The projects and associated bid dates listed are for information only as they are tentative and subject to change.

To sort the projects listed, click on any column heading. To view project details in a new window, click on the Design Number. To view the detail level on another project, close the detail window, and click on a new Design Number from the summary page listed above.‚Äč

Capital Improvement Projects Anticipated Contract Awards

Data as of February 28, 2019
SchoolGeo DistrictProject Description$Estimated RangeProjected Adv dateCategoryStatus
BRONX
D018444 ALFRED E. SMITH HS - X Gymnasium
ALFRED E. SMITH HS - X07RESO A GYMNASIUM UPGRADE$250-$500K2019/03GymnasiumDesign
D018026 BRONX HS OF SCIENCE - X Electrical (Exclude RCT)
BRONX HS OF SCIENCE - X10IPDVS CAMERA INSTALLATION$250-$500K2018/12Electrical (Exclude RCT)Design
D018833 CONCOURSE VILLAGE ELEMENTARY S Ext. Work
CONCOURSE VILLAGE ELEMENTARY S07EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
CONCOURSE VILLAGE ELEMENTARY S07PARAPETS 4 M OVER2019/06Ext. WorkScope
CONCOURSE VILLAGE ELEMENTARY S07ROOFS 4 M OVER2019/06Ext. WorkScope
D018544 EAST BRONX ACADEMY FOR THE FUT Electrical (Exclude RCT)
EAST BRONX ACADEMY FOR THE FUT12IPDVS CAMERA INSTALLATION$0- $250K2018/12Electrical (Exclude RCT)Design
D018708 FORDHAM HS FOR THE ARTS - BRON Site
FORDHAM HS FOR THE ARTS - BRON10PAVED AREA CONCRETE$500-$750K2018/12SiteDesign
D018837 HERBERT H. LEHMAN HS - X Ext. Work
HERBERT H. LEHMAN HS - X08EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
HERBERT H. LEHMAN HS - X08PARAPETS 4 M OVER2019/06Ext. WorkScope
HERBERT H. LEHMAN HS - X08ROOFS 4 M OVER2019/06Ext. WorkScope
HERBERT H. LEHMAN HS - X08WINDOWS 4 M OVER2019/06OtherScope
D018731 HERO HIGH (HEALTH, EDUCATION, Room Conversions/Upgrades
HERO HIGH (HEALTH, EDUCATION,07STH SBHC 1 M - 4 M2019/05Room Conversions/UpgradesDesign
D018027 HIGH SCHOOL FOR ENERGY AND TEC Electrical (Exclude RCT)
HIGH SCHOOL FOR ENERGY AND TEC10IPDVS CAMERA INSTALLATION$0- $250K2018/12Electrical (Exclude RCT)Design
D018126 HS OF COMPUTERS & TECHNOLOGY - Electrical (Exclude RCT)
HS OF COMPUTERS & TECHNOLOGY -11ELECTRICAL WORK FOR A/C INITIATIVE$250-$500K2019/03Electrical (Exclude RCT)Design
D018570 I.S. 118 - BRONX Ext. Work
I.S. 118 - BRONX10CAST PANELS 4 M OVER2019/05Ext. WorkDesign
I.S. 118 - BRONX10FLOOD ELIMINATION 4 M OVER2019/05Ext. WorkDesign
I.S. 118 - BRONX10PARAPETS 4 M OVER2019/05Ext. WorkDesign
D018881 I.S. 118 - BRONX Building Systems
I.S. 118 - BRONX10RESO A SUPPLEMENTAL COOLING 1 M - 4 M2019/06Building SystemsScope
D018338 I.S. 127 - BRONX Auditorium Upgrades
I.S. 127 - BRONX11RESO A AUDITORIUM UPGRADE$500-$750K2019/03Auditorium UpgradesDesign
D016715 I.S. 181 - BRONX Playgrounds
I.S. 181 - BRONX11RESO A PLAYGROUND REDEVELOPMENT 1 M - 4 M2018/12PlaygroundsDesign
D018098 I.S. 22 - BRONX Playgrounds
I.S. 22 - BRONX09RESO A PLAYGROUNDS$750-1M2018/12PlaygroundsDesign
