P.S. 19 - QUEENS 24WINDOWS$4M OVER2024/04EXT. WORKDesign
D022317 P.S. 20 - QUEENS ELECTRICAL
P.S. 20 - QUEENS 25RESO A IPDVS CAMERA INSTALLATION$250K - $500K2024/06ELECTRICALDesign
D020067 P.S. 206 - QUEENS MISCELLANEOUS
P.S. 206 - QUEENS 28SSBA - EXISTING SCHOOL RENOVATION WORK$1M - $4M2024/01MISCELLANEOUSDesign
D021613 P.S. 206 - QUEENS EXT. WORK
P.S. 206 - QUEENS 28ROOFS$4M OVER2024/03EXT. WORKDesign
P.S. 206 - QUEENS 28PARAPETS$4M OVER2024/03EXT. WORKDesign
P.S. 206 - QUEENS 28EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
D021725 P.S. 206 - QUEENS PLAYGROUNDS
P.S. 206 - QUEENS 28SSBA - DEMOLITION OF TCU UNIT AND PLAYGROUND DEVELOPMENT$1M - $4M2024/02PLAYGROUNDSDesign
D022192 P.S. 207 - QUEENS EXT. WORK
P.S. 207 - QUEENS 27ROOFS$4M OVER2024/04EXT. WORKDesign
P.S. 207 - QUEENS 27EXTERIOR MASONRY$4M OVER2024/04EXT. WORKDesign
D021575 P.S. 209 - QUEENS EXT. WORK
P.S. 209 - QUEENS 25ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 209 - QUEENS 25PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 209 - QUEENS 25WINDOWS$4M OVER2024/01EXT. WORKDesign
P.S. 209 - QUEENS 25EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
D022294 P.S. 209 - QUEENS PLAYGROUNDS
P.S. 209 - QUEENS 25PLAYGROUND$1M - $4M2024/06PLAYGROUNDSDesign
D020344 P.S. 228 - QUEENS EXT. WORK
P.S. 228 - QUEENS 30PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 228 - QUEENS 30ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 228 - QUEENS 30EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
D021583 P.S. 239 - QUEENS EXT. WORK
P.S. 239 - QUEENS 24EXTERIOR MASONRY$1M - $4M2024/01EXT. WORKDesign
D021866 P.S. 239 - QUEENS PLAYGROUNDS
P.S. 239 - QUEENS 24RESO A PLAYGROUND UPGRADE$250K - $500K2024/02PLAYGROUNDSDesign
D022313 P.S. 244 - QUEENS BOILER ELECTRIFICATION
P.S. 244 - QUEENS 25ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/06BOILER ELECTRIFICATIONScope
D021198 P.S. 26 - QUEENS ACCESSIBILITY
P.S. 26 - QUEENS 26EXISTING BUILDING-GYMNASIUM$500K - $750K2024/01ACCESSIBILITYDesign
P.S. 26 - QUEENS 26EXISTING BUILDING-AUDITORIUM$500K - $750K2024/01ACCESSIBILITYDesign
D021264 P.S. 26 - QUEENS EXT. WORK
P.S. 26 - QUEENS 26IDA FLOOD ELIMINATION$1M - $4M2024/01EXT. WORKDesign
P.S. 26 - QUEENS 26IDA INTERIOR SPACES$1M - $4M2024/01INTERIORDesign
D021592 P.S. 268 - QUEENS EXT. WORK
P.S. 268 - QUEENS 29ROOFS$1M - $4M2024/03EXT. WORKDesign
P.S. 268 - QUEENS 29EXTERIOR MASONRY$1M - $4M2024/03EXT. WORKDesign
D022311 P.S. 273 - QUEENS BOILER ELECTRIFICATION
P.S. 273 - QUEENS 27ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/06BOILER ELECTRIFICATIONScope
D022312 P.S. 306 - QUEENS BOILER ELECTRIFICATION
P.S. 306 - QUEENS 27ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/06BOILER ELECTRIFICATIONScope
D022204 P.S. 307 - QUEENS EXT. WORK
P.S. 307 - QUEENS 24ROOFS$1M - $4M2024/05EXT. WORKDesign
P.S. 307 - QUEENS 24EXTERIOR MASONRY$1M - $4M2024/05EXT. WORKDesign
D020704 P.S. 32 - QUEENS OTHER
P.S. 32 - QUEENS 25EXISTING BUILDING WORK$4M OVER2024/01OTHERDesign
D022322 P.S. 360 - QUEENS ELECTRICAL
P.S. 360 - QUEENS 29RESO A IPDVS CAMERA INSTALLATION$0 - $250K2024/06ELECTRICALDesign
D021107 P.S. 40 - QUEENS EXT. WORK
P.S. 40 - QUEENS 28ROOF REPLACEMENT$4M OVER2024/01EXT. WORKDesign
D020447 P.S. 41 - QUEENS MISCELLANEOUS
P.S. 41 - QUEENS 26SSBA - WORK IN EXISTING BUILDING$1M - $4M2024/01MISCELLANEOUSDesign
D021528 P.S. 62 - QUEENS EXT. WORK
P.S. 62 - QUEENS 27ROOFS$4M OVER2024/04EXT. WORKDesign
P.S. 62 - QUEENS 27PARAPETS$4M OVER2024/04EXT. WORKDesign
P.S. 62 - QUEENS 27EXTERIOR MASONRY$4M OVER2024/04EXT. WORKDesign
P.S. 62 - QUEENS 27WINDOWS$4M OVER2024/04EXT. WORKDesign
D022086 P.S. 7 - QUEENS EXT. WORK
P.S. 7 - QUEENS 24ROOFS$4M OVER2024/05EXT. WORKDesign
P.S. 7 - QUEENS 24PARAPETS$4M OVER2024/05EXT. WORKDesign
P.S. 7 - QUEENS 24EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
P.S. 7 - QUEENS 24WINDOWS$4M OVER2024/05EXT. WORKDesign
D021893 P.S. 79 - QUEENS PLAYGROUNDS
P.S. 79 - QUEENS 25RESO A OUTDOOR CLASSROOM$250K - $500K2024/01PLAYGROUNDSDesign
D021847 P.S. 80 - QUEENS LIBRARY UPGRADES
P.S. 80 - QUEENS 28RESO A MULTIMEDIA CENTER$250K - $500K2024/02LIBRARY UPGRADESDesign
D022083 P.S. 81 - QUEENS EXT. WORK
P.S. 81 - QUEENS 24PARAPETS$4M OVER2024/05EXT. WORKDesign
P.S. 81 - QUEENS 24EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
P.S. 81 - QUEENS 24FLOOD ELIMINATION$4M OVER2024/05EXT. WORKDesign
P.S. 81 - QUEENS 24WINDOWS$4M OVER2024/05EXT. WORKDesign
P.S. 81 - QUEENS 24ROOFS$4M OVER2024/05EXT. WORKDesign
D019829 P.S. 84 - QUEENS BUILDING SYSTEMS
P.S. 84 - QUEENS 30STRUCTURAL REPAIRS$4M OVER2024/01BUILDING SYSTEMSDesign
D021573 P.S. 84 - QUEENS EXT. WORK
P.S. 84 - QUEENS 30ROOFS$4M OVER2024/02EXT. WORKDesign
P.S. 84 - QUEENS 30EXTERIOR MASONRY$4M OVER2024/02EXT. WORKDesign
P.S. 84 - QUEENS 30FLOOD ELIMINATION$4M OVER2024/02EXT. WORKDesign
P.S. 84 - QUEENS 30FIRE ALARM SYSTEM REPLACEMENT$4M OVER2024/02ELECTRICALDesign
P.S. 84 - QUEENS 30HVAC UPGRADES$4M OVER2024/02BUILDING SYSTEMSDesign
P.S. 84 - QUEENS 30WINDOWS$4M OVER2024/02EXT. WORKDesign
D021039 P.S. 87 - QUEENS EXT. WORK
P.S. 87 - QUEENS 24IDA FLOOD ELIMINATION$250K - $500K2024/01EXT. WORKDesign
P.S. 87 - QUEENS 24IDA INTERIOR SPACES$250K - $500K2024/01INTERIORDesign
D021870 P.S. 87 - QUEENS WALK-IN REFRIGERATORS AND FREEZERS
P.S. 87 - QUEENS 24RESO A KITCHEN UPGRADE$1M - $4M2024/05WALK-IN REFRIGERATORS AND FREEZERSDesign
D022199 P.S. 87 - QUEENS EXT. WORK
P.S. 87 - QUEENS 24EXTERIOR MASONRY$4M OVER2024/04EXT. WORKDesign
P.S. 87 - QUEENS 24ROOFS$4M OVER2024/04EXT. WORKDesign
D019337 P.S. 89 - QUEENS ELECTRICAL
P.S. 89 - QUEENS 24FIRE ALARM REPLACEMENT$4M OVER2024/01ELECTRICALDesign
P.S. 89 - QUEENS 24VENTILATION$4M OVER2024/01BUILDING SYSTEMSDesign
D022195 P.S. 89 - QUEENS EXT. WORK
P.S. 89 - QUEENS 24ROOFS$4M OVER2024/04EXT. WORKDesign
P.S. 89 - QUEENS 24WINDOWS$4M OVER2024/04EXT. WORKDesign
P.S. 89 - QUEENS 24FLOOD ELIMINATION$4M OVER2024/04EXT. WORKDesign
P.S. 89 - QUEENS 24EXTERIOR MASONRY$4M OVER2024/04EXT. WORKDesign
D022364 P.S. 89 - QUEENS BUILDING SYSTEMS
P.S. 89 - QUEENS 24AIR HANDLING UNITS$750K - $1M2024/05BUILDING SYSTEMSDesign
D021143 P.S. 92 - QUEENS PLAYGROUNDS
P.S. 92 - QUEENS 30PLAYGROUND UPGRADE$1M - $4M2024/02PLAYGROUNDSDesign
D022508 P.S. 92 - QUEENS ACCESSIBILITY
P.S. 92 - QUEENS 30PATH OF TRAVEL PLAYGROUND UPGRADE$0 - $250K2024/07ACCESSIBILITYScope
D021666 P.S. 95 - QUEENS MISCELLANEOUS
P.S. 95 - QUEENS 29EXISTING BUILDING-INTERIOR RENOVATION$1M - $4M2024/02MISCELLANEOUSDesign
D022085 QNS HS OF TEACH., LIB. ARTS&SCI-Q EXT. WORK
QNS HS OF TEACH., LIB. ARTS&SCI-Q 26ROOFS$4M OVER2024/05EXT. WORKDesign
QNS HS OF TEACH., LIB. ARTS&SCI-Q 26PARAPETS$4M OVER2024/05EXT. WORKDesign
QNS HS OF TEACH., LIB. ARTS&SCI-Q 26FIRE ALARM SYSTEM$4M OVER2024/05ELECTRICALDesign
QNS HS OF TEACH., LIB. ARTS&SCI-Q 26EXTERIOR MASONRY$4M OVER2024/05EXT. WORKDesign
D022246 QNS HS OF TEACH., LIB. ARTS&SCI-Q MISCELLANEOUS
QNS HS OF TEACH., LIB. ARTS&SCI-Q 26UNION TPK BRIDGE OVER CROSS ISLAND PKWY IMPACT ON GLEN OAKS LIGHTING$250K - $500K2024/03MISCELLANEOUSDesign
D021854 QUEENS METROPOLITAN HIGH SCHOOL - QUEENS LIBRARY UPGRADES
QUEENS METROPOLITAN HIGH SCHOOL - QUEENS 28RESO A LIBRARY UPGRADE$250K - $500K2024/02LIBRARY UPGRADESDesign
D022323 THE EMERSON SCHOOL - QUEENS ELECTRICAL
THE EMERSON SCHOOL - QUEENS 28RESO A IPDVS CAMERA INSTALLATION$0 - $250K2024/06ELECTRICALScope
D020736 THOMAS A. EDISON HS - Q SCIENCE LAB UPGRADES
THOMAS A. EDISON HS - Q 28PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE$0 - $250K2024/02SCIENCE LAB UPGRADESDesign
D020961 THOMAS A. EDISON HS - Q SCIENCE LAB UPGRADES
THOMAS A. EDISON HS - Q 28RESO A SCIENCE LAB UPGRADE$750K - $1M2024/02SCIENCE LAB UPGRADESDesign
D020818 YOUNG WOMENS' LEADERSHIP SCHOOL - QUEENS EXT. WORK
YOUNG WOMENS' LEADERSHIP SCHOOL - QUEENS 28EXTERIOR MASONRY$1M - $4M2024/01EXT. WORKDesign
YOUNG WOMENS' LEADERSHIP SCHOOL - QUEENS 28ROOFS$1M - $4M2024/01EXT. WORKDesign
STATEN ISLAND
D021786 CONCORD HS - R ELECTRICAL
CONCORD HS - R 31RESO A ELECTRICAL UPGRADE$0 - $250K2024/03ELECTRICALDesign
D022227 I.S. 61 - STATEN ISLAND WALK-IN REFRIGERATORS AND FREEZERS
I.S. 61 - STATEN ISLAND 31WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D022290 I.S. 7 - STATEN ISLAND ELECTRICAL
I.S. 7 - STATEN ISLAND 31RESO A IPDVS CAMERA INSTALLATION$250K - $500K2024/05ELECTRICALDesign
D021204 I.S. 72 - STATEN ISLAND EXT. WORK
I.S. 72 - STATEN ISLAND 31IDA FLOOD ELIMINATION$1M - $4M2024/01EXT. WORKDesign
I.S. 72 - STATEN ISLAND 31IDA INTERIOR SPACES$1M - $4M2024/01INTERIORDesign
D021461 I.S. 72 - STATEN ISLAND EXT. WORK
I.S. 72 - STATEN ISLAND 31CONCRETE PARAPET WALL$4M OVER2024/01EXT. WORKDesign
I.S. 72 - STATEN ISLAND 31EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
I.S. 72 - STATEN ISLAND 31ROOFS$4M OVER2024/01EXT. WORKDesign
D020275 NEW DORP HS - STATEN ISLAND ATHLETIC FIELDS
NEW DORP HS - STATEN ISLAND 31RESO A FIELD UPGRADE$4M OVER2024/03ATHLETIC FIELDSDesign
D021853 P.S. 22 - STATEN ISLAND AUDITORIUM UPGRADES
P.S. 22 - STATEN ISLAND 31RESO A AUDITORIUM UPGRADE$250K - $500K2024/04AUDITORIUM UPGRADESDesign
D021852 P.S. 23 - STATEN ISLAND GYMNASIUM
P.S. 23 - STATEN ISLAND 31RESO A GYMNASIUM UPGRADE$250K - $500K2024/02GYMNASIUMDesign
D021967 P.S. 23 - STATEN ISLAND ACCESSIBILITY
P.S. 23 - STATEN ISLAND 31PATH OF TRAVEL RESO A GYMNASIUM UPGRADE$0 - $250K2024/03ACCESSIBILITYDesign
D021702 P.S. 29 - STATEN ISLAND EXT. WORK
P.S. 29 - STATEN ISLAND 31EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
P.S. 29 - STATEN ISLAND 31PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 29 - STATEN ISLAND 31ROOFS$4M OVER2024/01EXT. WORKDesign
D021191 P.S. 30 - STATEN ISLAND PLAYGROUNDS
P.S. 30 - STATEN ISLAND 31RESO A (MA) PLAYGROUND UPGRADE$250K - $500K2024/04PLAYGROUNDSDesign
D021618 P.S. 31 - STATEN ISLAND EXT. WORK
P.S. 31 - STATEN ISLAND 31ROOFS$4M OVER2024/02EXT. WORKDesign
P.S. 31 - STATEN ISLAND 31PARAPETS$4M OVER2024/02EXT. WORKDesign
P.S. 31 - STATEN ISLAND 31EXTERIOR MASONRY$4M OVER2024/02EXT. WORKDesign
D021480 P.S. 32 - STATEN ISLAND PLAYGROUNDS
P.S. 32 - STATEN ISLAND 31RESO A PLAYGROUND UPGRADE$500K - $750K2024/03PLAYGROUNDSDesign
D022248 P.S. 32 - STATEN ISLAND EXT. WORK
P.S. 32 - STATEN ISLAND 31FACADE RESTORATION$750K - $1M2024/06EXT. WORKDesign
D022288 P.S. 4 - STATEN ISLAND ELECTRICAL
P.S. 4 - STATEN ISLAND 31RESO A IPDVS UPGRADE$0 - $250K2024/04ELECTRICALDesign
D020892 P.S. 41 - STATEN ISLAND BOILER/HEAT PUMP
P.S. 41 - STATEN ISLAND 31PLANYC BOILER CONVERSION$4M OVER2024/01BOILER/HEAT PUMPDesign
P.S. 41 - STATEN ISLAND 31PLANYC CLIMATE CONTROL$4M OVER2024/01BOILER/HEAT PUMPDesign
D021597 P.S. 41 - STATEN ISLAND EXT. WORK
P.S. 41 - STATEN ISLAND 31ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 41 - STATEN ISLAND 31PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 41 - STATEN ISLAND 31EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
P.S. 41 - STATEN ISLAND 31WINDOWS$4M OVER2024/01EXT. WORKDesign
D021716 P.S. 41 - STATEN ISLAND BOILER ELECTRIFICATION
P.S. 41 - STATEN ISLAND 31ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/02BOILER ELECTRIFICATIONDesign
P.S. 41 - STATEN ISLAND 31ELECTRICAL SERVICE UPGRADE$4M OVER2024/02ELECTRICALDesign
D018391 P.S. 42 - STATEN ISLAND PLAYGROUNDS
P.S. 42 - STATEN ISLAND 31RESO A PLAYGROUNDS$750K - $1M2024/01PLAYGROUNDSDesign
D020703 P.S. 5 - STATEN ISLAND OTHER
P.S. 5 - STATEN ISLAND 31EXISTING BUILDING WORK$1M - $4M2024/01OTHERDesign
P.S. 5 - STATEN ISLAND 31EXISTING BUILDING-AUD/GYM$1M - $4M2024/01ACCESSIBILITYDesign
D021689 P.S. 53 - STATEN ISLAND EXT. WORK
P.S. 53 - STATEN ISLAND 31FLOOD ELIMINATION$1M - $4M2024/01EXT. WORKDesign
D022292 P.S. 65 - STATEN ISLAND EXT. WORK
P.S. 65 - STATEN ISLAND 31CLOCK TOWER REPAIR @ R829 PERMANENT FIX$500K - $750K2024/04EXT. WORKDesign
D021790 P.S. 69 - STATEN ISLAND EXT. WORK
P.S. 69 - STATEN ISLAND 31FLOOD ELIMINATION$4M OVER2024/05EXT. WORKDesign
D022330 P.S. 69 - STATEN ISLAND ELECTRICAL
P.S. 69 - STATEN ISLAND 31RESO A PA SYSTEM UPGRADE$250K - $500K2024/06ELECTRICALScope
D018009 P.S. 80 - STATEN ISLAND BUILDING SYSTEMS
P.S. 80 - STATEN ISLAND 31HVAC UPGRADES$4M OVER2024/01BUILDING SYSTEMSDesign
P.S. 80 - STATEN ISLAND 31EMERGENCY GENERATOR REPLACEMENT$4M OVER2024/01ELECTRICALDesign
P.S. 80 - STATEN ISLAND 31VENTILATION$4M OVER2024/01BUILDING SYSTEMSDesign
P.S. 80 - STATEN ISLAND 31BMS UPGRADE$4M OVER2024/01BOILER/HEAT PUMPDesign
D022228 P.S. 80 - STATEN ISLAND WALK-IN REFRIGERATORS AND FREEZERS
P.S. 80 - STATEN ISLAND 31WALK-IN REFRIGERATORS AND FREEZERS$750K - $1M2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D022253 P.S. 80 - STATEN ISLAND BUILDING SYSTEMS
P.S. 80 - STATEN ISLAND 31REINFORCING SUPPORT ELEMENTS$1M - $4M2024/04BUILDING SYSTEMSDesign
D022289 THE HARBOR VIEW SCHOOL - R ELECTRICAL
THE HARBOR VIEW SCHOOL - R 31RESO A IPDVS UPGRADE$0 - $250K2024/06ELECTRICALDesign
D021203 THE RICHMOND PRE-K CENTER EXT. WORK
THE RICHMOND PRE-K CENTER 31IDA FLOOD ELIMINATION$1M - $4M2024/01EXT. WORKDesign
THE RICHMOND PRE-K CENTER 31IDA INTERIOR SPACES$1M - $4M2024/01INTERIORDesign
D022275 THE RICHMOND PRE-K CENTER ACCESSIBILITY
THE RICHMOND PRE-K CENTER 31PATH OF TRAVEL IDA INTERIOR SPACES$0 - $250K2024/01ACCESSIBILITYDesign
D021214 TOTTENVILLE HS - STATEN ISLAND ATHLETIC FIELDS
TOTTENVILLE HS - STATEN ISLAND 31NEW FIELDHOUSE BUILDING$4M OVER2024/03ATHLETIC FIELDSDesign
D021218 TOTTENVILLE HS - STATEN ISLAND ACCESSIBILITY
TOTTENVILLE HS - STATEN ISLAND 31FULL PROGRAM ACCESSIBILITY$4M OVER2024/02ACCESSIBILITYDesign
TOTTENVILLE HS - STATEN ISLAND 31LOW VOLTAGE ELECTRICAL SYSTEMS$4M OVER2024/02ELECTRICALDesign
D021709 TOTTENVILLE HS - STATEN ISLAND EXT. WORK
TOTTENVILLE HS - STATEN ISLAND 31EXTERIOR MASONRY - PERM FIX FOR RED DOT 131992$4M OVER2024/05EXT. WORKDesign
Xml: D022029 A SCHOOL WITHOUT WALLS BRONX 08 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/04 PLAYGROUNDS Design D022250 A SCHOOL WITHOUT WALLS BRONX 08 PATH OF TRAVEL-OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $250K - $500K 2024/03 ACCESSIBILITY Design D021669 ALFRED E. SMITH HS - X BRONX 07 STRUCTURAL CONCRETE FAILURE @ X600 $750K - $1M 2024/01 EXT. WORK Design D022216 BRONX CNTR FOR SCIENCE & MATH - X BRONX 09 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/04 WALK-IN REFRIGERATORS AND FREEZERS Design D021848 BRONX HEALTH SCIENCES HS - X BRONX 11 RESO A CAFETERIA UPGRADE $500K - $750K 2024/02 ROOM CONVERSIONS/UPGRADES Design D021047 BRONX INTERNATIONAL - BRONX BRONX 09 TCU REMOVAL/PLAYGROUND REDEVELOPMENT $4M OVER 2024/01 PLAYGROUNDS Design D021238 BRONX INTERNATIONAL - BRONX BRONX 09 PATH OF TRAVEL TCU REMOVAL/PLAYGROUND REDEVELOPMENT $0 - $250K 2024/01 ACCESSIBILITY Design D022072 BRONX INTERNATIONAL - BRONX BRONX 09 PATH OF TRAVEL SCIENCE LAB UPGRADES $0 - $250K 2024/01 ACCESSIBILITY Design D022056 BRONX LAB SCHOOL - BRONX BRONX 11 REINFORCING SUPPORT ELEMENTS $4M OVER 2024/05 BUILDING SYSTEMS Design D022056 BRONX LAB SCHOOL - BRONX BRONX 11 SWIMMING POOL $4M OVER 2024/05 MISCELLANEOUS Design D022304 BRONX LAB SCHOOL - BRONX BRONX 11 PATH OF TRAVEL SWIMMING POOL $750K - $1M 2024/05 ACCESSIBILITY Design D021042 BRONX LEADERSHIP ACADEMY II HS - BRONX BRONX 07 IDA INTERIOR SPACES $1M - $4M 2024/01 INTERIOR Design D021844 BRONX SCHOOL FOR LAW, GOVERNMENT AND JUSTICE BRONX 09 RESO A GYMNASIUM UPGRADE $250K - $500K 2024/01 GYMNASIUM Design D021826 CROTONA INTERNATIONAL HIGH SCHOOL - BRONX BRONX 10 RESO A PLAYGROUND UPGRADE $1M - $4M 2024/03 PLAYGROUNDS Design D022039 CROTONA INTERNATIONAL HIGH SCHOOL - BRONX BRONX 10 PATH OF TRAVEL RESO A PLAYGROUND UPGRADE $250K - $500K 2024/03 ACCESSIBILITY Design D021270 FAIRMONT NEIGHBORHOOD SCHOOL BRONX 12 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021270 FAIRMONT NEIGHBORHOOD SCHOOL BRONX 12 ROOFS $4M OVER 2024/01 EXT. WORK Design D021270 FAIRMONT NEIGHBORHOOD SCHOOL BRONX 12 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D020065 FORDHAM HS FOR THE ARTS - BRONX BRONX 10 STRUCTURAL ELEMENTS UNDER POOL $4M OVER 2024/02 MISCELLANEOUS Design D021064 FORDHAM HS FOR THE ARTS - BRONX BRONX 10 PATH OF TRAVEL STRUCTURAL ELEMENTS UNDER POOL $1M - $4M 2024/02 ACCESSIBILITY Design D021604 GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER BRONX 09 PARAPETS $1M - $4M 2024/03 EXT. WORK Design D021604 GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER BRONX 09 WINDOWS $1M - $4M 2024/03 EXT. WORK Design D021604 GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER BRONX 09 EXTERIOR MASONRY $1M - $4M 2024/03 EXT. WORK Design D021181 HARRY S. TRUMAN HS - X BRONX 11 PATH OF TRAVEL RESO A ATHLETIC FIELD $4M OVER 2024/03 ACCESSIBILITY Design D021181 HARRY S. TRUMAN HS - X BRONX 11 RESO A ATHLETIC FIELD UPGRADE $4M OVER 2024/03 ATHLETIC FIELDS Design D018566 HOLCOMBE L. RUCKER SCHOOLOF COMMUNITY RESEARCH - BRONX BRONX 08 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/02 BOILER ELECTRIFICATION Design D021602 HOSTOS-LINCOLN ACADEMY OF SCIENCE BRONX 07 PARAPETS $4M OVER 2024/05 EXT. WORK Design D021602 HOSTOS-LINCOLN ACADEMY OF SCIENCE BRONX 07 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D021441 HS OF COMPUTERS & TECHNOLOGY - X BRONX 11 RESO A LOCKER ROOM UPGRADE $4M OVER 2024/03 GYMNASIUM Design D021653 I.S. 118 - BRONX BRONX 10 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/03 PLAYGROUNDS Design D020700 I.S. 22 - BRONX BRONX 09 RESO A (MA) AUDITORIUM UPGRADE $1M - $4M 2024/01 AUDITORIUM UPGRADES Design D022092 I.S. 22 - BRONX BRONX 09 ROOFS $4M OVER 2024/06 EXT. WORK Design D022092 I.S. 22 - BRONX BRONX 09 GYMNASIUM FLOORING $4M OVER 2024/06 GYMNASIUM Design D022092 I.S. 22 - BRONX BRONX 09 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D022092 I.S. 22 - BRONX BRONX 09 WINDOWS $4M OVER 2024/06 EXT. WORK Design D022092 I.S. 22 - BRONX BRONX 09 PARAPETS $4M OVER 2024/06 EXT. WORK Design D022218 I.S. 339 - BRONX BRONX 09 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D021915 I.S. 390 - BRONX BRONX 10 FIRE ALARM SYSTEM REPLACEMENT $1M - $4M 2024/03 ELECTRICAL Design D021829 I.S. 391 - BRONX BRONX 10 RESO A PLAYGROUND UPGRADE $4M OVER 2024/03 PLAYGROUNDS Design D021989 I.S. 391 - BRONX BRONX 10 PATH OF TRAVEL RESO A PLAYGROUND UPGRADE $0 - $250K 2024/03 ACCESSIBILITY Design D021633 I.S. 424 - BRONX BRONX 08 RESO A AUDITORIUM UPGRADE $750K - $1M 2024/03 AUDITORIUM UPGRADES Design P026405 I.S. 562 - BRONX BRONX 08 RESO A AUDITORIUM UPGRADE $750K - $1M 2024/01 AUDITORIUM UPGRADES Design P026405 I.S. 562 - BRONX BRONX 08 PATH OF TRAVEL RESO A AUDITORIUM UPGRADE $750K - $1M 2024/01 ACCESSIBILITY Design D021808 I.S. 80 - BRONX BRONX 10 RESO A AUDITORIUM UPGRADE $500K - $750K 2024/07 AUDITORIUM UPGRADES Scope D018566 LONGWOOD PREPARATORY ACADEMY BRONX 08 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2024/02 ELECTRICAL Design D018566 LONGWOOD PREPARATORY ACADEMY BRONX 08 ELECTRICAL SERVICE UPGRADE $4M OVER 2024/02 ELECTRICAL Design D020997 M.S. 363 - BRONX BRONX 10 SWIMMING POOL $1M - $4M 2024/01 MISCELLANEOUS Design D021085 M.S. 363 - BRONX BRONX 10 EXTERIOR MASONRY @ X115 $1M - $4M 2024/01 EXT. WORK Design D021085 M.S. 363 - BRONX BRONX 10 WINDOWS $1M - $4M 2024/01 EXT. WORK Design D022044 M.S. 363 - BRONX BRONX 10 GYM FLOOR REPLACEMENT $1M - $4M 2024/01 FLOORS Design D021476 M.S./H.S. 225 - BRONX BRONX 10 RESO A ROOM CONVERSION $750K - $1M 2024/02 ROOM CONVERSIONS/UPGRADES Design D022282 M.S./H.S. 225 - BRONX BRONX 10 PATH OF TRAVEL RESO A ROOM CONVERSION $0 - $250K 2024/03 ACCESSIBILITY Design D022257 M.S./H.S. 342 - BRONX BRONX 10 FIRE SPRINKLER SYSTEM $750K - $1M 2024/05 ELECTRICAL Design D021474 M.S./H.S. 368 - BRONX BRONX 10 RESO A ATHLETIC FIELD UPGRADE $750K - $1M 2024/02 ATHLETIC FIELDS Design D021079 MORRIS COLLAB HS TECH & HUMAN - X BRONX 09 SCIENCE LAB UPGRADES $1M - $4M 2024/01 SCIENCE LAB UPGRADES Design D021454 P.S. 105 - BRONX BRONX 11 EXISTING BUILDING-AUDITORIUM $4M OVER 2024/06 ACCESSIBILITY Design D021454 P.S. 105 - BRONX BRONX 11 EXISTING BUILDING-INTERIOR RENOVATIONS $4M OVER 2024/06 MISCELLANEOUS Design D021454 P.S. 105 - BRONX BRONX 11 EXISTING BUILDING-IPDVS WORK $4M OVER 2024/06 ELECTRICAL Design D021454 P.S. 105 - BRONX BRONX 11 EXISTING BUILDING-FIRE ALARM WORK $4M OVER 2024/06 ELECTRICAL Design D021454 P.S. 105 - BRONX BRONX 11 EXISTING BUILDING-ELECTRICAL SYSTEMS $4M OVER 2024/06 ELECTRICAL Design D021454 P.S. 105 - BRONX BRONX 11 PARAPETS $4M OVER 2024/06 EXT. WORK Design D021454 P.S. 105 - BRONX BRONX 11 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D021660 P.S. 105 - BRONX BRONX 11 EXISTING BUILDING-GYMNASIUM $750K - $1M 2024/01 ACCESSIBILITY Design D022049 P.S. 106 - BRONX BRONX 11 EXTERIOR MASONRY $1M - $4M 2024/07 EXT. WORK Design D021629 P.S. 107 - BRONX BRONX 08 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021629 P.S. 107 - BRONX BRONX 08 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021629 P.S. 107 - BRONX BRONX 08 ROOFS $4M OVER 2024/01 EXT. WORK Design D021629 P.S. 107 - BRONX BRONX 08 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D022217 P.S. 11 - BRONX BRONX 09 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/04 WALK-IN REFRIGERATORS AND FREEZERS Design D018712 P.S. 110 - BRONX BRONX 09 REPAIR RETAINING WALLS $1M - $4M 2024/01 EXT. WORK Design D021889 P.S. 112 - BRONX BRONX 11 RESO A PLAYGROUND UPGRADE $1M - $4M 2024/06 PLAYGROUNDS Design D021773 P.S. 119 - BRONX BRONX 08 STRUCTURAL ISSUES/BUILDING FACADES- PERM FIX $4M OVER 2024/04 MISCELLANEOUS Design D021773 P.S. 119 - BRONX BRONX 08 ROOFS $4M OVER 2024/04 EXT. WORK Design D021773 P.S. 119 - BRONX BRONX 08 WINDOWS $4M OVER 2024/04 EXT. WORK Design D021773 P.S. 119 - BRONX BRONX 08 PARAPETS $4M OVER 2024/04 EXT. WORK Design D021065 P.S. 126 - BRONX BRONX 09 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/01 ACCESSIBILITY Design D021065 P.S. 126 - BRONX BRONX 09 LOW VOLTAGE ELECTRICAL SYSTEMS $4M OVER 2024/01 ELECTRICAL Design D020055 P.S. 138 - BRONX BRONX 08 PLANYC BOILER CONVERSION $4M OVER 2024/02 BOILER/HEAT PUMP Design D020056 P.S. 138 - BRONX BRONX 08 PLANYC CLIMATE CONTROL $1M - $4M 2024/02 BOILER/HEAT PUMP Design D021767 P.S. 138 - BRONX BRONX 08 EXISTING BUILDING-INTERIOR RENOVATIONS $1M - $4M 2024/05 MISCELLANEOUS Design D022255 P.S. 15 - BRONX BRONX 10 RESO A GYMNASIUM UPGRADE $500K - $750K 2024/04 GYMNASIUM Design D020239 P.S. 150 - BRONX BRONX 12 RESO A AUDITORIUM UPGRADE $750K - $1M 2024/01 AUDITORIUM UPGRADES Design D019502 P.S. 152 - BRONX BRONX 08 PARAPETS $4M OVER 2024/01 EXT. WORK Design D019502 P.S. 152 - BRONX BRONX 08 ROOFS $4M OVER 2024/01 EXT. WORK Design D019502 P.S. 152 - BRONX BRONX 08 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D019502 P.S. 152 - BRONX BRONX 08 CHILLER PLANT UPGRADE $4M OVER 2024/01 BUILDING SYSTEMS Design D019502 P.S. 152 - BRONX BRONX 08 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D020917 P.S. 154 - BRONX BRONX 07 RESO A AUDITORIUM UPGRADE $250K - $500K 2024/01 AUDITORIUM UPGRADES Design D021686 P.S. 161 - BRONX BRONX 07 ROOF REPLACEMENT $4M OVER 2024/05 EXT. WORK Design D021686 P.S. 161 - BRONX BRONX 07 PARAPETS $4M OVER 2024/05 EXT. WORK Design D021686 P.S. 161 - BRONX BRONX 07 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022096 P.S. 19 - BRONX BRONX 11 EXTERIOR MASONRY $4M OVER 2024/04 EXT. WORK Design D022096 P.S. 19 - BRONX BRONX 11 PARAPETS $4M OVER 2024/04 EXT. WORK Design D022096 P.S. 19 - BRONX BRONX 11 FLOOD ELIMINATION $4M OVER 2024/04 EXT. WORK Design D021752 P.S. 195 - BRONX BRONX 12 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/01 PLAYGROUNDS Design D022308 P.S. 195 - BRONX BRONX 12 PATH OF TRAVEL- OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $250K - $500K 2024/06 ACCESSIBILITY Design D021073 P.S. 199 - BRONX BRONX 09 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/03 ACCESSIBILITY Design D021619 P.S. 199 - BRONX BRONX 09 ROOFS $4M OVER 2024/03 EXT. WORK Design D021619 P.S. 199 - BRONX BRONX 09 PARAPETS $4M OVER 2024/03 EXT. WORK Design D021619 P.S. 199 - BRONX BRONX 09 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D021619 P.S. 199 - BRONX BRONX 09 WINDOWS $4M OVER 2024/03 EXT. WORK Design D021256 P.S. 20 - BRONX BRONX 10 HVAC AND BMS UPGRADE $4M OVER 2024/01 BOILER/HEAT PUMP Design D021256 P.S. 20 - BRONX BRONX 10 RTU REPLACEMENT $4M OVER 2024/01 BUILDING SYSTEMS Design D021256 P.S. 20 - BRONX BRONX 10 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2024/01 ELECTRICAL Design D022219 P.S. 214 - BRONX BRONX 12 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design P026398 P.S. 25 - BRONX BRONX 07 IPDVS CAMERA INSTALLATION $500K - $750K 2024/01 ELECTRICAL Design D021110 P.S. 279 - BRONX BRONX 10 PLAYGROUND UPGRADE $4M OVER 2024/03 PLAYGROUNDS Design D021654 P.S. 32 - BRONX BRONX 10 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT: $1M - $4M 2024/06 PLAYGROUNDS Design D021621 P.S. 54 - BRONX BRONX 10 PARAPETS $1M - $4M 2024/02 EXT. WORK Design D021621 P.S. 54 - BRONX BRONX 10 EXTERIOR MASONRY $1M - $4M 2024/02 EXT. WORK Design D021621 P.S. 54 - BRONX BRONX 10 ROOFS $1M - $4M 2024/02 EXT. WORK Design P026398 P.S. 57 - BRONX BRONX 12 IPDVS CAMERA INSTALLATION $500K - $750K 2024/01 ELECTRICAL Design D020016 P.S. 67 - BRONX BRONX 12 KITCHEN ANSUL SYSTEM $500K - $750K 2024/01 SCHOOL SAFETY Design D021648 P.S. 70 - BRONX BRONX 09 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/03 PLAYGROUNDS Design D021648 P.S. 70 - BRONX BRONX 09 PATH OF TRAVEL-OTHER TEMP STRUCTURE REMOVAL $1M - $4M 2024/03 ACCESSIBILITY Design D022230 P.S. 70 - BRONX BRONX 09 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/04 WALK-IN REFRIGERATORS AND FREEZERS Design D021272 P.S. 72 - BRONX BRONX 08 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D021272 P.S. 72 - BRONX BRONX 08 WINDOWS $4M OVER 2024/03 EXT. WORK Design D021272 P.S. 72 - BRONX BRONX 08 PARAPETS $4M OVER 2024/03 EXT. WORK Design D022145 P.S. 73 - BRONX BRONX 09 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/06 PLAYGROUNDS Design D022180 P.S. 754 SPED - BRONX BRONX 07 ROOFS $4M OVER 2024/05 EXT. WORK Design D022180 P.S. 754 SPED - BRONX BRONX 07 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022180 P.S. 754 SPED - BRONX BRONX 07 PARAPETS $4M OVER 2024/05 EXT. WORK Design D022023 P.S. 85 - BRONX BRONX 10 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $4M OVER 2024/04 PLAYGROUNDS Design D022244 P.S. 85 - BRONX BRONX 10 PATH OF TRAVEL- OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDELOPMENT $0 - $250K 2024/03 ACCESSIBILITY Design D021190 P.S. 91 - BRONX BRONX 10 RESO A PLAYGROUND UPGRADE $1M - $4M 2024/05 PLAYGROUNDS Design D022071 P.S. 91 - BRONX BRONX 10 ROOFS $4M OVER 2024/05 EXT. WORK Design D022071 P.S. 91 - BRONX BRONX 10 PARAPETS $4M OVER 2024/05 EXT. WORK Design D022071 P.S. 91 - BRONX BRONX 10 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022071 