D018109 I.S. 221 - BRONX Electrical (Exclude RCT)
I.S. 221 - BRONX07ELECTRICAL WORK FOR A/C INITIATIVE$500-$750K2019/04Electrical (Exclude RCT)Scope
D018830 I.S. 224 - BRONX Ext. Work
I.S. 224 - BRONX07EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
I.S. 224 - BRONX07FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
I.S. 224 - BRONX07PARAPETS 4 M OVER2019/06Ext. WorkScope
D017614 I.S. 229 - BRONX Room Conversions/Upgrades
I.S. 229 - BRONX09STH SBHC 1 M - 4 M2018/12Room Conversions/UpgradesDesign
D017994 I.S. 232 - BRONX Ext. Work
I.S. 232 - BRONX09EXTERIOR MASONRY 4 M OVER2019/01Ext. WorkDesign
I.S. 232 - BRONX09PARAPETS 4 M OVER2019/01Ext. WorkDesign
I.S. 232 - BRONX09ROOFS 4 M OVER2019/01Ext. WorkDesign
D018024 I.S. 267 - BRONX Electrical (Exclude RCT)
I.S. 267 - BRONX12IPDVS CAMERA INSTALLATION$0- $250K2018/12Electrical (Exclude RCT)Design
D017884 I.S. 302 - BRONX Ext. Work
I.S. 302 - BRONX08FLOOD ELIMINATION 1 M - 4 M2019/04Ext. WorkDesign
D018827 I.S. 424 - BRONX Ext. Work
I.S. 424 - BRONX08EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
I.S. 424 - BRONX08FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
I.S. 424 - BRONX08PARAPETS 4 M OVER2019/06Ext. WorkScope
I.S. 424 - BRONX08ROOFS 4 M OVER2019/06Ext. WorkScope
D018190 I.S. 529 - BRONX Electrical (Exclude RCT)
I.S. 529 - BRONX11ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/06Electrical (Exclude RCT)Scope
D018122 I.S. 556 - BRONX Electrical (Exclude RCT)
I.S. 556 - BRONX11ELECTRICAL WORK FOR A/C INITIATIVE$500-$750K2019/04Electrical (Exclude RCT)Scope
D018723 I.S. 562 - BRONX Boilers/Heating Plant Upgrade
I.S. 562 - BRONX08PLANYC BOILER CONVERSION 4 M OVER2019/06Boilers/Heating Plant UpgradeScope
I.S. 562 - BRONX08PLANYC CLIMATE CONTROL 4 M OVER2019/06Building SystemsScope
D018564 JILL CHAIFETZ TRANSFER HIGH SC Electrical (Exclude RCT)
JILL CHAIFETZ TRANSFER HIGH SC07ELECTRICAL WORK FOR A/C INITIATIVE 1 M - 4 M2019/06Electrical (Exclude RCT)Scope
D017883 LONGWOOD PREPARATORY ACADEMY Ext. Work
LONGWOOD PREPARATORY ACADEMY08FLOOD ELIMINATION$500-$750K2019/03Ext. WorkDesign
D017291 M.S./H.S. 141 - BRONX Auditorium Upgrades
M.S./H.S. 141 - BRONX10RESO A AUDITORIUM UPGRADE 1 M - 4 M2018/12Auditorium UpgradesDesign
D018060 M.S./H.S. 141 - BRONX Electrical (Exclude RCT)
M.S./H.S. 141 - BRONX10IPDVS CAMERA INSTALLATION$250-$500K2018/12Electrical (Exclude RCT)Design
D018831 M.S./H.S. 141 - BRONX Ext. Work
M.S./H.S. 141 - BRONX10PARAPETS 4 M OVER2019/06Ext. WorkScope
M.S./H.S. 141 - BRONX10ROOFS 4 M OVER2019/06Ext. WorkScope
D018192 M.S./H.S. 342 - BRONX Electrical (Exclude RCT)
M.S./H.S. 342 - BRONX10ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/03Electrical (Exclude RCT)Design
D017511 NORTH BRONX SCHOOL OF EMPOWERM Room Conversions/Upgrades
NORTH BRONX SCHOOL OF EMPOWERM11RESO A MUSIC ROOM UPGRADE$250-$500K2018/12Room Conversions/UpgradesDesign