P.S. 91 - BRONX BRONX 10 WINDOWS $4M OVER 2024/05 EXT. WORK Design D021712 SCHOOL OF DIPLOMACY BRONX 11 AUDITORIUM UPGRADE $4M OVER 2024/01 AUDITORIUM UPGRADES Design D022020 SCHOOL OF DIPLOMACY BRONX 11 PATH OF TRAVEL AUDITORIUM UPGRADE $250K - $500K 2024/01 ACCESSIBILITY Design P026325 SCHOOL OF DIPLOMACY BRONX 11 RESO A SCIENCE LAB UPGRADE $1M - $4M 2024/01 SCIENCE LAB UPGRADES Design P026325 SCHOOL OF DIPLOMACY BRONX 11 PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE $1M - $4M 2024/01 ACCESSIBILITY Design D022231 THE URBAN ASSEMBLY BRONX ACADEMY OF LETTERS BRONX 07 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/04 WALK-IN REFRIGERATORS AND FREEZERS Design D022057 THE WALTON AVENUE SCHOOL BRONX 09 TCU REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/04 PLAYGROUNDS Design D022270 WILLIAMSBRIDGE NAACP EARLY CHILDHOOD EDUCATION CEN - BRONX BRONX 11 ACS EARLY LEARN-LEASE RENOVATION $0 - $250K 2024/06 LEASES Scope D022301 X012 SPED - BRONX BRONX 11 RESO A LIBRARY UPGRADE $500K - $750K 2024/07 LIBRARY UPGRADES Scope D022320 X168 SPED - BRONX BRONX 10 RESO A IPDVS CAMERA INSTALLATION $0 - $250K 2024/06 ELECTRICAL Scope D021042 X188 SPED - BRONX BRONX 07 IDA FLOOD ELIMINATION $1M - $4M 2024/01 EXT. WORK Design D021743 X721 SPED - BRONX BRONX 11 ROOF REPLACEMENT $1M - $4M 2024/07 EXT. WORK Scope D020782 200 CENTRAL AVENUE DAY CARE CENTER BROOKLYN 32 ACS EARLY LEARN LEASE RENEWAL $0 - $250K 2024/01 LEASES Design D022064 ABRAHAM LINCOLN HS - BROOKLYN BROOKLYN 21 ATHLETIC FIELD BLEACHERS C OF O $500K - $750K 2024/04 ADMIN/CODE COMP Design D022069 ACHIEVEMENT FIRST EAST NEW YORK CHARTER SCHOOL - K BROOKLYN 19 PERM FIX- EXTERIOR MASONRY @ K065 $4M OVER 2024/03 EXT. WORK Design D021756 BOYS & GIRLS HS - BROOKLYN BROOKLYN 16 GYM UPGRADE $1M - $4M 2024/02 GYMNASIUM Design D022055 BOYS & GIRLS HS - BROOKLYN BROOKLYN 16 PATH OF TRAVEL GYM UPGRADE $250K - $500K 2024/02 ACCESSIBILITY Design D022210 BROOKLYN ACADEMY HS - BROOKLYN BROOKLYN 13 WALK-IN REFRIGERATORS AND FREEZERS $750K - $1M 2024/04 WALK-IN REFRIGERATORS AND FREEZERS Design D022104 BROOKLYN GARDENS ELEMENTARY SCHOOL BROOKLYN 19 IPDVS INSTALLATION $0 - $250K 2024/05 ELECTRICAL Design D021759 BROOKLYN LAB SCHOOL - BROOKLYN BROOKLYN 19 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/06 BOILER ELECTRIFICATION Design D021759 BROOKLYN LAB SCHOOL - BROOKLYN BROOKLYN 19 LOW VOLTAGE ELECTRICAL SYSTEMS $4M OVER 2024/06 ELECTRICAL Design D021759 BROOKLYN LAB SCHOOL - BROOKLYN BROOKLYN 19 ELECTRICAL SERVICE UPGRADE $4M OVER 2024/06 ELECTRICAL Design D021850 BROOKLYN SCIENCE AND ENGINEERING ACADEMY BROOKLYN 18 RESO A GYMNASIUM UPGRADE $1M - $4M 2024/02 GYMNASIUM Design D022328 BROOKLYN SCIENCE AND ENGINEERING ACADEMY BROOKLYN 18 RESO A IPDVS CAMERA INSTALLATION $0 - $250K 2024/04 ELECTRICAL Design D021855 BROOKLYN THEATRE ARTS H.S. - K BROOKLYN 18 RESO A AUDITORIUM UPGRADE $750K - $1M 2024/05 AUDITORIUM UPGRADES Design P026400 CHRISTOPHER AVENUE COMMUNITY SCHOOL BROOKLYN 23 ROOFS $4M OVER 2024/01 EXT. WORK Design P026400 CHRISTOPHER AVENUE COMMUNITY SCHOOL BROOKLYN 23 PARAPETS $4M OVER 2024/01 EXT. WORK Design P026400 CHRISTOPHER AVENUE COMMUNITY SCHOOL BROOKLYN 23 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design P026400 CHRISTOPHER AVENUE COMMUNITY SCHOOL BROOKLYN 23 ROOF TOP UNIT $4M OVER 2024/01 BUILDING SYSTEMS Design P026400 CHRISTOPHER AVENUE COMMUNITY SCHOOL BROOKLYN 23 PAVED AREAS- CONCRETE $4M OVER 2024/01 SITE Design D021584 COBBLE HILL SCHL OF AMER. STUD-K BROOKLYN 15 ROOFS $4M OVER 2024/01 EXT. WORK Design D021584 COBBLE HILL SCHL OF AMER. STUD-K BROOKLYN 15 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021584 COBBLE HILL SCHL OF AMER. STUD-K BROOKLYN 15 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021584 COBBLE HILL SCHL OF AMER. STUD-K BROOKLYN 15 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D020672 CULT ACAD ARTS AND SCI - BROOKLYN BROOKLYN 18 RESO A- CULINARY ARTS KITCHEN $1M - $4M 2024/03 ROOM CONVERSIONS/UPGRADES Design D021970 CULT ACAD ARTS AND SCI - BROOKLYN BROOKLYN 18 PATH OF TRAVEL RESO A KITCHEN UPGRADE $500K - $750K 2024/02 ACCESSIBILITY Design D022099 EAST NEW YORK ELEMENTARY SCHOOL OF EXCELLENCE -K BROOKLYN 19 IPDVS INSTALLATION $250K - $500K 2024/05 ELECTRICAL Design D021038 EDWARD R. MURROW HS - K BROOKLYN 21 IDA FLOOD ELIMINATION $1M - $4M 2024/01 EXT. WORK Design D021038 EDWARD R. MURROW HS - K BROOKLYN 21 IDA GYM PARTITION REPLACEMENT $1M - $4M 2024/01 GYMNASIUM Design D019498 FORT HAMILTON HS - K BROOKLYN 20 REPLACE 6' FIRE DOMESTIC WATER MAIN VALVES $250K - $500K 2024/01 ELECTRICAL Design D021215 FORT HAMILTON HS - K BROOKLYN 20 IDA FLOOD ELIMINATION $4M OVER 2024/02 EXT. WORK Design D021215 FORT HAMILTON HS - K BROOKLYN 20 IDA HEATING PLANT UPGRADE $4M OVER 2024/02 BOILER/HEAT PUMP Design D021215 FORT HAMILTON HS - K BROOKLYN 20 IDA CLIMATE CONTROL $4M OVER 2024/02 BOILER/HEAT PUMP Design D021215 FORT HAMILTON HS - K BROOKLYN 20 NON-IDA CLIMATE CONTROL $4M OVER 2024/02 BOILER/HEAT PUMP Design D021215 FORT HAMILTON HS - K BROOKLYN 20 IDA INTERIOR SPACES $4M OVER 2024/02 INTERIOR Design D021215 FORT HAMILTON HS - K BROOKLYN 20 IDA POOL BOILER $4M OVER 2024/02 BOILER/HEAT PUMP Design D021215 FORT HAMILTON HS - K BROOKLYN 20 IDA ELECTRICAL SYSTEMS $4M OVER 2024/02 ELECTRICAL Design D021565 FRANKLIN D. ROOSEVELT HS - K BROOKLYN 20 ROOFS $4M OVER 2024/01 EXT. WORK Design D021565 FRANKLIN D. ROOSEVELT HS - K BROOKLYN 20 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021565 FRANKLIN D. ROOSEVELT HS - K BROOKLYN 20 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021565 FRANKLIN D. ROOSEVELT HS - K BROOKLYN 20 WINDOWS $4M OVER 2024/01 EXT. WORK Design D022013 HIGH SCHOOL FOR CIVIL RIGHTS - K BROOKLYN 19 FIELD HOUSE $4M OVER 2024/05 ATHLETIC FIELDS Design D022013 HIGH SCHOOL FOR CIVIL RIGHTS - K BROOKLYN 19 ATHLETIC FIELD $4M OVER 2024/05 ATHLETIC FIELDS Design D022340 HIGH SCHOOL FOR CIVIL RIGHTS - K BROOKLYN 19 EARLY DEMO PACKAGE $1M - $4M 2024/02 ATHLETIC FIELDS Design D022031 HS FOR MEDICAL PROFESSIONS - K BROOKLYN 18 RESO A SCIENCE LAB UPGRADE $750K - $1M 2024/01 SCIENCE LAB UPGRADES Design D022040 HS FOR MEDICAL PROFESSIONS - K BROOKLYN 18 PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE $0 - $250K 2024/01 ACCESSIBILITY Design D021738 I.S. 162 - BROOKLYN BROOKLYN 32 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/03 ACCESSIBILITY Design D022240 I.S. 201 - BROOKLYN BROOKLYN 20 GYM FLOOR REPLACEMENT $1M - $4M 2024/05 GYMNASIUM Design D022267 I.S. 218 - BROOKLYN BROOKLYN 19 EXTERIOR MASONRY $500K - $750K 2024/04 EXT. WORK Design D022082 I.S. 228 - BROOKLYN BROOKLYN 21 ROOFS $4M OVER 2024/06 EXT. WORK Design D022082 I.S. 228 - BROOKLYN BROOKLYN 21 PARAPETS $4M OVER 2024/06 EXT. WORK Design D022082 I.S. 228 - BROOKLYN BROOKLYN 21 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D022082 I.S. 228 - BROOKLYN BROOKLYN 21 FLOOD ELIMINATION $4M OVER 2024/06 EXT. WORK Design D022082 I.S. 228 - BROOKLYN BROOKLYN 21 WINDOWS $4M OVER 2024/06 EXT. WORK Design P026387 I.S. 246 - BROOKLYN BROOKLYN 17 RESO A LIBRARY UPGRADE $500K - $750K 2024/01 LIBRARY UPGRADES Design P026387 I.S. 246 - BROOKLYN BROOKLYN 17 PATH OF TRAVEL RESO A LIBRARY UPGRADE $500K - $750K 2024/01 ACCESSIBILITY Design P026406 I.S. 259 - BROOKLYN BROOKLYN 20 RESO A SCIENCE LAB UPGRADE $1M - $4M 2024/01 SCIENCE LAB UPGRADES Design P026406 I.S. 259 - BROOKLYN BROOKLYN 20 PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE $1M - $4M 2024/01 ACCESSIBILITY Design D022209 I.S. 267 - BROOKLYN BROOKLYN 16 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D021624 I.S. 281 - BROOKLYN BROOKLYN 21 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D021624 I.S. 281 - BROOKLYN BROOKLYN 21 WINDOWS $4M OVER 2024/03 EXT. WORK Design D021624 I.S. 281 - BROOKLYN BROOKLYN 21 ROOFS $4M OVER 2024/03 EXT. WORK Design D020169 I.S. 285 - BROOKLYN BROOKLYN 18 RESO A SCIENCE LAB UPGRADES $1M - $4M 2024/03 SCIENCE LAB UPGRADES Design D020170 I.S. 285 - BROOKLYN BROOKLYN 18 RESO A PATH OF TRAVEL SCIENCE LAB UPGRADES $0 - $250K 2024/02 ACCESSIBILITY Design D021062 I.S. 291 - BROOKLYN BROOKLYN 32 IDA FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D021062 I.S. 291 - BROOKLYN BROOKLYN 32 IDA INTERIOR SPACES $4M OVER 2024/01 INTERIOR Design D021639 I.S. 291 - BROOKLYN BROOKLYN 32 PATH OF TRAVEL NON-IDA FLOOD ELIMINATION $0 - $250K 2024/01 ACCESSIBILITY Design D022189 I.S. 292 - BROOKLYN BROOKLYN 19 ROOFS $4M OVER 2024/04 EXT. WORK Design D022189 I.S. 292 - BROOKLYN BROOKLYN 19 EXTERIOR MASONRY $4M OVER 2024/04 EXT. WORK Design D021860 I.S. 30 - BROOKLYN BROOKLYN 20 RESO A LIBRARY UPGRADE $250K - $500K 2024/04 LIBRARY UPGRADES Design D019438 I.S. 340 - BROOKLYN BROOKLYN 13 LOW VOLTAGE ELECTRICAL SYSTEMS $750K - $1M 2024/01 ELECTRICAL Design D022186 I.S. 349 - BROOKLYN BROOKLYN 32 ROOFS $4M OVER 2024/05 EXT. WORK Design D022186 I.S. 349 - BROOKLYN BROOKLYN 32 WINDOWS $4M OVER 2024/05 EXT. WORK Design D022186 I.S. 349 - BROOKLYN BROOKLYN 32 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D018437 I.S. 351 - BROOKLYN BROOKLYN 13 RESO A COURTYARD GREENHOUSE $1M - $4M 2024/01 SCIENCE LAB UPGRADES Design D020638 I.S. 382 - BROOKLYN BROOKLYN 17 PARAPET AND SIDE OF BUILDING DAMAGE @ K465 $4M OVER 2024/01 EXT. WORK Design D020638 I.S. 382 - BROOKLYN BROOKLYN 17 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D020638 I.S. 382 - BROOKLYN BROOKLYN 17 ROOFS $4M OVER 2024/01 EXT. WORK Design D020638 I.S. 382 - BROOKLYN BROOKLYN 17 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D020638 I.S. 382 - BROOKLYN BROOKLYN 17 WINDOWS $4M OVER 2024/01 EXT. WORK Design D022091 I.S. 394 - BROOKLYN BROOKLYN 17 ROOFS $4M OVER 2024/06 EXT. WORK Design D022091 I.S. 394 - BROOKLYN BROOKLYN 17 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D022091 I.S. 394 - BROOKLYN BROOKLYN 17 WINDOWS $4M OVER 2024/06 EXT. WORK Design D022091 I.S. 394 - BROOKLYN BROOKLYN 17 FLOOD ELIMINATION $4M OVER 2024/06 EXT. WORK Design D022091 I.S. 394 - BROOKLYN BROOKLYN 17 PARAPETS $4M OVER 2024/06 EXT. WORK Design P026401 I.S. 452 BROOKLYN 19 RESO A LIBRARY UPGRADE $750K - $1M 2024/01 LIBRARY UPGRADES Design P026401 I.S. 452 BROOKLYN 19 PATH OF TRAVEL RESO A LIBRARY UPGRADE $750K - $1M 2024/01 ACCESSIBILITY Design D021863 I.S. 518 - BROOKLYN BROOKLYN 23 RESO A AUDITORIUM UPGRADE $250K - $500K 2024/01 AUDITORIUM UPGRADES Design P026407 I.S. 577 - BROOKLYN BROOKLYN 14 IPDVS INSTALLATION $250K - $500K 2024/01 ELECTRICAL Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 ROOFS $4M OVER 2024/03 EXT. WORK Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 PARAPETS $4M OVER 2024/03 EXT. WORK Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 WINDOWS $4M OVER 2024/03 EXT. WORK Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 DOORS $4M OVER 2024/03 SCHOOL SAFETY Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 SIDEWALK ELEVATOR $4M OVER 2024/03 BUILDING SYSTEMS Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 HVAC UPGRADE FOR CLASSROOMS AND PA SPACES $4M OVER 2024/03 BUILDING SYSTEMS Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 ELECTRICAL UPGRADE $4M OVER 2024/03 ELECTRICAL Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 HOT WATER HEATERS $4M OVER 2024/03 BOILER/HEAT PUMP Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2024/03 ELECTRICAL Design D022222 I.S. 71 - BROOKLYN BROOKLYN 14 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D022171 I.S. 722 - BROOKLYN BROOKLYN 17 CHILLER REPLACEMENT @ K391 $1M - $4M 2024/04 BUILDING SYSTEMS Design D022171 I.S. 722 - BROOKLYN BROOKLYN 17 FIRE ALARM SYSTEM $1M - $4M 2024/04 ELECTRICAL Design D021248 I.S. 78 - BROOKLYN BROOKLYN 22 PLANYC CLIMATE CONTROL $4M OVER 2024/01 BOILER/HEAT PUMP Design D021248 I.S. 78 - BROOKLYN BROOKLYN 22 PLANYC BOILER CONVERSION $4M OVER 2024/01 BOILER/HEAT PUMP Design D021248 I.S. 78 - BROOKLYN BROOKLYN 22 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2024/01 ELECTRICAL Design D022264 IT TAKES A VILLAGE ACADEMY - K BROOKLYN 18 FIRE ALARM SYSTEM REPLACEMENT $1M - $4M 2024/03 ELECTRICAL Design P026256 IT TAKES A VILLAGE ACADEMY - K BROOKLYN 18 CAFETERIA UPGRADE $4M OVER 2024/01 ROOM CONVERSIONS/UPGRADES Design P026256 IT TAKES A VILLAGE ACADEMY - K BROOKLYN 18 PATH OF TRAVEL CAFETERIA UPGRADE $4M OVER 2024/01 ACCESSIBILITY Design D022187 J.H.S. 126 - BROOKLYN BROOKLYN 14 ROOFS $4M OVER 2024/05 EXT. WORK Design D022187 J.H.S. 126 - BROOKLYN BROOKLYN 14 FLOOD ELIMINATION $4M OVER 2024/05 EXT. WORK Design D022187 J.H.S. 126 - BROOKLYN BROOKLYN 14 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D021897 J.H.S. 50 - BROOKLYN BROOKLYN 14 REINFORCING SUPPORT ELEMENTS $1M - $4M 2024/01 BUILDING SYSTEMS Design D021442 JAMES MADISON HS - BROOKLYN BROOKLYN 22 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D021442 JAMES MADISON HS - BROOKLYN BROOKLYN 22 PARAPETS $4M OVER 2024/06 EXT. WORK Design D021442 JAMES MADISON HS - BROOKLYN BROOKLYN 22 ROOFS $4M OVER 2024/06 EXT. WORK Design D021442 JAMES MADISON HS - BROOKLYN BROOKLYN 22 WINDOWS $4M OVER 2024/06 EXT. WORK Design D021706 K036 SPED - BROOKLYN BROOKLYN 19 ELEVATOR MODERNIZATION $1M - $4M 2024/03 BUILDING SYSTEMS Design D021706 K036 SPED - BROOKLYN BROOKLYN 19 FIRE ALARM SYSTEM REPLACEMENT $1M - $4M 2024/03 ELECTRICAL Design D021706 K036 SPED - BROOKLYN BROOKLYN 19 ELECTRICAL SYSTEMS $1M - $4M 