D018563 P.S. 105 - BRONX Electrical (Exclude RCT)
P.S. 105 - BRONX11ELECTRICAL WORK FOR A/C INITIATIVE$250-$500K2019/03Electrical (Exclude RCT)Design
D018549 P.S. 109 - BRONX Auditorium Upgrades
P.S. 109 - BRONX09RESO A AUDITORIUM UPGRADE$250-$500K2019/06Auditorium UpgradesScope
D018721 P.S. 114 - BRONX Boilers/Heating Plant Upgrade
P.S. 114 - BRONX09PLANYC BOILER CONVERSION 4 M OVER2019/05Boilers/Heating Plant UpgradeDesign
P.S. 114 - BRONX09PLANYC CLIMATE CONTROL 4 M OVER2019/05Building SystemsDesign
D018101 P.S. 119 - BRONX Electrical (Exclude RCT)
P.S. 119 - BRONX08ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/04Electrical (Exclude RCT)Scope
D018828 P.S. 121 - BRONX Ext. Work
P.S. 121 - BRONX11EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 121 - BRONX11FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 121 - BRONX11PARAPETS 4 M OVER2019/06Ext. WorkScope
D018524 P.S. 14 - BRONX Ext. Work
P.S. 14 - BRONX08EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkDesign
P.S. 14 - BRONX08FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkDesign
P.S. 14 - BRONX08PARAPETS 4 M OVER2019/06Ext. WorkDesign
P.S. 14 - BRONX08WINDOWS 4 M OVER2019/06OtherDesign
D018832 P.S. 146 - BRONX Ext. Work
P.S. 146 - BRONX08EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 146 - BRONX08FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 146 - BRONX08PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 146 - BRONX08ROOFS 4 M OVER2019/06Ext. WorkScope
D018839 P.S. 153 - BRONX Building Systems
P.S. 153 - BRONX11CHILLER REPLACEMENT$0- $250K2019/03Building SystemsDesign
D018861 P.S. 153 - BRONX Playgrounds
P.S. 153 - BRONX11RESO A PLAYGROUND$500-$750K2019/07PlaygroundsScope
D018656 P.S. 161 - BRONX Accessibility
P.S. 161 - BRONX07FULL ACCESSIBILITY 4 M OVER2019/05AccessibilityDesign
D018862 P.S. 170 - BRONX Playgrounds
P.S. 170 - BRONX09RESO A PLAYGROUND$500-$750K2019/07PlaygroundsScope
D018838 P.S. 18 - BRONX Electrical (Exclude RCT)
P.S. 18 - BRONX07ELECTRICAL WORK FOR A/C INITIATIVE$250-$500K2019/03Electrical (Exclude RCT)Design
D017977 P.S. 182 - BRONX Site
P.S. 182 - BRONX08PAVED AREAS- CONCRETE 4 M OVER2019/03SiteDesign
P.S. 182 - BRONX08PLUMBING 4 M OVER2019/03Building SystemsDesign
P.S. 182 - BRONX08REINFORCING SUPPORT ELEMENTS 4 M OVER2019/03Building SystemsDesign
D018834 P.S. 182 - BRONX Ext. Work
P.S. 182 - BRONX08EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 182 - BRONX08FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 182 - BRONX08ROOFS 4 M OVER2019/06Ext. WorkScope
D018667 P.S. 205 - BRONX Gymnasium
P.S. 205 - BRONX10STANDALONE GYM ANNEX 4 M OVER2019/03GymnasiumDesign
D018835 P.S. 209 - BRONX Ext. Work
P.S. 209 - BRONX10EXTERIOR MASONRY 1 M - 4 M2019/06Ext. WorkScope
P.S. 209 - BRONX10FLOOD ELIMINATION 1 M - 4 M2019/06Ext. WorkScope
P.S. 209 - BRONX10PARAPETS 1 M - 4 M2019/06Ext. WorkScope
P.S. 209 - BRONX10ROOFS 1 M - 4 M2019/06Ext. WorkScope