2024/03 ELECTRICAL Design D022188 K140 SPED - BROOKLYN BROOKLYN 13 ROOFS $4M OVER 2024/05 EXT. WORK Design D022188 K140 SPED - BROOKLYN BROOKLYN 13 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022047 K372 SPED - BROOKLYN BROOKLYN 15 PLAYGROUND UPGRADE $500K - $750K 2024/02 PLAYGROUNDS Design D022369 K372 SPED - BROOKLYN BROOKLYN 15 PATH OF TRAVEL PLAYGROUND UPGRADE $0 - $250K 2024/07 ACCESSIBILITY Scope D021012 K753 SPED - BROOKLYN BROOKLYN 13 FULL PROGRAM ACCESSIBILITY $1M - $4M 2024/01 ACCESSIBILITY Design D021570 K753 SPED - BROOKLYN BROOKLYN 13 ROOFS $4M OVER 2024/01 EXT. WORK Design D021570 K753 SPED - BROOKLYN BROOKLYN 13 PARAPETS $4M OVER 2024/01 EXT. WORK Design D019802 K811 SPED - BROOKLYN BROOKLYN 22 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/03 ACCESSIBILITY Design D019802 K811 SPED - BROOKLYN BROOKLYN 22 LOW VOLTAGE ELECTRICAL SYSTEM $4M OVER 2024/03 ELECTRICAL Design D020898 LEADERS HIGH SCHOOL - K BROOKLYN 21 PATH OF TRAVEL RESO A LIBRARY UPGRADE $750K - $1M 2024/01 ACCESSIBILITY Design D020898 LEADERS HIGH SCHOOL - K BROOKLYN 21 RESO A LIBRARY UPGRADE $750K - $1M 2024/01 LIBRARY UPGRADES Design D021739 LIBERTY AVENUE MIDDLE SCHOOL BROOKLYN 19 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/03 ACCESSIBILITY Design D021739 LIBERTY AVENUE MIDDLE SCHOOL BROOKLYN 19 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2024/03 ELECTRICAL Design D022223 LIBERTY AVENUE MIDDLE SCHOOL BROOKLYN 19 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2024/04 WALK-IN REFRIGERATORS AND FREEZERS Design D020776 LOVE IN ACTION DAY CARE BROOKLYN 23 ACS EARLY LEARN LEASE RENEWAL $250K - $500K 2024/05 LEASES Design D021305 MIDWOOD HS - BROOKLYN BROOKLYN 21 IDA FLOOD ELIMINATION $1M - $4M 2024/01 ATHLETIC FIELDS Design D021305 MIDWOOD HS - BROOKLYN BROOKLYN 21 IDA PAVED AREAS- BLACKTOP $1M - $4M 2024/01 SITE Design D021305 MIDWOOD HS - BROOKLYN BROOKLYN 21 IDA HEATING PLANT UPGRADE $1M - $4M 2024/01 BOILER/HEAT PUMP Design D021659 MOSDOTH DAY CARE CENTER, INC. BROOKLYN 17 ACS EARLY LEARN RENEWAL $250K - $500K 2024/06 LEASES Design D021503 P.S. 1 - BROOKLYN BROOKLYN 15 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/01 ACCESSIBILITY Design D021503 P.S. 1 - BROOKLYN BROOKLYN 15 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2024/01 ELECTRICAL Design D021552 P.S. 1 - BROOKLYN BROOKLYN 15 ROOFS $1M - $4M 2024/01 EXT. WORK Design D021552 P.S. 1 - BROOKLYN BROOKLYN 15 PARAPETS $1M - $4M 2024/01 EXT. WORK Design D021552 P.S. 1 - BROOKLYN BROOKLYN 15 EXTERIOR MASONRY $1M - $4M 2024/01 EXT. WORK Design D021861 P.S. 104 - BROOKLYN BROOKLYN 20 RESO A OUTDOOR STEM CENTER $500K - $750K 2024/07 PLAYGROUNDS Scope D022201 P.S. 106 - BROOKLYN BROOKLYN 32 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022201 P.S. 106 - BROOKLYN BROOKLYN 32 FLOOD ELIMINATION $4M OVER 2024/05 EXT. WORK Design D022201 P.S. 106 - BROOKLYN BROOKLYN 32 ROOFS $4M OVER 2024/05 EXT. WORK Design D021811 P.S. 107 - BROOKLYN BROOKLYN 15 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/02 PLAYGROUNDS Design D021822 P.S. 115 - BROOKLYN BROOKLYN 18 RESO A LIBRARY UPGRADE $500K - $750K 2024/02 LIBRARY UPGRADES Design D021553 P.S. 12 - BROOKLYN BROOKLYN 23 ROOFS $4M OVER 2024/06 EXT. WORK Design D021553 P.S. 12 - BROOKLYN BROOKLYN 23 PARAPETS $4M OVER 2024/06 EXT. WORK Design D021553 P.S. 12 - BROOKLYN BROOKLYN 23 WINDOWS $4M OVER 2024/06 EXT. WORK Design D021553 P.S. 12 - BROOKLYN BROOKLYN 23 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D021553 P.S. 12 - BROOKLYN BROOKLYN 23 FENCING $4M OVER 2024/06 SITE Design D022206 P.S. 12 - BROOKLYN BROOKLYN 23 WALK-IN REFRIGERATORS AND FREEZERS $750K - $1M 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D020536 P.S. 120 - BROOKLYN BROOKLYN 14 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/01 ACCESSIBILITY Design D020536 P.S. 120 - BROOKLYN BROOKLYN 14 LOW VOLTAGE ELECTRICAL SYSTEM $4M OVER 2024/01 ELECTRICAL Design D021530 P.S. 120 - BROOKLYN BROOKLYN 14 ROOFS $4M OVER 2024/01 EXT. WORK Design D021530 P.S. 120 - BROOKLYN BROOKLYN 14 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021530 P.S. 120 - BROOKLYN BROOKLYN 14 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D022074 P.S. 139 - BROOKLYN BROOKLYN 22 EXTERIOR MASONRY $250K - $500K 2024/03 EXT. WORK Design P026399 P.S. 139 - BROOKLYN BROOKLYN 22 RESO A AUDITORIUM UPGRADE $750K - $1M 2024/01 AUDITORIUM UPGRADES Design P026399 P.S. 139 - BROOKLYN BROOKLYN 22 PATH OF TRAVEL RESO A AUDITORIUM UPGRADE $750K - $1M 2024/01 ACCESSIBILITY Design D022331 P.S. 145 - BROOKLYN BROOKLYN 32 RESO A PA SYSTEM UPGRADE $0 - $250K 2024/06 ELECTRICAL Scope P026384 P.S. 145 - BROOKLYN BROOKLYN 32 IPDVS CAMERA INSTALLATION $250K - $500K 2024/01 ELECTRICAL Design D021275 P.S. 15 - BROOKLYN BROOKLYN 15 RESO A PLAYGROUND UPGRADE $1M - $4M 2024/05 PLAYGROUNDS Design P026381 P.S. 15 - BROOKLYN BROOKLYN 15 IPDVS CAMERA INSTALLATION $250K - $500K 2024/01 ELECTRICAL Design P026384 P.S. 151 - BROOKLYN BROOKLYN 32 IPDVS CAMERA INSTALLATION $250K - $500K 2024/01 ELECTRICAL Design D022087 P.S. 156 - BROOKLYN BROOKLYN 23 ROOFS $4M OVER 2024/05 EXT. WORK Design D022087 P.S. 156 - BROOKLYN BROOKLYN 23 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D019420 P.S. 157 - BROOKLYN BROOKLYN 14 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D019420 P.S. 157 - BROOKLYN BROOKLYN 14 PARAPETS $4M OVER 2024/01 EXT. WORK Design D019420 P.S. 157 - BROOKLYN BROOKLYN 14 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D019420 P.S. 157 - BROOKLYN BROOKLYN 14 ROOFS $4M OVER 2024/01 EXT. WORK Design D022208 P.S. 157 - BROOKLYN BROOKLYN 14 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D018658 P.S. 169 - BROOKLYN BROOKLYN 15 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/03 ACCESSIBILITY Design D018658 P.S. 169 - BROOKLYN BROOKLYN 15 LOW VOLTAGE ELECTRICAL SYSTEM $4M OVER 2024/03 ELECTRICAL Design D020186 P.S. 169 - BROOKLYN BROOKLYN 15 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/03 PLAYGROUNDS Design D021554 P.S. 18 - BROOKLYN BROOKLYN 14 ROOFS $4M OVER 2024/03 EXT. WORK Design D021554 P.S. 18 - BROOKLYN BROOKLYN 14 PARAPETS $4M OVER 2024/03 EXT. WORK Design D021554 P.S. 18 - BROOKLYN BROOKLYN 14 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D021554 P.S. 18 - BROOKLYN BROOKLYN 14 PLAYGROUND UPGRADE $4M OVER 2024/03 PLAYGROUNDS Design D022512 P.S. 18 - BROOKLYN BROOKLYN 14 PATH OF TRAVEL PLAYGROUND UPGRADE $0 - $250K 2024/04 ACCESSIBILITY Design D021902 P.S. 185 - BROOKLYN BROOKLYN 20 CLASSROOM FLOORING $1M - $4M 2024/04 FLOORS Design D022362 P.S. 185 - BROOKLYN BROOKLYN 20 PATH OF TRAVEL CLASSROOM FLOORING $0 - $250K 2024/04 ACCESSIBILITY Design D022106 P.S. 190 - BROOKLYN BROOKLYN 19 IPDVS INSTALLATION $250K - $500K 2024/03 ELECTRICAL Design D021911 P.S. 191 - BROOKLYN BROOKLYN 17 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/06 BOILER ELECTRIFICATION Design D021911 P.S. 191 - BROOKLYN BROOKLYN 17 WINDOWS $4M OVER 2024/06 EXT. WORK Design D021911 P.S. 191 - BROOKLYN BROOKLYN 17 ELECTRICAL SERVICE UPGRADE $4M OVER 2024/06 ELECTRICAL Design D021911 P.S. 191 - BROOKLYN BROOKLYN 17 FIRE ALARM $4M OVER 2024/06 ELECTRICAL Design D020630 P.S. 193 - BROOKLYN BROOKLYN 22 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/01 ACCESSIBILITY Design D020630 P.S. 193 - BROOKLYN BROOKLYN 22 LOW VOLTAGE ELECTRICAL SYSTEM $4M OVER 2024/01 ELECTRICAL Design D021559 P.S. 193 - BROOKLYN BROOKLYN 22 PARAPETS $4M OVER 2024/03 EXT. WORK Design D021559 P.S. 193 - BROOKLYN BROOKLYN 22 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D021559 P.S. 193 - BROOKLYN BROOKLYN 22 ROOFS $4M OVER 2024/03 EXT. WORK Design D021560 P.S. 199 - BROOKLYN BROOKLYN 21 ROOFS $4M OVER 2024/06 EXT. WORK Design D021560 P.S. 199 - BROOKLYN BROOKLYN 21 PARAPETS $4M OVER 2024/06 EXT. WORK Design D021560 P.S. 199 - BROOKLYN BROOKLYN 21 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D021560 P.S. 199 - BROOKLYN BROOKLYN 21 WINDOWS $4M OVER 2024/06 EXT. WORK Design D021221 P.S. 20 - BROOKLYN BROOKLYN 13 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/02 ACCESSIBILITY Design D021221 P.S. 20 - BROOKLYN BROOKLYN 13 PLAYGROUND RENOVATION $4M OVER 2024/02 PLAYGROUNDS Design D021221 P.S. 20 - BROOKLYN BROOKLYN 13 FIRE ALARM SYSTEM $4M OVER 2024/02 ELECTRICAL Design D021567 P.S. 20 - BROOKLYN BROOKLYN 13 ROOFS $4M OVER 2024/01 EXT. WORK Design D021567 P.S. 20 - BROOKLYN BROOKLYN 13 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021567 P.S. 20 - BROOKLYN BROOKLYN 13 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D022276 P.S. 20 - BROOKLYN BROOKLYN 13 RESO A GREEN ROOF $4M OVER 2024/07 EXT. WORK Scope D021758 P.S. 209 - BROOKLYN BROOKLYN 21 TCU REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/01 PLAYGROUNDS Design D021561 P.S. 221 - BROOKLYN BROOKLYN 17 ROOFS $4M OVER 2024/03 EXT. WORK Design D021561 P.S. 221 - BROOKLYN BROOKLYN 17 PARAPETS $4M OVER 2024/03 EXT. WORK Design D021561 P.S. 221 - BROOKLYN BROOKLYN 17 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D021561 P.S. 221 - BROOKLYN BROOKLYN 17 FLOOD ELIMINATION $4M OVER 2024/03 EXT. WORK Design D020924 P.S. 222 - BROOKLYN BROOKLYN 22 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/02 PLAYGROUNDS Design D019402 P.S. 224 - BROOKLYN BROOKLYN 19 EXTERIOR MASONRY $4M OVER 2024/02 EXT. WORK Design D019402 P.S. 224 - BROOKLYN BROOKLYN 19 PARAPETS $4M OVER 2024/02 EXT. WORK Design D019402 P.S. 224 - BROOKLYN BROOKLYN 19 FLOOD ELIMINATION $4M OVER 2024/02 EXT. WORK Design D019402 P.S. 224 - BROOKLYN BROOKLYN 19 ROOFS $4M OVER 2024/02 EXT. WORK Design D019402 P.S. 224 - BROOKLYN BROOKLYN 19 AIR CONDENSING UNIT $4M OVER 2024/02 BUILDING SYSTEMS Design D021818 P.S. 229 - BROOKLYN BROOKLYN 20 RESO A LIBRARY UPGRADE $500K - $750K 2024/01 LIBRARY UPGRADES Design D019244 P.S. 235 - BROOKLYN BROOKLYN 18 REPLACE (3) ROOF TOP UNITS $1M - $4M 2024/01 BUILDING SYSTEMS Design D019244 P.S. 235 - BROOKLYN BROOKLYN 18 ROOFS $1M - $4M 2024/01 EXT. WORK Design D021876 P.S. 24 - BROOKLYN BROOKLYN 15 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/07 PLAYGROUNDS Scope P026381 P.S. 24 - BROOKLYN BROOKLYN 15 IPDVS CAMERA INSTALLATION $250K - $500K 2024/01 ELECTRICAL Design D022261 P.S. 243 - BROOKLYN BROOKLYN 16 TERRACOTTA PANEL REPLACEMENT $1M - $4M 2024/04 EXT. WORK Design P026389 P.S. 251 - BROOKLYN BROOKLYN 22 RESO A (MA) LIBRARY UPGRADE $500K - $750K 2024/01 LIBRARY UPGRADES Design P026389 P.S. 251 - BROOKLYN BROOKLYN 22 PATH OF TRAVEL RESO A LIBRARY UPGRADE $500K - $750K 2024/01 ACCESSIBILITY Design D020446 P.S. 253 - BROOKLYN BROOKLYN 21 EXISTING BUILDING RENOVATION WORK $1M - $4M 2024/04 MISCELLANEOUS Design D021747 P.S. 256 - BROOKLYN BROOKLYN 13 PARAPETS $4M OVER 2024/05 EXT. WORK Design D021747 P.S. 256 - BROOKLYN BROOKLYN 13 ROOFS $4M OVER 2024/05 EXT. WORK Design D021747 P.S. 256 - BROOKLYN BROOKLYN 13 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D021740 P.S. 257 - BROOKLYN BROOKLYN 14 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/02 ACCESSIBILITY Design D021740 P.S. 257 - BROOKLYN BROOKLYN 14 LOW VOLTAGE ELECTRICAL SYSTEMS $4M OVER 2024/02 ELECTRICAL Design D022090 P.S. 257 - BROOKLYN BROOKLYN 14 ROOFS $4M OVER 2024/06 EXT. WORK Design D022090 P.S. 257 - BROOKLYN BROOKLYN 14 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design P026402 P.S. 257 - BROOKLYN BROOKLYN 14 IPDVS CAMERA INSTALLATION $250K - $500K 2024/01 ELECTRICAL Design D018694 P.S. 261 - BROOKLYN BROOKLYN 15 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D018694 P.S. 261 - BROOKLYN BROOKLYN 15 PARAPETS $4M OVER 2024/01 EXT. WORK Design D018694 P.S. 261 - BROOKLYN BROOKLYN 15 ROOFS $4M OVER 2024/01 EXT. WORK Design D018694 P.S. 261 - BROOKLYN BROOKLYN 15 PLAYGROUND REDEVELOPMENT $4M OVER 2024/01 PLAYGROUNDS Design D021685 P.S. 261 - BROOKLYN BROOKLYN 15 TCU REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/02 PLAYGROUNDS Design D021744 P.S. 261 - BROOKLYN BROOKLYN 15 PATH OF TRAVEL TCU REMOVAL/PLAYGROUND REDEVELOPMENT $0 - $250K 2024/02 ACCESSIBILITY Design D021814 P.S. 262 - BROOKLYN BROOKLYN 16 RESO A PLAYGROUND UPGRADE $1M - $4M 2024/04 PLAYGROUNDS Design D021982 P.S. 262 - BROOKLYN BROOKLYN 16 PATH OF TRAVEL RESO A PLAYGROUND UPGRADE $250K - $500K 2024/05 ACCESSIBILITY Design D021849 P.S. 264 - BROOKLYN BROOKLYN 20 RESO A AUDITORIUM UPGRADE $250K - $500K 2024/01 AUDITORIUM UPGRADES Design P026386 P.S. 272 - BROOKLYN BROOKLYN 18 RESO A MULTIMEDIA CENTER $500K - $750K 2024/01 LIBRARY UPGRADES Design P026386 P.S. 272 - BROOKLYN BROOKLYN 18 PATH OF TRAVEL RESO A MULTIMEDIA CENTER $500K - $750K 2024/01 ACCESSIBILITY Design D017767 P.S. 284 - BROOKLYN BROOKLYN 23 SWIMMING POOL $4M OVER 2024/03 MISCELLANEOUS Design D020190 P.S. 284 - BROOKLYN BROOKLYN 23 RESO A PATH OF TRAVEL PLAYGROUND UPGRADE $0 - $250K 2024/01 ACCESSIBILITY Design D020192 P.S. 284 - BROOKLYN BROOKLYN 23 RESO A PLAYGROUND UPGRADE $250K - $500K 2024/01 PLAYGROUNDS Design D021524 P.S. 284 - BROOKLYN BROOKLYN 23 ROOFS $4M OVER 2024/01 EXT. WORK Design D021524 P.S. 284 - BROOKLYN BROOKLYN 23 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021524 P.S. 284 - BROOKLYN BROOKLYN 23 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021524 P.S. 284 - BROOKLYN BROOKLYN 23 WINDOWS $4M OVER 2024/01 EXT. WORK Design D021524 P.S. 284 - BROOKLYN BROOKLYN 23 EXTERIOR DOORS $4M OVER 2024/01 SCHOOL SAFETY Design D021524 P.S. 284 - BROOKLYN BROOKLYN 23 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D022060 P.S. 284 - BROOKLYN BROOKLYN 23 PATH OF TRAVEL SWIMMING POOL $0 - $250K 2024/03 ACCESSIBILITY Design D021504 P.S. 29 - BROOKLYN BROOKLYN 15 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/01 ACCESSIBILITY Design D021504 P.S. 29 - BROOKLYN BROOKLYN 15 LOW VOLTAGE ELECTRICAL SYSTEMS $4M OVER 2024/01 ELECTRICAL Design P026402 P.S. 297 - BROOKLYN BROOKLYN 14 IPDVS CAMERA INSTALLATION $250K - $500K 2024/01 ELECTRICAL Design D021710 P.S. 308 - BROOKLYN BROOKLYN 16 PLAYGROUND UPGRADE $1M - $4M 2024/02 PLAYGROUNDS Design D019397 P.S. 31 - BROOKLYN BROOKLYN 14 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/01 ACCESSIBILITY Design D021824 P.S. 312 - BROOKLYN BROOKLYN 22 RESO A LIBRARY UPGRADE $1M - $4M 2024/02 LIBRARY UPGRADES Design D021714 P.S. 315 - BROOKLYN BROOKLYN 22 HVAC UPGRADE $4M OVER 2024/05 BOILER/HEAT PUMP Design D021714 P.S. 315 - BROOKLYN BROOKLYN 22 BMS UPGRADE $4M OVER 2024/05 BOILER/HEAT PUMP Design D022181 P.S. 315 - BROOKLYN BROOKLYN 22 ROOFS $4M OVER 2024/06 EXT. WORK Design D022181 P.S. 315 - BROOKLYN BROOKLYN 22 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D022181 P.S. 315 - BROOKLYN BROOKLYN 22 WINDOWS $4M OVER 2024/06 EXT. WORK Design D022181 P.S. 315 - BROOKLYN BROOKLYN 22 PARAPETS $4M OVER 2024/06 EXT. WORK Design D022181 P.S. 315 - BROOKLYN BROOKLYN 22 FLOOD ELIMINATION $4M OVER 2024/06 EXT. WORK Design D022181 P.S. 315 - BROOKLYN BROOKLYN 22 PAVED AREA- CONCRETE $4M OVER 2024/06 SITE Design D021823 P.S. 316 - BROOKLYN BROOKLYN 17 RESO A AUDITORIUM UPGRADE $250K - $500K 2024/03 AUDITORIUM UPGRADES Design D022190 P.S. 327 - BROOKLYN BROOKLYN 23 ROOFS $4M OVER 2024/03 EXT. WORK Design D022190 P.S. 327 - BROOKLYN BROOKLYN 23 PARAPETS $4M OVER 2024/03 EXT. WORK Design D022190 P.S. 327 - BROOKLYN BROOKLYN 23 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D021562 P.S. 329 - BROOKLYN BROOKLYN 21 ROOFS $4M OVER 2024/01 EXT. WORK Design D021562 P.S. 329 - BROOKLYN BROOKLYN 21 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021562 P.S. 329 - BROOKLYN BROOKLYN 21 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design P026407 P.S. 346 - BROOKLYN BROOKLYN 19 IPDVS INSTALLATION $250K - $500K 2024/01 ELECTRICAL Design D022163 P.S. 375 - BROOKLYN BROOKLYN 17 ROOFS $4M OVER 2024/04 EXT. WORK Design D022163 P.S. 375 - BROOKLYN BROOKLYN 17 PARAPETS $4M OVER 2024/04 EXT. WORK Design D022163 P.S. 375 - BROOKLYN BROOKLYN 17 EXTERIOR MASONRY $4M OVER 2024/04 EXT. WORK Design D022163 P.S. 375 - BROOKLYN BROOKLYN 17 FLOOD ELIMINATION $4M OVER 2024/04 EXT. WORK Design D019250 P.S. 384 - BROOKLYN BROOKLYN 32 ROOF REPLACEMENT $4M OVER 2024/01 EXT. WORK Design D019250 P.S. 384 - BROOKLYN BROOKLYN 32 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D019250 P.S. 384 - BROOKLYN BROOKLYN 32 PARAPETS $4M OVER 2024/01 EXT. WORK Design D022315 P.S. 39 - BROOKLYN BROOKLYN 15 RESO A ELECTRICAL UPGRADE $0 - $250K 2024/06 ELECTRICAL Scope D020535 P.S. 45 - BROOKLYN BROOKLYN 32 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/01 ACCESSIBILITY Design D020761 P.S. 45 - BROOKLYN BROOKLYN 32 ROOFS $4M OVER 2024/01 EXT. WORK Design D020761 P.S. 45 - BROOKLYN BROOKLYN 32 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D020761 P.S. 45 - BROOKLYN BROOKLYN 32 ROOFTOP EXHAUST FAN REPLACEMENT $4M OVER 2024/01 BUILDING SYSTEMS Design D021753 P.S. 503 - BROOKLYN BROOKLYN 20 CHILLER REPLACEMENT $4M OVER 2024/01 BUILDING SYSTEMS Design D021753 P.S. 503 - BROOKLYN BROOKLYN 20 AHU REPLACEMENT $4M OVER 2024/01 BUILDING SYSTEMS Design D021753 P.S. 503 - BROOKLYN BROOKLYN 20 BMS UPGRADE $4M OVER 2024/01 BOILER/HEAT PUMP Design D019398 P.S. 54 - BROOKLYN BROOKLYN 13 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/01 ACCESSIBILITY Design D019398 P.S. 54 - BROOKLYN BROOKLYN 13 FIRE ALARM REPLACEMENT $4M OVER 2024/01 ELECTRICAL Design D021566 P.S. 54 - BROOKLYN BROOKLYN 13 ROOFS $4M OVER 2024/04 EXT. WORK Design D021566 P.S. 54 - BROOKLYN BROOKLYN 13 PARAPETS $4M OVER 2024/04 EXT. WORK Design D021566 P.S. 54 - BROOKLYN BROOKLYN 13 EXTERIOR MASONRY $4M OVER 2024/04 EXT. WORK Design D021846 P.S. 6 - BROOKLYN BROOKLYN 17 RESO A AUDITORIUM UPGRADE $250K - $500K 2024/01 AUDITORIUM UPGRADES Design D021515 P.S. 67 - BROOKLYN BROOKLYN 13 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/03 ACCESSIBILITY Design D021515 P.S. 67 - BROOKLYN BROOKLYN 13 PA SYSTEM REPLACEMENT $4M OVER 2024/03 ELECTRICAL Design D022207 P.S. 705 - BROOKLYN BROOKLYN 17 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D021827 P.S. 748 - BROOKLYN BROOKLYN 20 RESO A ELECTRICAL UPGRADE $0 - $250K 2024/03 ELECTRICAL Design D022170 P.S. 748 - BROOKLYN BROOKLYN 20 EXTERIOR MASONRY $1M - $4M 2024/03 EXT. WORK Design D022170 P.S. 748 - BROOKLYN BROOKLYN 20 PARAPETS $1M - $4M 2024/03 EXT. WORK Design D021821 P.S. 8 - BROOKLYN BROOKLYN 13 RESO A PLAYGROUND UPGRADE $250K - $500K 2024/02 PLAYGROUNDS Design D021568 P.S. 81 - BROOKLYN BROOKLYN 16 ROOFS $4M OVER 2024/03 EXT. WORK Design D021568 P.S. 81 - BROOKLYN BROOKLYN 16 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D021568 P.S. 81 - BROOKLYN BROOKLYN 16 FLOOD ELIMINATION $4M OVER 2024/03 EXT. WORK Design D020645 P.S. 84 - BROOKLYN BROOKLYN 14 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/01 ACCESSIBILITY Design D021556 P.S. 86 - BROOKLYN BROOKLYN 32 ROOFS $1M - $4M 2024/01 EXT. WORK Design D021556 P.S. 86 - BROOKLYN BROOKLYN 32 EXTERIOR MASONRY $1M - $4M 2024/01 EXT. WORK Design D021556 P.S. 86 - BROOKLYN BROOKLYN 32 FLOOD ELIMINATION $1M - $4M 2024/01 EXT. WORK Design D020806 P.S. 90 - BROOKLYN BROOKLYN 21 FLOOD ELIMINATION $4M OVER 2024/03 EXT. WORK Design D020806 P.S. 90 - BROOKLYN BROOKLYN 21 ROOFS $4M OVER 2024/03 EXT. WORK Design D020806 P.S. 90 - BROOKLYN BROOKLYN 21 PARAPETS $4M OVER 2024/03 EXT. WORK Design D020806 P.S. 90 - BROOKLYN BROOKLYN 21 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D021142 P.S. 90 - BROOKLYN BROOKLYN 21 RESO A ROOFTOP GARDEN $4M OVER 2024/03 EXT. WORK Design D021114 P.S. 94 - BROOKLYN BROOKLYN 15 VENTILATION $4M OVER 2024/01 BUILDING SYSTEMS Design D021114 P.S. 94 - BROOKLYN BROOKLYN 15 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2024/01 ELECTRICAL Design D021114 P.S. 94 - BROOKLYN BROOKLYN 15 BMS UPGRADE $4M OVER 2024/01 BOILER/HEAT PUMP Design D017779 P.S. 97 - BROOKLYN BROOKLYN 21 PLANYC BOILER CONVERSION $4M OVER 2024/01 BOILER/HEAT PUMP Design D018260 P.S. 97 - BROOKLYN BROOKLYN 21 PLANYC CLIMATE CONTROL $1M - $4M 2024/01 BOILER/HEAT PUMP Design D022168 P.S./I.S. 323 - BROOKLYN BROOKLYN 23 ROOFS $4M OVER 2024/05 EXT. WORK Design D022168 P.S./I.S. 323 - BROOKLYN BROOKLYN 23 WINDOWS $4M OVER 2024/05 EXT. WORK Design D022168 P.S./I.S. 323 - BROOKLYN BROOKLYN 23 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022168 P.S./I.S. 323 - BROOKLYN BROOKLYN 23 PAVED AREA- CONCRETE $4M OVER 2024/05 SITE Design D022168 P.S./I.S. 323 - BROOKLYN BROOKLYN 23 PARAPETS $4M OVER 2024/05 EXT. WORK Design D022174 PERFORMING ARTS AND TECH. HS - K BROOKLYN 19 ROOFS $4M OVER 2024/05 EXT. WORK Design D022174 PERFORMING ARTS AND TECH. HS - K BROOKLYN 19 WINDOWS $4M OVER 2024/05 EXT. WORK Design D022174 PERFORMING ARTS AND TECH. HS - K BROOKLYN 19 PARAPETS $4M OVER 2024/05 EXT. WORK Design D022174 PERFORMING ARTS AND TECH. HS - K BROOKLYN 19 FLOOD ELIMINATION $4M OVER 2024/05 EXT. WORK Design D022174 PERFORMING ARTS AND TECH. HS - K BROOKLYN 19 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022174 PERFORMING ARTS AND TECH. HS - K BROOKLYN 19 ANSUL SYSTEMS $4M OVER 2024/05 SCHOOL SAFETY Design D022174 PERFORMING ARTS AND TECH. HS - K BROOKLYN 19 FIRE ALARM SYSTEM $4M OVER 2024/05 ELECTRICAL Design D022045 R. CARSON SCL OF COASTAL ST-K BROOKLYN 21 RESO A ROOM CONVERSIONS / PARTITIONING $500K - $750K 2024/03 ROOM CONVERSIONS/UPGRADES Design D022272 R. CARSON SCL OF COASTAL ST-K BROOKLYN 21 PATH OF TRAVEL RESO A ROOM CONVERSIONS/PARTITIONING $0 - $250K 2024/02 ACCESSIBILITY Design D022318 R. CARSON SCL OF COASTAL ST-K BROOKLYN 21 RESO A IPDVS CAMERA INSTALLATION $0 - $250K 2024/05 ELECTRICAL Design D021842 RIVERDALE AVENUE MIDDLE SCHOOL BROOKLYN 23 RESO A AUDITORIUM UPGRADE $500K - $750K 2024/01 AUDITORIUM UPGRADES Design D021971 RIVERDALE AVENUE MIDDLE SCHOOL BROOKLYN 23 PATH OF TRAVEL RESO A AUDITORIUM UPGRADE $0 - $250K 2024/01 ACCESSIBILITY Design D021754 THE URBAN ASSEMBLY SCHOOL FOR COLLABORATIVE HEALTHCARE BROOKLYN 19 ACCESSIBLE RAMP $1M - $4M 2024/02 ACCESSIBILITY Design D020777 URBAN STRATEGIES DAY CARE CENTER SITE 1 BROOKLYN 19 ACS EARLY LEARN LEASE IMPROVEMENT $500K - $750K 2024/03 LEASES Design D022175 URBAN STRATEGIES DAY CARE CENTER SITE 1 BROOKLYN 19 PATH OF TRAVEL $0 - $250K 2024/03 ACCESSIBILITY Design D021555 WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN BROOKLYN 16 PARAPETS $4M OVER 2024/02 EXT. WORK Design D021555 WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN BROOKLYN 16 EXTERIOR MASONRY $4M OVER 2024/02 EXT. WORK Design D021555 WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN BROOKLYN 16 WINDOWS $4M OVER 2024/02 EXT. WORK Design D021555 WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN BROOKLYN 16 PAVED AREAS- CONCRETE $4M OVER 2024/02 SITE Design D020890 WIILIAMSBURG PREP- BROOKLYN BROOKLYN 14 FIRE ALARM SYSTEM $1M - $4M 2024/01 ELECTRICAL Design D022211 WILLIAM MAXWELL VOC HS - K BROOKLYN 19 WALK-IN REFRIGERATORS AND FREEZERS $750K - $1M 2024/04 WALK-IN REFRIGERATORS AND FREEZERS Design D019803 BERGTRAUM HS - MANHATTAN MANHATTAN 02 ATHLETIC FIELD UPGRADE $4M OVER 2024/05 ATHLETIC FIELDS Design D021209 CENTRAL PARK EAST HS - MANHATTAN MANHATTAN 04 NON-IDA PLAYGROUND UPGRADE $4M OVER 2024/02 PLAYGROUNDS Design D021519 EAST SIDE COMMUNITY SCHOOL MANHATTAN 01 VENTILATION $4M OVER 2024/01 BUILDING SYSTEMS Design D021519 EAST SIDE COMMUNITY SCHOOL MANHATTAN 01 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2024/01 ELECTRICAL Design D022161 FIORELLO LAGUARDIA HS - MANHATTAN MANHATTAN 03 STAIRWELL WALLS $1M - $4M 2024/03 INTERIOR Design D021715 FREDERICK DOUGLAS ACADEMY - M MANHATTAN 05 ROOF LEAK $4M OVER 2024/01 EXT. WORK Design D021715 FREDERICK DOUGLAS ACADEMY - M MANHATTAN 05 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021715 FREDERICK DOUGLAS ACADEMY - M MANHATTAN 05 WINDOWS $4M OVER 2024/01 EXT. WORK Design D021880 HAMILTON GRANGE MIDDLE SCHOOL MANHATTAN 06 RESO A AUDITORIUM UPGRADE $250K - $500K 2024/01 AUDITORIUM UPGRADES Design D020701 I.S. 114 - MANHATTAN MANHATTAN 02 RESO A- DANCE STUDIO $250K - $500K 2024/01 ROOM CONVERSIONS/UPGRADES Design D021641 I.S. 293 - MANHATTAN MANHATTAN 06 FLOOD ELIMINATION $4M OVER 2024/05 EXT. WORK Design D021641 I.S. 293 - MANHATTAN MANHATTAN 06 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D021641 I.S. 293 - MANHATTAN MANHATTAN 06 PARAPETS $4M OVER 2024/05 EXT. WORK Design D021641 I.S. 293 - MANHATTAN MANHATTAN 06 ROOFS $4M OVER 2024/05 EXT. WORK Design D021718 I.S. 293 - MANHATTAN MANHATTAN 06 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/06 BOILER ELECTRIFICATION Scope D021603 I.S. 328 - MANHATTAN MANHATTAN 06 ROOFS $4M OVER 2024/01 EXT. WORK Design D021603 I.S. 328 - MANHATTAN MANHATTAN 06 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021603 I.S. 328 - MANHATTAN MANHATTAN 06 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021687 I.S. 328 - MANHATTAN MANHATTAN 06 SCIENCE LAB UPGRADES $1M - $4M 2024/02 SCIENCE LAB UPGRADES Design D021900 I.S. 328 - MANHATTAN MANHATTAN 06 PATH OF TRAVEL SCIENCE LAB UPGRADE $0 - $250K 2024/02 ACCESSIBILITY Design D021636 I.S. 528 - MANHATTAN MANHATTAN 06 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/01 PLAYGROUNDS Design D021600 I.S. 54 - MANHATTAN MANHATTAN 03 ROOFS $4M OVER 2024/06 EXT. WORK Design D021600 I.S. 54 - MANHATTAN MANHATTAN 03 PARAPETS $4M OVER 2024/06 EXT. WORK Design D021600 I.S. 54 - MANHATTAN MANHATTAN 03 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D021600 I.S. 54 - MANHATTAN MANHATTAN 03 FLOOD ELIMINATION $4M OVER 2024/06 EXT. WORK Design D021600 I.S. 54 - MANHATTAN MANHATTAN 03 WINDOWS $4M OVER 2024/06 EXT. WORK Design D021956 I.S. 862 - MANHATTAN MANHATTAN 03 PATH OF TRAVEL RESO A GYMNASIUM UPGRADE $0 - $250K 2024/03 ACCESSIBILITY Design D021858 I.S. 896 - MANHATTAN MANHATTAN 02 RESO A LIBRARY UPGRADE $250K - $500K 2024/02 LIBRARY UPGRADES Design D021936 I.S. 896 - MANHATTAN MANHATTAN 02 PATH OF TRAVEL RESO A LIBRARY UPGRADE $0 - $250K 2024/02 ACCESSIBILITY Design D018801 J. K. ONASSIS HS FOR INT CAREERS-M MANHATTAN 02 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D018801 J. K. ONASSIS HS FOR INT CAREERS-M MANHATTAN 02 PARAPETS $4M OVER 2024/01 EXT. WORK Design D018801 J. K. ONASSIS HS FOR INT CAREERS-M MANHATTAN 02 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D018801 J. K. ONASSIS HS FOR INT CAREERS-M MANHATTAN 02 ROOFS $4M OVER 2024/01 EXT. WORK Design D018801 J. K. ONASSIS HS FOR INT CAREERS-M MANHATTAN 02 WINDOWS $4M OVER 2024/01 EXT. WORK Design D020709 J.H.S. 292 - MANHATTAN MANHATTAN 01 LOW-VOLTAGE ELECTRICAL SYSTEM $1M - $4M 2024/01 ELECTRICAL Design D021760 J.H.S. 52 - MANHATTAN MANHATTAN 06 EXTERIOR MASONRY $4M OVER 2024/04 EXT. WORK Design D021760 J.H.S. 52 - MANHATTAN MANHATTAN 06 ROOFS $4M OVER 2024/04 EXT. WORK Design D021760 J.H.S. 52 - MANHATTAN MANHATTAN 06 WINDOWS $4M OVER 2024/04 EXT. WORK Design D021760 J.H.S. 52 - MANHATTAN MANHATTAN 06 PARAPETS $4M OVER 2024/04 EXT. WORK Design D021760 J.H.S. 52 - MANHATTAN MANHATTAN 06 FLOOD ELIMINATION $4M OVER 2024/04 EXT. WORK Design D022089 M811 SPED - MANHATTAN MANHATTAN 03 ROOFS $4M OVER 2024/05 EXT. WORK Design D022089 M811 SPED - MANHATTAN MANHATTAN 03 WINDOWS $4M OVER 2024/05 EXT. WORK Design D022089 M811 SPED - MANHATTAN MANHATTAN 03 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022089 M811 SPED - MANHATTAN MANHATTAN 03 PARAPETS $4M OVER 2024/05 EXT. WORK Design D017131 MURRAY HILL ACADEMY HS - M MANHATTAN 02 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D017131 MURRAY HILL ACADEMY HS - M MANHATTAN 02 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D017131 MURRAY HILL ACADEMY HS - M MANHATTAN 02 ROOFS $4M OVER 2024/01 EXT. WORK Design D017131 MURRAY HILL ACADEMY HS - M MANHATTAN 02 PARAPETS $4M OVER 2024/01 EXT. WORK Design D017131 MURRAY HILL ACADEMY HS - M MANHATTAN 02 WINDOWS $4M OVER 2024/01 EXT. WORK Design D019271 NEW YORK HARBOR SCHOOL - MANHATTAN MANHATTAN 02 STRUCTURAL ISSUES $750K - $1M 2024/01 BUILDING SYSTEMS Design D022024 NEW YORK HARBOR SCHOOL - MANHATTAN MANHATTAN 02 IPDVS UPGRADE- EXISTING BUILDING $0 - $250K 2024/01 ELECTRICAL Design D021643 NYC LAB MIDDLE SCHOOL - MANHATTAN MANHATTAN 02 RESO A LOCKER ROOM UPGRADE $1M - $4M 2024/06 GYMNASIUM Scope D022213 P.S. 108 - MANHATTAN MANHATTAN 04 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D020990 P.S. 110 - MANHATTAN MANHATTAN 01 FACADE REMEDIATION @M110 $4M OVER 2024/01 EXT. WORK Design D020990 P.S. 110 - MANHATTAN MANHATTAN 01 PARAPETS $4M OVER 2024/01 EXT. WORK Design D020990 P.S. 110 - MANHATTAN MANHATTAN 01 ROOFS $4M OVER 2024/01 EXT. WORK Design D020990 P.S. 110 - MANHATTAN MANHATTAN 01 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design P026404 P.S. 111 - MANHATTAN MANHATTAN 02 IPDVS CAMERA INSTALLATION $500K - $750K 2024/01 ELECTRICAL Design D020321 P.S. 115 - MANHATTAN MANHATTAN 06 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D020321 P.S. 115 - MANHATTAN MANHATTAN 06 PARAPETS $4M OVER 2024/01 EXT. WORK Design D020321 P.S. 115 - MANHATTAN MANHATTAN 06 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D020321 P.S. 115 - MANHATTAN MANHATTAN 06 WINDOWS $4M OVER 2024/01 EXT. WORK Design D020321 P.S. 115 - MANHATTAN MANHATTAN 06 ELECTRICAL UPGRADE $4M OVER 2024/01 ELECTRICAL Design D021307 P.S. 116 - MANHATTAN MANHATTAN 02 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/05 PLAYGROUNDS Design D022088 P.S. 123 - MANHATTAN MANHATTAN 05 WINDOWS $4M OVER 2024/06 EXT. WORK Design D022088 P.S. 123 - MANHATTAN MANHATTAN 05 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D021183 P.S. 124 - MANHATTAN MANHATTAN 02 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/01 PLAYGROUNDS Design D021903 P.S. 125 - MANHATTAN MANHATTAN 05 RESO A CAFETERIA UPGRADE $250K - $500K 2024/02 ROOM CONVERSIONS/UPGRADES Design D021904 P.S. 125 - MANHATTAN MANHATTAN 05 RESO A POOL UPGRADE $4M OVER 2024/04 MISCELLANEOUS Design D021972 P.S. 125 - MANHATTAN MANHATTAN 05 PATH OF TRAVEL RESO A POOL UPGRADE $0 - $250K 2024/02 ACCESSIBILITY Design D022263 P.S. 128 - MANHATTAN MANHATTAN 06 RESO A IPDVS CAMERA INSTALLATION $0 - $250K 2024/04 ELECTRICAL Design D022124 P.S. 133 - MANHATTAN MANHATTAN 05 IPDVS CAMERA INSTALLATION $0 - $250K 2024/01 ELECTRICAL Design D021572 P.S. 146 - MANHATTAN MANHATTAN 04 ROOFS $4M OVER 2024/01 EXT. WORK Design D021572 P.S. 146 - MANHATTAN MANHATTAN 04 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021572 P.S. 146 - MANHATTAN MANHATTAN 04 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D021526 P.S. 152 - MANHATTAN MANHATTAN 06 ROOFS $4M OVER 2024/06 EXT. WORK Design D021526 P.S. 152 - MANHATTAN MANHATTAN 06 PARAPETS $4M OVER 2024/06 EXT. WORK Design D021526 P.S. 152 - MANHATTAN MANHATTAN 06 WINDOWS $4M OVER 2024/06 EXT. WORK Design D021526 P.S. 152 - MANHATTAN MANHATTAN 06 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D021526 P.S. 152 - MANHATTAN MANHATTAN 06 EMERGENCY GENERATOR $4M OVER 2024/06 ELECTRICAL Design D021526 P.S. 152 - MANHATTAN MANHATTAN 06 FLOOD ELIMINATION $4M OVER 2024/06 EXT. WORK Design D022214 P.S. 152 - MANHATTAN MANHATTAN 06 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D022324 P.S. 152 - MANHATTAN MANHATTAN 06 RESO A IPDVS CAMERA INSTALLATION $0 - $250K 2024/05 ELECTRICAL Design D021647 P.S. 154 - MANHATTAN MANHATTAN 05 FIRE ALARM SYSTEM REPLACEMENT $750K - $1M 2024/01 ELECTRICAL Design D021722 P.S. 155 - MANHATTAN MANHATTAN 04 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/06 BOILER ELECTRIFICATION Design D021722 P.S. 155 - MANHATTAN MANHATTAN 04 WINDOWS $4M OVER 2024/06 EXT. WORK Design D021722 P.S. 155 - MANHATTAN MANHATTAN 04 ROOFS $4M OVER 2024/06 EXT. WORK Design D021722 P.S. 155 - MANHATTAN MANHATTAN 04 ELECTRICAL UPGRADE $4M OVER 2024/06 ELECTRICAL Design D020677 P.S. 165 - MANHATTAN MANHATTAN 03 RESO A AUDITORIUM UPGRADE $1M - $4M 2024/04 AUDITORIUM UPGRADES Design D021835 P.S. 165 - MANHATTAN MANHATTAN 03 RESO A GYMNASIUM UPGRADE $750K - $1M 2024/03 GYMNASIUM Design D021974 P.S. 187 - MANHATTAN MANHATTAN 06 PATH OF TRAVEL RESO A PLAYGROUND UPGRADE $0 - $250K 2024/01 ACCESSIBILITY Design P026404 P.S. 19 - MANHATTAN MANHATTAN 01 IPDVS CAMERA INSTALLATION $500K - $750K 2024/01 ELECTRICAL Design D021741 P.S. 192 - MANHATTAN MANHATTAN 06 OTHER TEMP STRUCTURE REMOVAL/PAVED AREA-CONCRETE $1M - $4M 2024/02 SITE Design P026133 P.S. 192 - MANHATTAN MANHATTAN 06 PAVED AREAS - CONCRETE $1M - $4M 2024/01 SITE Design P026133 P.S. 192 - MANHATTAN MANHATTAN 06 EXTERIOR STAIRS $1M - $4M 2024/01 EXT. WORK Design P026378 P.S. 199 - MANHATTAN MANHATTAN 03 IPDVS CAMERA INSTALLATION $500K - $750K 2024/01 ELECTRICAL Design D020374 P.S. 210 - MANHATTAN MANHATTAN 06 ROOFS $1M - $4M 2024/01 EXT. WORK Design D021796 P.S. 225 - MANHATTAN MANHATTAN 02 RESO A LOCKER ROOM UPGRADE $1M - $4M 2024/01 GYMNASIUM Design D021953 P.S. 225 - MANHATTAN MANHATTAN 02 PATH OF TRAVEL RESO A LOCKER ROOM UPGRADE $0 - $250K 2024/01 ACCESSIBILITY Design D022010 P.S. 28 - MANHATTAN MANHATTAN 06 WATER INFILTRATION INTO ELECTRCIAL EQUIPMENT $1M - $4M 2024/01 EXT. WORK Design D022010 P.S. 28 - MANHATTAN MANHATTAN 06 FIRE ALARM SYSTEM REPLACEMENT $1M - $4M 2024/01 ELECTRICAL Design D021655 P.S. 290 - MANHATTAN MANHATTAN 02 RESO A ROOFTOP PLAYGROUND $4M OVER 2024/01 EXT. WORK Design D022017 P.S. 30 - MANHATTAN MANHATTAN 05 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/06 BOILER ELECTRIFICATION Design D022017 P.S. 30 - MANHATTAN MANHATTAN 05 ELECTRICAL SERVICE UPGRADE $4M OVER 2024/06 ELECTRICAL Design D022215 P.S. 311 - MANHATTAN MANHATTAN 06 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D019558 P.S. 333 - MANHATTAN MANHATTAN 03 RPZ BACKFLOW PREVENTION DEVICES $500K - $750K 2024/01 ELECTRICAL Design D022224 P.S. 333 - MANHATTAN MANHATTAN 03 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2024/05 WALK-IN REFRIGERATORS AND FREEZERS Design D021766 P.S. 37 - MANHATTAN MANHATTAN 04 SIDEWALK REPAIR $1M - $4M 2024/01 SITE Design D022285 P.S. 37 - MANHATTAN MANHATTAN 04 ROOFS $4M OVER 2024/05 EXT. WORK Design D022285 P.S. 37 - MANHATTAN MANHATTAN 04 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022285 P.S. 37 - MANHATTAN MANHATTAN 04 PARAPETS $4M OVER 2024/05 EXT. WORK Design D022077 P.S. 38 - MANHATTAN MANHATTAN 04 ROOFS $4M OVER 2024/05 EXT. WORK Design D022077 P.S. 38 - MANHATTAN MANHATTAN 04 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022077 P.S. 38 - MANHATTAN MANHATTAN 04 PARAPETS $4M OVER 2024/05 EXT. WORK Design D022077 P.S. 38 - MANHATTAN MANHATTAN 04 FLOOD ELIMINATION $4M OVER 2024/05 EXT. WORK Design D022068 P.S. 452 - MANHATTAN MANHATTAN 03 GYM CEILING RESTORATION- PERMANENT FIX $500K - $750K 2024/01 GYMNASIUM Design D022022 P.S. 46 - MANHATTAN MANHATTAN 05 OTHER TEMP STRUCTURE REMOVAL/PAVED AREA-CONCRETE $1M - $4M 2024/02 PLAYGROUNDS Design D017528 P.S. 48 - MANHATTAN MANHATTAN 06 CERTIFICATE OF OCCUPANCY $1M - $4M 2024/01 ADMIN/CODE COMP Design D021097 P.S. 48 - MANHATTAN MANHATTAN 06 FIRE ALARM $4M OVER 2024/05 ELECTRICAL Design D021097 P.S. 48 - MANHATTAN MANHATTAN 06 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/05 BOILER ELECTRIFICATION Design D021097 P.S. 48 - MANHATTAN MANHATTAN 06 WINDOWS $4M OVER 2024/05 EXT. WORK Design D021097 P.S. 48 - MANHATTAN MANHATTAN 06 ELECTRICAL SERVICE UPGRADE $4M OVER 2024/05 ELECTRICAL Design D021209 P.S. 497 - MANHATTAN MANHATTAN 04 IDA FLOOD ELIMINATION $4M OVER 2024/02 EXT. WORK Design D021209 P.S. 497 - MANHATTAN MANHATTAN 04 IDA ELECTRICAL UPGRADE $4M OVER 2024/02 ELECTRICAL Design D021209 P.S. 497 - MANHATTAN MANHATTAN 04 IDA ROOFS $4M OVER 2024/02 EXT. WORK Design D021209 P.S. 497 - MANHATTAN MANHATTAN 04 IDA HEATING PLANT UPGRADE $4M OVER 2024/02 BOILER/HEAT PUMP Design D021209 P.S. 497 - MANHATTAN MANHATTAN 04 IDA INTERIOR SPACES $4M OVER 2024/02 INTERIOR Design D021750 P.S. 497 - MANHATTAN MANHATTAN 04 PATH OF TRAVEL IDA FLOOD ELIMINATION $250K - $500K 2024/02 ACCESSIBILITY Design D019951 P.S. 64 - MANHATTAN MANHATTAN 01 RESO A PLAYGROUND UPGRADE $1M - $4M 2024/01 PLAYGROUNDS Design D020191 P.S. 64 - MANHATTAN MANHATTAN 01 RESO A PATH OF TRAVEL PLAYGROUND UPGRADE $0 - $250K 2024/01 ACCESSIBILITY Design D022235 P.S. 72 - MANHATTAN MANHATTAN 04 ROOF REPLACEMENT $1M - $4M 2024/04 EXT. WORK Design D022235 P.S. 72 - MANHATTAN MANHATTAN 04 EXTERIOR MASONRY $1M - $4M 2024/04 EXT. WORK Design P026378 P.S. 75 - MANHATTAN MANHATTAN 03 IPDVS CAMERA INSTALLATION $500K - $750K 2024/01 ELECTRICAL Design D022319 P.S. 77 - MANHATTAN MANHATTAN 02 RESO A IPDVS CAMERA INSTALLATION $250K - $500K 2024/05 ELECTRICAL Design D022260 P.S. 83 - MANHATTAN MANHATTAN 04 ROOFS $4M OVER 2024/05 EXT. WORK Design D022260 P.S. 83 - MANHATTAN MANHATTAN 04 WINDOWS $4M OVER 2024/05 EXT. WORK Design D022260 P.S. 83 - MANHATTAN MANHATTAN 04 PARAPETS $4M OVER 2024/05 EXT. WORK Design D022260 P.S. 83 - MANHATTAN MANHATTAN 04 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design P026404 P.S. 89 - MANHATTAN MANHATTAN 02 IPDVS CAMERA INSTALLATION $500K - $750K 2024/01 ELECTRICAL Design D021751 P.S. 98 - MANHATTAN MANHATTAN 06 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT: $1M - $4M 2024/02 PLAYGROUNDS Design D022054 P.S. 98 - MANHATTAN MANHATTAN 06 PATH OF TRAVEL-OTHER TEMP STRUCTURE REMOVAL $0 - $250K 2024/02 ACCESSIBILITY Design D021210 P.S./I.S. 276 - MANHATTAN MANHATTAN 02 IDA INTERIOR SPACES $750K - $1M 2024/02 INTERIOR Design D021210 P.S./I.S. 276 - MANHATTAN MANHATTAN 02 IDA FLOOD ELIMINATION $750K - $1M 2024/02 EXT. WORK Design D021737 SCHOOL FOR COOPERATIVE TECHNICAL EDUCATION MANHATTAN 04 EXTERIOR MASONRY- PERMANENT FIX $4M OVER 2024/05 EXT. WORK Design D021737 SCHOOL FOR COOPERATIVE TECHNICAL EDUCATION MANHATTAN 04 PARAPETS $4M OVER 2024/05 EXT. WORK Design D020325 SCHOOL OF THE FUTURE - MANHATTAN MANHATTAN 02 FLOOD ELIMINATION $1M - $4M 2024/01 EXT. WORK Design D020325 SCHOOL OF THE FUTURE - MANHATTAN MANHATTAN 02 WINDOWS $1M - $4M 2024/01 EXT. WORK Design D020325 SCHOOL OF THE FUTURE - MANHATTAN MANHATTAN 02 EXTERIOR MASONRY $1M - $4M 2024/01 EXT. WORK Design D020784 U.F.B.C.O. MANHATTAN 06 ACS EARLY LEARN LEASE IMPROVEMENT $0 - $250K 2024/06 LEASES Design D021745 WADLEIGH SECONDARY SCHOOL FOR THE PERFORMING & VISUAL ARTS MANHATTAN 03 FLOOD ELIMINATION $1M - $4M 2024/02 EXT. WORK Design D022196 WADLEIGH SECONDARY SCHOOL FOR THE PERFORMING & VISUAL ARTS MANHATTAN 03 ROOFS $4M OVER 2024/04 EXT. WORK Design D022196 WADLEIGH SECONDARY SCHOOL FOR THE PERFORMING & VISUAL ARTS MANHATTAN 03 EXTERIOR MASONRY $4M OVER 2024/04 EXT. WORK Design D022065 YOUNG WOMEN'S LEADERSHIP SCHOOL MANHATTAN 04 IPDVS CAMERA INSTALLATION $0 - $250K 2024/01 ELECTRICAL Design D021830 ACAD. OF MEDICAL TECHNOLOGY - Q QUEENS 27 RESO A ELECTRICAL UPGRADE $250K - $500K 2024/04 ELECTRICAL Design D021205 AVIATION HS - QUEENS QUEENS 24 IDA FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D021205 AVIATION HS - QUEENS QUEENS 24 IDA HEATING PLANT UPGRADE $4M OVER 2024/01 BOILER/HEAT PUMP Design D021205 AVIATION HS - QUEENS QUEENS 24 NON-IDA CLIMATE CONTROL $4M OVER 2024/01 BOILER/HEAT PUMP Design D021205 AVIATION HS - QUEENS QUEENS 24 IDA INTERIOR SPACES $4M OVER 2024/01 INTERIOR Design D020024 BAYSIDE HIGH SCHOOL - QUEENS QUEENS 26 RESO A GREENHOUSE $1M - $4M 2024/04 SCIENCE LAB UPGRADES Design D018886 BENJAMIN N. CARDOZO HS - QUEENS QUEENS 26 RPZ VALVES $500K - $750K 2024/01 ELECTRICAL Design D022305 BENJAMIN N. CARDOZO HS - QUEENS QUEENS 26 TCU REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/06 PLAYGROUNDS Scope D022269 BETTER CCOMMUNITY LIFE DAY CARE CENTER SITE QUEENS 24 ACS EARLY LEARN-LEASE RENOVATION $0 - $250K 2024/07 LEASES Scope D021630 BUSINESS TECHNOLOGY EARLY COLLEGE HIGH SCHOOL QUEENS 26 LOW VOLTAGE ELECTRICAL SYSTEMS $4M OVER 2024/02 ELECTRICAL Design D019326 CHANNEL VIEW SCL FOR RESEARCH - Q QUEENS 27 SEA WALL / BULKHEAD REPAIR $4M OVER 2024/05 SITE Design D020200 CHANNEL VIEW SCL FOR RESEARCH - Q QUEENS 27 RESO A WEIGHT ROOM $1M - $4M 2024/02 GYMNASIUM Design D021309 COLLEGE POINT COLLABORATIVE - QUEENS QUEENS 25 RESO A PLAYGROUND UPGRADE $250K - $500K 2024/01 PLAYGROUNDS Design D022169 COLLEGE POINT COLLABORATIVE - QUEENS QUEENS 25 RESO A EXTERIOR DOOR $0 - $250K 2024/03 SCHOOL SAFETY Design D021658 DISTRICT 25 PRE-K CENTER QUEENS 25 FIRE ALARM SYSTEM REPLACEMENT $1M - $4M 2024/01 ELECTRICAL Design D022316 EAGLE ACADEMY III - QUEENS QUEENS 29 RESO A ELECTRICAL UPGRADE $0 - $250K 2024/06 ELECTRICAL Scope D021794 FLUSHING HS - QUEENS QUEENS 25 RESO A ATHLETIC FIELD UPGRADE $4M OVER 2024/03 ATHLETIC FIELDS Design D021810 FLUSHING HS - QUEENS QUEENS 25 RESO A GYMNASIUM UPGRADE $500K - $750K 2024/03 GYMNASIUM Design D021984 FLUSHING HS - QUEENS QUEENS 25 PATH OF TRAVEL RESO A GYMNASIUM UPGRADE $0 - $250K 2024/03 ACCESSIBILITY Design D021673 FOREST HILLS HS - QUEENS QUEENS 28 SLATE ROOF TILES - SCOPE ONLY $4M OVER 2024/04 EXT. WORK Design D021872 FOREST HILLS HS - QUEENS QUEENS 28 RESO A AUDITORIUM UPGRADE $1M - $4M 2024/03 AUDITORIUM UPGRADES Design D021266 FRANCIS LEWIS HS - QUEENS QUEENS 26 IDA FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D021266 FRANCIS LEWIS HS - QUEENS QUEENS 26 NON-IDA REINFORCE SUPPORT ELEMENTS $4M OVER 2024/01 BUILDING SYSTEMS Design D021266 FRANCIS LEWIS HS - QUEENS QUEENS 26 IDA HEATING PLANT UPGRADE $4M OVER 2024/01 BOILER/HEAT PUMP Design D021266 FRANCIS LEWIS HS - QUEENS QUEENS 26 IDA INTERIOR SPACES $4M OVER 2024/01 INTERIOR Design D019994 HS FOR ARTS AND BUSINESS - QUEENS QUEENS 24 FLOOD ELIMINATION $4M OVER 2024/03 EXT. WORK Design D021241 I.S. 109 - QUEENS QUEENS 29 LOW VOLTAGE ELECTRICAL SYSTEM $1M - $4M 2024/01 ELECTRICAL Design D021838 I.S. 119 - QUEENS QUEENS 24 RESO A COMPUTER LAB UPGRADE $250K - $500K 2024/03 ROOM CONVERSIONS/UPGRADES Design D021748 I.S. 125 - QUEENS QUEENS 24 FLOOD ELIMINATION $1M - $4M 2024/04 EXT. WORK Design D021837 I.S. 126 - QUEENS QUEENS 30 RESO A SCIENCE LAB $500K - $750K 2024/04 SCIENCE LAB UPGRADES Design D021933 I.S. 126 - QUEENS QUEENS 30 PATH OF TRAVEL RESO A SCIENCE LAB $0 - $250K 2024/03 ACCESSIBILITY Design D022193 I.S. 145 - QUEENS QUEENS 30 ROOFS $4M OVER 2024/06 EXT. WORK Design D022193 I.S. 145 - QUEENS QUEENS 30 FLOOD ELIMINATION $4M OVER 2024/06 EXT. WORK Design D022193 I.S. 145 - QUEENS QUEENS 30 PARAPETS $4M OVER 2024/06 EXT. WORK Design D022193 I.S. 145 - QUEENS QUEENS 30 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D020332 I.S. 202 - QUEENS QUEENS 27 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D020332 I.S. 202 - QUEENS QUEENS 27 PARAPETS $4M OVER 2024/01 EXT. WORK Design D020332 I.S. 202 - QUEENS QUEENS 27 ROOFS $4M OVER 2024/01 EXT. WORK Design D020332 I.S. 202 - QUEENS QUEENS 27 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D020332 I.S. 202 - QUEENS QUEENS 27 SIDEWALK REPAIR $4M OVER 2024/01 SITE Design D020332 I.S. 202 - QUEENS QUEENS 27 WINDOWS $4M OVER 2024/01 EXT. WORK Design D022229 I.S. 202 - QUEENS QUEENS 27 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D021008 I.S. 226 - QUEENS QUEENS 27 RTU REPLACEMENT $1M - $4M 2024/01 BUILDING SYSTEMS Design D021008 I.S. 226 - QUEENS QUEENS 27 ROOFS $1M - $4M 2024/01 EXT. WORK Design D020730 I.S. 294 - QUEENS QUEENS 25 RESO A AUDITORIUM UPGRADE $250K - $500K 2024/01 AUDITORIUM UPGRADES Design D021616 I.S. 318 - QUEENS QUEENS 27 WINDOWS $4M OVER 2024/05 EXT. WORK Design D021885 I.S. 5 - QUEENS QUEENS 24 RESO A PLAYGROUND UPGRADE $250K - $500K 2024/01 PLAYGROUNDS Design D022226 I.S. 53 - QUEENS QUEENS 27 WALK-IN REFRIGERTAORS AND FREEZERS $500K - $750K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D021605 I.S. 59 - QUEENS QUEENS 29 ROOFS $4M OVER 2024/01 EXT. WORK Design D021605 I.S. 59 - QUEENS QUEENS 29 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021605 I.S. 59 - QUEENS QUEENS 29 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D019634 I.S. 73 - QUEENS QUEENS 24 SMOKE PURGE SYSTEM $750K - $1M 2024/01 ELECTRICAL Design D021041 I.S. 74 - QUEENS QUEENS 26 IDA FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D021041 I.S. 74 - QUEENS QUEENS 26 IDA INTERIOR SPACES $4M OVER 2024/01 INTERIOR Design D021041 I.S. 74 - QUEENS QUEENS 26 IDA DOMESTIC PIPING $4M OVER 2024/01 ELECTRICAL Design D021041 I.S. 74 - QUEENS QUEENS 26 IDA ELECTRICAL SYSTEMS $4M OVER 2024/01 ELECTRICAL Design D021041 I.S. 74 - QUEENS QUEENS 26 IDA CLIMATE CONTROL $4M OVER 2024/01 BOILER/HEAT PUMP Design D022283 J.H.S. 158 - QUEENS QUEENS 26 RESO A IPDVS CAMERA INSTALLATION $0 - $250K 2024/05 ELECTRICAL Design D022025 J.H.S. 190 - QUEENS QUEENS 28 RESO A SCHOOLYARD UPGRADE $750K - $1M 2024/02 PLAYGROUNDS Design D022148 J.H.S. 25 - QUEENS QUEENS 25 ROOFS $1M - $4M 2024/04 EXT. WORK Design D022148 J.H.S. 25 - QUEENS QUEENS 25 EXTERIOR MASONRY $1M - $4M 2024/04 EXT. WORK Design D022148 J.H.S. 25 - QUEENS QUEENS 25 PARAPETS $1M - $4M 2024/04 EXT. WORK Design D021606 J.H.S. 67 - QUEENS QUEENS 26 ROOFS $4M OVER 2024/01 EXT. WORK Design D021606 J.H.S. 67 - QUEENS QUEENS 26 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021606 J.H.S. 67 - QUEENS QUEENS 26 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D022197 J.H.S. 8 - QUEENS QUEENS 28 ROOFS $4M OVER 2024/06 EXT. WORK Design P026304 JAMAICA GATEWAY TO THE SCIENCES - Q QUEENS 28 SCIENCE LAB UPGRADE $1M - $4M 2024/01 SCIENCE LAB UPGRADES Design D021043 JOHN BOWNE HS - QUEENS QUEENS 25 IDA FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D021043 JOHN BOWNE HS - QUEENS QUEENS 25 IDA INTERIOR SPACES $4M OVER 2024/01 INTERIOR Design D021471 JOHN BOWNE HS - QUEENS QUEENS 25 PATH OF TRAVEL IDA GYM FLOOR REPLACEMENT $0 - $250K 2024/01 ACCESSIBILITY Design D022256 JOHN BOWNE HS - QUEENS QUEENS 25 PATH OF TRAVEL IDA INTERIOR SPACES $0 - $250K 2024/01 ACCESSIBILITY Design D022273 JOHN BOWNE HS - QUEENS QUEENS 25 RPZ BACKFLOW PREVENTION DEVICES $1M - $4M 2024/03 ELECTRICAL Design D022278 JOHN BOWNE HS - QUEENS QUEENS 25 RESO A FARM BUILDING $1M - $4M 2024/07 PLAYGROUNDS Scope D022314 LONG ISLAND CITY H.S. QUEENS 30 RESO A ELECTRICAL UPGRADE $500K - $750K 2024/06 ELECTRICAL Scope D022080 LONG ISLAND CITY HS - Q QUEENS 30 PUBLIC ADDRESS SYSTEM REPLACEMENT $1M - $4M 2024/02 ELECTRICAL Design D020346 M.S. 282 - QUEENS QUEENS 27 SWIMMING POOL $4M OVER 2024/02 MISCELLANEOUS Design D021063 M.S. 282 - QUEENS QUEENS 27 PATH OF TRAVEL SWIMMING POOL $0 - $250K 2024/03 ACCESSIBILITY Scope D022351 M.S. 282 - QUEENS QUEENS 27 LOW VOLTAGE ELECTRICAL SYSTEMS $4M OVER 2024/06 ELECTRICAL Scope D021630 MARTIN VAN BUREN HS - QUEENS QUEENS 26 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/02 ACCESSIBILITY Design D022167 P.S. 100 - QUEENS QUEENS 27 ROOFS $4M OVER 2024/06 EXT. WORK Design D022167 P.S. 100 - QUEENS QUEENS 27 EMERGENCY GENERATOR $4M OVER 2024/06 ELECTRICAL Design D022167 P.S. 100 - QUEENS QUEENS 27 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D022167 P.S. 100 - QUEENS QUEENS 27 WINDOWS $4M OVER 2024/06 EXT. WORK Design D022167 P.S. 100 - QUEENS QUEENS 27 PARAPETS $4M OVER 2024/06 EXT. WORK Design D021574 P.S. 105 - QUEENS QUEENS 27 ROOFS $1M - $4M 2024/05 EXT. WORK Design D021574 P.S. 105 - QUEENS QUEENS 27 PARAPETS $1M - $4M 2024/05 EXT. WORK Design D021574 P.S. 105 - QUEENS QUEENS 27 EXTERIOR MASONRY $1M - $4M 2024/05 EXT. WORK Design D021677 P.S. 110 - QUEENS QUEENS 24 RESO A IPDVS CAMERA INSTALLATION $0 - $250K 2024/02 ELECTRICAL Design D021607 P.S. 113 - QUEENS QUEENS 24 EXTERIOR MASONRY $1M - $4M 2024/04 EXT. WORK Design D021607 P.S. 113 - QUEENS QUEENS 24 ROOFS $1M - $4M 2024/04 EXT. WORK Design D021713 P.S. 116 - QUEENS QUEENS 29 EXISTING BUILDING-INTERIOR RENOVATION/PROGRAM ACCESSIBILITY $4M OVER 2024/03 MISCELLANEOUS Design D022421 P.S. 118 - QUEENS QUEENS 29 RESO A PLAYGROUND UPGRADE $750K - $1M 2024/07 PLAYGROUNDS Scope D021608 P.S. 122 - QUEENS QUEENS 30 ROOFS $4M OVER 2024/02 EXT. WORK Design D021608 P.S. 122 - QUEENS QUEENS 30 PARAPETS $4M OVER 2024/02 EXT. WORK Design D021608 P.S. 122 - QUEENS QUEENS 30 EXTERIOR MASONRY $4M OVER 2024/02 EXT. WORK Design D021608 P.S. 122 - QUEENS QUEENS 30 FLOOD ELIMINATION $4M OVER 2024/02 EXT. WORK Design D022406 P.S. 128 - QUEENS QUEENS 24 RESO A PLAYGROUND UPGRADE $1M - $4M 2024/07 PLAYGROUNDS Scope D018395 P.S. 131 - QUEENS QUEENS 29 PHASE 4 EXISTING BUILDING WORK $500K - $750K 2024/02 MISCELLANEOUS Design D019982 P.S. 131 - QUEENS QUEENS 29 WINDOWS $4M OVER 2024/01 EXT. WORK Design D019982 P.S. 131 - QUEENS QUEENS 29 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D019982 P.S. 131 - QUEENS QUEENS 29 FLOOD ELIMINATION $4M OVER 2024/01 EXT. WORK Design D021917 P.S. 131 - QUEENS QUEENS 29 DRAINAGE $1M - $4M 2024/02 SITE Design D022202 P.S. 133 - QUEENS QUEENS 26 ROOFS $4M OVER 2024/05 EXT. WORK Design D022202 P.S. 133 - QUEENS QUEENS 26 FLOOD ELIMINATION $4M OVER 2024/05 EXT. WORK Design D022202 P.S. 133 - QUEENS QUEENS 26 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022202 P.S. 133 - QUEENS QUEENS 26 PARAPETS $4M OVER 2024/05 EXT. WORK Design D021874 P.S. 14 - QUEENS QUEENS 24 RESO A ROOM CONVERSION $0 - $250K 2024/02 ROOM CONVERSIONS/UPGRADES Design P026403 P.S. 147 - QUEENS QUEENS 29 ROOFS $4M OVER 2024/01 EXT. WORK Design P026403 P.S. 147 - QUEENS QUEENS 29 PARAPETS $4M OVER 2024/01 EXT. WORK Design P026403 P.S. 147 - QUEENS QUEENS 29 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021446 P.S. 149 - QUEENS QUEENS 30 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D021446 P.S. 149 - QUEENS QUEENS 30 PARAPETS $4M OVER 2024/05 EXT. WORK Design D021446 P.S. 149 - QUEENS QUEENS 30 ROOFS $4M OVER 2024/05 EXT. WORK Design D021446 P.S. 149 - QUEENS QUEENS 30 WINDOWS $4M OVER 2024/05 EXT. WORK Design D021446 P.S. 149 - QUEENS QUEENS 30 PAVED AREAS- CONCRETE $4M OVER 2024/05 SITE Design D021446 P.S. 149 - QUEENS QUEENS 30 FLOOD ELIMINATION $4M OVER 2024/05 EXT. WORK Design D021840 P.S. 150 - QUEENS QUEENS 30 RESO A AUDITORIUM UPGRADE $750K - $1M 2024/05 AUDITORIUM UPGRADES Design D020851 P.S. 152 - QUEENS QUEENS 30 ROOFS $4M OVER 2024/01 EXT. WORK Design D020851 P.S. 152 - QUEENS QUEENS 30 PARAPETS $4M OVER 2024/01 EXT. WORK Design D020851 P.S. 152 - QUEENS QUEENS 30 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D020851 P.S. 152 - QUEENS QUEENS 30 GYM WINDOWS $4M OVER 2024/01 EXT. WORK Design D020851 P.S. 152 - QUEENS QUEENS 30 RTU REPLACEMENT $4M OVER 2024/01 BUILDING SYSTEMS Design D020851 P.S. 152 - QUEENS QUEENS 30 FIRE ALARM REPLACEMENT $4M OVER 2024/01 ELECTRICAL Design P026383 P.S. 156 - QUEENS QUEENS 29 RESO A COMPUTER LAB UPGRADE $500K - $750K 2024/01 ROOM CONVERSIONS/UPGRADES Design P026383 P.S. 156 - QUEENS QUEENS 29 PATH OF TRAVEL RESO A COMPUTER LAB UPGRADE $500K - $750K 2024/01 ACCESSIBILITY Design D021153 P.S. 160 - QUEENS QUEENS 28 EXISTING BUILDING-INTERIOR RENOVATIONS $1M - $4M 2024/07 MISCELLANEOUS Design D021153 P.S. 160 - QUEENS QUEENS 28 EXISTING BUILDING-AUDITORIUM $1M - $4M 2024/07 ACCESSIBILITY Design D021153 P.S. 160 - QUEENS QUEENS 28 EXISTING BUILDING-CAFETERIA $1M - $4M 2024/07 ACCESSIBILITY Design D021153 P.S. 160 - QUEENS QUEENS 28 EXISTING BUILDING-GYMNASIUM $1M - $4M 2024/07 ACCESSIBILITY Design D022063 P.S. 161 - QUEENS QUEENS 28 WINDOWS $4M OVER 2024/03 EXT. WORK Design D022063 P.S. 161 - QUEENS QUEENS 28 PARAPETS $4M OVER 2024/03 EXT. WORK Design D022284 P.S. 161 - QUEENS QUEENS 28 RESO A IPDVS CAMERA INSTALLATION $0 - $250K 2024/05 ELECTRICAL Design D020733 P.S. 162 - QUEENS QUEENS 26 PLAYGROUND REDEVELOPMENT $500K - $750K 2024/03 PLAYGROUNDS Design D022237 P.S. 162 - QUEENS QUEENS 26 PATH OF TRAVEL PLAYGROUND REDEVELOPMENT $0 - $250K 2024/06 ACCESSIBILITY Design D022084 P.S. 166 - QUEENS QUEENS 30 ROOFS $4M OVER 2024/05 EXT. WORK Design D022084 P.S. 166 - QUEENS QUEENS 30 PARAPETS $4M OVER 2024/05 EXT. WORK Design D022084 P.S. 166 - QUEENS QUEENS 30 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D021779 P.S. 169 - QUEENS QUEENS 25 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/03 BOILER ELECTRIFICATION Design D021779 P.S. 169 - QUEENS QUEENS 25 ELECTRICAL UPGRADE $4M OVER 2024/03 ELECTRICAL Design D021779 P.S. 169 - QUEENS QUEENS 25 WINDOWS $4M OVER 2024/03 EXT. WORK Design D021779 P.S. 169 - QUEENS QUEENS 25 ROOFS $4M OVER 2024/03 EXT. WORK Design D022173 P.S. 17 - QUEENS QUEENS 30 ROOFS $4M OVER 2024/06 EXT. WORK Design D022173 P.S. 17 - QUEENS QUEENS 30 EXTERIOR MASONRY $4M OVER 2024/06 EXT. WORK Design D022173 P.S. 17 - QUEENS QUEENS 30 PARAPETS $4M OVER 2024/06 EXT. WORK Design D022173 P.S. 17 - QUEENS QUEENS 30 WINDOWS $4M OVER 2024/06 EXT. WORK Design D021020 P.S. 174 - QUEENS QUEENS 28 EXISTING BUILDING-PA/CLOCK SYSTEMS $1M - $4M 2024/01 ELECTRICAL Design D021020 P.S. 174 - QUEENS QUEENS 28 EXISTING BUILDING-FIRE ALARM SYSTEM $1M - $4M 2024/01 ELECTRICAL Design D021020 P.S. 174 - QUEENS QUEENS 28 EXISTING BUILDING- INTERIOR RENOVATIONS $1M - $4M 2024/01 MISCELLANEOUS Design D021020 P.S. 174 - QUEENS QUEENS 28 EXISTING BUILDING-AUDITORIUM $1M - $4M 2024/01 ACCESSIBILITY Design D021020 P.S. 174 - QUEENS QUEENS 28 EXISTING BUILDING-GYMNASIUM $1M - $4M 2024/01 ACCESSIBILITY Design D021610 P.S. 184 - QUEENS QUEENS 25 ROOFS $4M OVER 2024/03 EXT. WORK Design D021610 P.S. 184 - QUEENS QUEENS 25 PARAPETS $4M OVER 2024/03 EXT. WORK Design D021610 P.S. 184 - QUEENS QUEENS 25 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D022191 P.S. 19 - QUEENS QUEENS 24 PARAPETS $4M OVER 2024/04 EXT. WORK Design D022191 P.S. 19 - QUEENS QUEENS 24 ROOFS $4M OVER 2024/04 EXT. WORK Design D022191 P.S. 19 - QUEENS QUEENS 24 WINDOWS $4M OVER 2024/04 EXT. WORK Design D022317 P.S. 20 - QUEENS QUEENS 25 RESO A IPDVS CAMERA INSTALLATION $250K - $500K 2024/06 ELECTRICAL Design D020067 P.S. 206 - QUEENS QUEENS 28 SSBA - EXISTING SCHOOL RENOVATION WORK $1M - $4M 2024/01 MISCELLANEOUS Design D021613 P.S. 206 - QUEENS QUEENS 28 ROOFS $4M OVER 2024/03 EXT. WORK Design D021613 P.S. 206 - QUEENS QUEENS 28 PARAPETS $4M OVER 2024/03 EXT. WORK Design D021613 P.S. 206 - QUEENS QUEENS 28 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D021725 P.S. 206 - QUEENS QUEENS 28 SSBA - DEMOLITION OF TCU UNIT AND PLAYGROUND DEVELOPMENT $1M - $4M 2024/02 PLAYGROUNDS Design D022192 P.S. 207 - QUEENS QUEENS 27 ROOFS $4M OVER 2024/04 EXT. WORK Design D022192 P.S. 207 - QUEENS QUEENS 27 EXTERIOR MASONRY $4M OVER 2024/04 EXT. WORK Design D021575 P.S. 209 - QUEENS QUEENS 25 ROOFS $4M OVER 2024/01 EXT. WORK Design D021575 P.S. 209 - QUEENS QUEENS 25 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021575 P.S. 209 - QUEENS QUEENS 25 WINDOWS $4M OVER 2024/01 EXT. WORK Design D021575 P.S. 209 - QUEENS QUEENS 25 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D022294 P.S. 209 - QUEENS QUEENS 25 PLAYGROUND $1M - $4M 2024/06 PLAYGROUNDS Design D020344 P.S. 228 - QUEENS QUEENS 30 PARAPETS $4M OVER 2024/01 EXT. WORK Design D020344 P.S. 228 - QUEENS QUEENS 30 ROOFS $4M OVER 2024/01 EXT. WORK Design D020344 P.S. 228 - QUEENS QUEENS 30 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021583 P.S. 239 - QUEENS QUEENS 24 EXTERIOR MASONRY $1M - $4M 2024/01 EXT. WORK Design D021866 P.S. 239 - QUEENS QUEENS 24 RESO A PLAYGROUND UPGRADE $250K - $500K 2024/02 PLAYGROUNDS Design D022313 P.S. 244 - QUEENS QUEENS 25 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/06 BOILER ELECTRIFICATION Scope D021198 P.S. 26 - QUEENS QUEENS 26 EXISTING BUILDING-GYMNASIUM $500K - $750K 2024/01 ACCESSIBILITY Design D021198 P.S. 26 - QUEENS QUEENS 26 EXISTING BUILDING-AUDITORIUM $500K - $750K 2024/01 ACCESSIBILITY Design D021264 P.S. 26 - QUEENS QUEENS 26 IDA FLOOD ELIMINATION $1M - $4M 2024/01 EXT. WORK Design D021264 P.S. 26 - QUEENS QUEENS 26 IDA INTERIOR SPACES $1M - $4M 2024/01 INTERIOR Design D021592 P.S. 268 - QUEENS QUEENS 29 ROOFS $1M - $4M 2024/03 EXT. WORK Design D021592 P.S. 268 - QUEENS QUEENS 29 EXTERIOR MASONRY $1M - $4M 2024/03 EXT. WORK Design D022311 P.S. 273 - QUEENS QUEENS 27 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/06 BOILER ELECTRIFICATION Scope D022312 P.S. 306 - QUEENS QUEENS 27 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/06 BOILER ELECTRIFICATION Scope D022204 P.S. 307 - QUEENS QUEENS 24 ROOFS $1M - $4M 2024/05 EXT. WORK Design D022204 P.S. 307 - QUEENS QUEENS 24 EXTERIOR MASONRY $1M - $4M 2024/05 EXT. WORK Design D021616 P.S. 317 - QUEENS QUEENS 27 ROOFS $4M OVER 2024/05 EXT. WORK Design D021616 P.S. 317 - QUEENS QUEENS 27 PARAPETS $4M OVER 2024/05 EXT. WORK Design D021616 P.S. 317 - QUEENS QUEENS 27 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D020704 P.S. 32 - QUEENS QUEENS 25 EXISTING BUILDING WORK $4M OVER 2024/01 OTHER Design D022322 P.S. 360 - QUEENS QUEENS 29 RESO A IPDVS CAMERA INSTALLATION $0 - $250K 2024/06 ELECTRICAL Design D021107 P.S. 40 - QUEENS QUEENS 28 ROOF REPLACEMENT $4M OVER 2024/01 EXT. WORK Design D020447 P.S. 41 - QUEENS QUEENS 26 SSBA - WORK IN EXISTING BUILDING $1M - $4M 2024/01 MISCELLANEOUS Design D021528 P.S. 62 - QUEENS QUEENS 27 ROOFS $4M OVER 2024/04 EXT. WORK Design D021528 P.S. 62 - QUEENS QUEENS 27 PARAPETS $4M OVER 2024/04 EXT. WORK Design D021528 P.S. 62 - QUEENS QUEENS 27 EXTERIOR MASONRY $4M OVER 2024/04 EXT. WORK Design D021528 P.S. 62 - QUEENS QUEENS 27 WINDOWS $4M OVER 2024/04 EXT. WORK Design D022086 P.S. 7 - QUEENS QUEENS 24 ROOFS $4M OVER 2024/05 EXT. WORK Design D022086 P.S. 7 - QUEENS QUEENS 24 PARAPETS $4M OVER 2024/05 EXT. WORK Design D022086 P.S. 7 - QUEENS QUEENS 24 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022086 P.S. 7 - QUEENS QUEENS 24 WINDOWS $4M OVER 2024/05 EXT. WORK Design D021893 P.S. 79 - QUEENS QUEENS 25 RESO A OUTDOOR CLASSROOM $250K - $500K 2024/01 PLAYGROUNDS Design D021847 P.S. 80 - QUEENS QUEENS 28 RESO A MULTIMEDIA CENTER $250K - $500K 2024/02 LIBRARY UPGRADES Design D022083 P.S. 81 - QUEENS QUEENS 24 PARAPETS $4M OVER 2024/05 EXT. WORK Design D022083 P.S. 81 - QUEENS QUEENS 24 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022083 P.S. 81 - QUEENS QUEENS 24 FLOOD ELIMINATION $4M OVER 2024/05 EXT. WORK Design D022083 P.S. 81 - QUEENS QUEENS 24 WINDOWS $4M OVER 2024/05 EXT. WORK Design D022083 P.S. 81 - QUEENS QUEENS 24 ROOFS $4M OVER 2024/05 EXT. WORK Design D019829 P.S. 84 - QUEENS QUEENS 30 STRUCTURAL REPAIRS $4M OVER 2024/01 BUILDING SYSTEMS Design D021573 P.S. 84 - QUEENS QUEENS 30 ROOFS $4M OVER 2024/02 EXT. WORK Design D021573 P.S. 84 - QUEENS QUEENS 30 EXTERIOR MASONRY $4M OVER 2024/02 EXT. WORK Design D021573 P.S. 84 - QUEENS QUEENS 30 FLOOD ELIMINATION $4M OVER 2024/02 EXT. WORK Design D021573 P.S. 84 - QUEENS QUEENS 30 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2024/02 ELECTRICAL Design D021573 P.S. 84 - QUEENS QUEENS 30 HVAC UPGRADES $4M OVER 2024/02 BUILDING SYSTEMS Design D021573 P.S. 84 - QUEENS QUEENS 30 WINDOWS $4M OVER 2024/02 EXT. WORK Design D021039 P.S. 87 - QUEENS QUEENS 24 IDA FLOOD ELIMINATION $250K - $500K 2024/01 EXT. WORK Design D021039 P.S. 87 - QUEENS QUEENS 24 IDA INTERIOR SPACES $250K - $500K 2024/01 INTERIOR Design D021870 P.S. 87 - QUEENS QUEENS 24 RESO A KITCHEN UPGRADE $1M - $4M 2024/05 WALK-IN REFRIGERATORS AND FREEZERS Design D022199 P.S. 87 - QUEENS QUEENS 24 EXTERIOR MASONRY $4M OVER 2024/04 EXT. WORK Design D022199 P.S. 87 - QUEENS QUEENS 24 ROOFS $4M OVER 2024/04 EXT. WORK Design D019337 P.S. 89 - QUEENS QUEENS 24 FIRE ALARM REPLACEMENT $4M OVER 2024/01 ELECTRICAL Design D019337 P.S. 89 - QUEENS QUEENS 24 VENTILATION $4M OVER 2024/01 BUILDING SYSTEMS Design D022195 P.S. 89 - QUEENS QUEENS 24 ROOFS $4M OVER 2024/04 EXT. WORK Design D022195 P.S. 89 - QUEENS QUEENS 24 WINDOWS $4M OVER 2024/04 EXT. WORK Design D022195 P.S. 89 - QUEENS QUEENS 24 FLOOD ELIMINATION $4M OVER 2024/04 EXT. WORK Design D022195 P.S. 89 - QUEENS QUEENS 24 EXTERIOR MASONRY $4M OVER 2024/04 EXT. WORK Design D022364 P.S. 89 - QUEENS QUEENS 24 AIR HANDLING UNITS $750K - $1M 2024/05 BUILDING SYSTEMS Design D021143 P.S. 92 - QUEENS QUEENS 30 PLAYGROUND UPGRADE $1M - $4M 2024/02 PLAYGROUNDS Design D022508 P.S. 92 - QUEENS QUEENS 30 PATH OF TRAVEL PLAYGROUND UPGRADE $0 - $250K 2024/07 ACCESSIBILITY Scope D021666 P.S. 95 - QUEENS QUEENS 29 EXISTING BUILDING-INTERIOR RENOVATION $1M - $4M 2024/02 MISCELLANEOUS Design P026403 Q811 SPED - QUEENS QUEENS 29 ROOF REPLACEMENT $4M OVER 2024/01 EXT. WORK Design D022085 QNS HS OF TEACH., LIB. ARTS&SCI-Q QUEENS 26 ROOFS $4M OVER 2024/05 EXT. WORK Design D022085 QNS HS OF TEACH., LIB. ARTS&SCI-Q QUEENS 26 PARAPETS $4M OVER 2024/05 EXT. WORK Design D022085 QNS HS OF TEACH., LIB. ARTS&SCI-Q QUEENS 26 FIRE ALARM SYSTEM $4M OVER 2024/05 ELECTRICAL Design D022085 QNS HS OF TEACH., LIB. ARTS&SCI-Q QUEENS 26 EXTERIOR MASONRY $4M OVER 2024/05 EXT. WORK Design D022246 QNS HS OF TEACH., LIB. ARTS&SCI-Q QUEENS 26 UNION TPK BRIDGE OVER CROSS ISLAND PKWY IMPACT ON GLEN OAKS LIGHTING $250K - $500K 2024/03 MISCELLANEOUS Design P026304 QUEENS COLLEGIATE SCHOOL - QUEENS QUEENS 28 SCIENCE DEMO ROOM UPGRADES $1M - $4M 2024/01 SCIENCE LAB UPGRADES Design D021854 QUEENS METROPOLITAN HIGH SCHOOL - QUEENS QUEENS 28 RESO A LIBRARY UPGRADE $250K - $500K 2024/02 LIBRARY UPGRADES Design D022323 THE EMERSON SCHOOL - QUEENS QUEENS 28 RESO A IPDVS CAMERA INSTALLATION $0 - $250K 2024/06 ELECTRICAL Scope D020736 THOMAS A. EDISON HS - Q QUEENS 28 PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE $0 - $250K 2024/02 SCIENCE LAB UPGRADES Design D020961 THOMAS A. EDISON HS - Q QUEENS 28 RESO A SCIENCE LAB UPGRADE $750K - $1M 2024/02 SCIENCE LAB UPGRADES Design D020818 YOUNG WOMENS' LEADERSHIP SCHOOL - QUEENS QUEENS 28 EXTERIOR MASONRY $1M - $4M 2024/01 EXT. WORK Design D020818 YOUNG WOMENS' LEADERSHIP SCHOOL - QUEENS QUEENS 28 ROOFS $1M - $4M 2024/01 EXT. WORK Design D021786 CONCORD HS - R STATEN ISLAND 31 RESO A ELECTRICAL UPGRADE $0 - $250K 2024/03 ELECTRICAL Design D022227 I.S. 61 - STATEN ISLAND STATEN ISLAND 31 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D022290 I.S. 7 - STATEN ISLAND STATEN ISLAND 31 RESO A IPDVS CAMERA INSTALLATION $250K - $500K 2024/05 ELECTRICAL Design D021204 I.S. 72 - STATEN ISLAND STATEN ISLAND 31 IDA FLOOD ELIMINATION $1M - $4M 2024/01 EXT. WORK Design D021204 I.S. 72 - STATEN ISLAND STATEN ISLAND 31 IDA INTERIOR SPACES $1M - $4M 2024/01 INTERIOR Design D021461 I.S. 72 - STATEN ISLAND STATEN ISLAND 31 CONCRETE PARAPET WALL $4M OVER 2024/01 EXT. WORK Design D021461 I.S. 72 - STATEN ISLAND STATEN ISLAND 31 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021461 I.S. 72 - STATEN ISLAND STATEN ISLAND 31 ROOFS $4M OVER 2024/01 EXT. WORK Design D020275 NEW DORP HS - STATEN ISLAND STATEN ISLAND 31 RESO A FIELD UPGRADE $4M OVER 2024/03 ATHLETIC FIELDS Design D021853 P.S. 22 - STATEN ISLAND STATEN ISLAND 31 RESO A AUDITORIUM UPGRADE $250K - $500K 2024/04 AUDITORIUM UPGRADES Design D021852 P.S. 23 - STATEN ISLAND STATEN ISLAND 31 RESO A GYMNASIUM UPGRADE $250K - $500K 2024/02 GYMNASIUM Design D021967 P.S. 23 - STATEN ISLAND STATEN ISLAND 31 PATH OF TRAVEL RESO A GYMNASIUM UPGRADE $0 - $250K 2024/03 ACCESSIBILITY Design D021702 P.S. 29 - STATEN ISLAND STATEN ISLAND 31 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021702 P.S. 29 - STATEN ISLAND STATEN ISLAND 31 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021702 P.S. 29 - STATEN ISLAND STATEN ISLAND 31 ROOFS $4M OVER 2024/01 EXT. WORK Design D021191 P.S. 30 - STATEN ISLAND STATEN ISLAND 31 RESO A (MA) PLAYGROUND UPGRADE $250K - $500K 2024/04 PLAYGROUNDS Design D021618 P.S. 31 - STATEN ISLAND STATEN ISLAND 31 ROOFS $4M OVER 2024/02 EXT. WORK Design D021618 P.S. 31 - STATEN ISLAND STATEN ISLAND 31 PARAPETS $4M OVER 2024/02 EXT. WORK Design D021618 P.S. 31 - STATEN ISLAND STATEN ISLAND 31 EXTERIOR MASONRY $4M OVER 2024/02 EXT. WORK Design D021480 P.S. 32 - STATEN ISLAND STATEN ISLAND 31 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/03 PLAYGROUNDS Design D022248 P.S. 32 - STATEN ISLAND STATEN ISLAND 31 FACADE RESTORATION $750K - $1M 2024/06 EXT. WORK Design D022288 P.S. 4 - STATEN ISLAND STATEN ISLAND 31 RESO A IPDVS UPGRADE $0 - $250K 2024/04 ELECTRICAL Design D020892 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 PLANYC BOILER CONVERSION $4M OVER 2024/01 BOILER/HEAT PUMP Design D020892 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 PLANYC CLIMATE CONTROL $4M OVER 2024/01 BOILER/HEAT PUMP Design D021597 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 ROOFS $4M OVER 2024/01 EXT. WORK Design D021597 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021597 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021597 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 WINDOWS $4M OVER 2024/01 EXT. WORK Design D021716 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/02 BOILER ELECTRIFICATION Design D021716 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 ELECTRICAL SERVICE UPGRADE $4M OVER 2024/02 ELECTRICAL Design D018391 P.S. 42 - STATEN ISLAND STATEN ISLAND 31 RESO A PLAYGROUNDS $750K - $1M 2024/01 PLAYGROUNDS Design D020703 P.S. 5 - STATEN ISLAND STATEN ISLAND 31 EXISTING BUILDING WORK $1M - $4M 2024/01 OTHER Design D020703 P.S. 5 - STATEN ISLAND STATEN ISLAND 31 EXISTING BUILDING-AUD/GYM $1M - $4M 2024/01 ACCESSIBILITY Design D021689 P.S. 53 - STATEN ISLAND STATEN ISLAND 31 FLOOD ELIMINATION $1M - $4M 2024/01 EXT. WORK Design D022292 P.S. 65 - STATEN ISLAND STATEN ISLAND 31 CLOCK TOWER REPAIR @ R829 PERMANENT FIX $500K - $750K 2024/04 EXT. WORK Design D021790 P.S. 69 - STATEN ISLAND STATEN ISLAND 31 FLOOD ELIMINATION $4M OVER 2024/05 EXT. WORK Design D022330 P.S. 69 - STATEN ISLAND STATEN ISLAND 31 RESO A PA SYSTEM UPGRADE $250K - $500K 2024/06 ELECTRICAL Scope D018009 P.S. 80 - STATEN ISLAND STATEN ISLAND 31 HVAC UPGRADES $4M OVER 2024/01 BUILDING SYSTEMS Design D018009 P.S. 80 - STATEN ISLAND STATEN ISLAND 31 EMERGENCY GENERATOR REPLACEMENT $4M OVER 2024/01 ELECTRICAL Design D018009 P.S. 80 - STATEN ISLAND STATEN ISLAND 31 VENTILATION $4M OVER 2024/01 BUILDING SYSTEMS Design D018009 P.S. 80 - STATEN ISLAND STATEN ISLAND 31 BMS UPGRADE $4M OVER 2024/01 BOILER/HEAT PUMP Design D022228 P.S. 80 - STATEN ISLAND STATEN ISLAND 31 WALK-IN REFRIGERATORS AND FREEZERS $750K - $1M 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D022253 P.S. 80 - STATEN ISLAND STATEN ISLAND 31 REINFORCING SUPPORT ELEMENTS $1M - $4M 2024/04 BUILDING SYSTEMS Design D022289 THE HARBOR VIEW SCHOOL - R STATEN ISLAND 31 RESO A IPDVS UPGRADE $0 - $250K 2024/06 ELECTRICAL Design D021203 THE RICHMOND PRE-K CENTER STATEN ISLAND 31 IDA FLOOD ELIMINATION $1M - $4M 2024/01 EXT. WORK Design D021203 THE RICHMOND PRE-K CENTER STATEN ISLAND 31 IDA INTERIOR SPACES $1M - $4M 2024/01 INTERIOR Design D022275 THE RICHMOND PRE-K CENTER STATEN ISLAND 31 PATH OF TRAVEL IDA INTERIOR SPACES $0 - $250K 2024/01 ACCESSIBILITY Design D021214 TOTTENVILLE HS - STATEN ISLAND STATEN ISLAND 31 NEW FIELDHOUSE BUILDING $4M OVER 2024/03 ATHLETIC FIELDS Design D021218 TOTTENVILLE HS - STATEN ISLAND STATEN ISLAND 31 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/02 ACCESSIBILITY Design D021218 TOTTENVILLE HS - STATEN ISLAND STATEN ISLAND 31 LOW VOLTAGE ELECTRICAL SYSTEMS $4M OVER 2024/02 ELECTRICAL Design D021709 TOTTENVILLE HS - STATEN ISLAND STATEN ISLAND 31 EXTERIOR MASONRY - PERM FIX FOR RED DOT 131992 $4M OVER 2024/05 EXT. WORK Design