D018073 P.S. 21 - BRONX Site
P.S. 21 - BRONX11DETERIORATED RETAINING WALLS 1 M - 4 M2018/12SiteDesign
D018820 P.S. 23 - BRONX Ext. Work
P.S. 23 - BRONX10EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 23 - BRONX10FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 23 - BRONX10PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 23 - BRONX10ROOFS 4 M OVER2019/06Ext. WorkScope
D018435 P.S. 246 - BRONX Science Lab Upgrades
P.S. 246 - BRONX10RESO A SCIENCE LAB UPGRADES$500-$750K2019/01Science Lab UpgradesDesign
D018587 P.S. 246 - BRONX Gymnasium
P.S. 246 - BRONX10GYM STANDALONE GYM ANNEX 4 M OVER2018/12GymnasiumDesign
D018821 P.S. 277 - BRONX Ext. Work
P.S. 277 - BRONX07EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 277 - BRONX07FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 277 - BRONX07ROOFS 4 M OVER2019/06Ext. WorkScope
D017783 P.S. 28 - BRONX Building Systems
P.S. 28 - BRONX09DETERIORATED METAL ARCH CEILING & BEAMS$750-1M2019/04Building SystemsDesign
P.S. 28 - BRONX09WATER INFILTRATION$750-1M2019/04Ext. WorkDesign
D018655 P.S. 28 - BRONX Accessibility
P.S. 28 - BRONX09FULL / PARTIAL ACCESSIBILITY 4 M OVER2019/06AccessibilityDesign
D018836 P.S. 306 - BRONX Ext. Work
P.S. 306 - BRONX10EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 306 - BRONX10FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 306 - BRONX10PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 306 - BRONX10ROOFS 4 M OVER2019/06Ext. WorkScope
D018071 P.S. 310 - BRONX Ext. Work
P.S. 310 - BRONX10FLOOD ELIMINATION 1 M - 4 M2019/07Ext. WorkScope
D018860 P.S. 344 - BRONX Playgrounds
P.S. 344 - BRONX10RESO A PLAYGROUND$250-$500K2019/06PlaygroundsDesign
D018823 P.S. 41 - BRONX Ext. Work
P.S. 41 - BRONX11EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 41 - BRONX11FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 41 - BRONX11PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 41 - BRONX11ROOFS 4 M OVER2019/06Ext. WorkScope
D017981 P.S. 53 - BRONX Ext. Work
P.S. 53 - BRONX09EXTERIOR MASONRY 4 M OVER2018/12Ext. WorkDesign
P.S. 53 - BRONX09PARAPETS 4 M OVER2018/12Ext. WorkDesign
D018094 P.S. 54 - BRONX Auditorium Upgrades
P.S. 54 - BRONX10RESO A AUDITORIUM UPGRADE$500-$750K2019/03Auditorium UpgradesDesign
D018080 P.S. 58 - BRONX Ext. Work
P.S. 58 - BRONX09FLOOD ELIMINATION 4 M OVER2019/04Ext. WorkDesign
D018654 P.S. 58 - BRONX Accessibility
P.S. 58 - BRONX09FULL ACCESSIBILITY 1 M - 4 M2019/06AccessibilityDesign
D018824 P.S. 58 - BRONX Ext. Work
P.S. 58 - BRONX09EXTERIOR MASONRY 1 M - 4 M2019/06Ext. WorkScope
D018825 P.S. 61 - BRONX Ext. Work
P.S. 61 - BRONX12EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 61 - BRONX12FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 61 - BRONX12PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 61 - BRONX12ROOFS 4 M OVER2019/06Ext. WorkScope
D018095 P.S. 63 - BRONX Auditorium Upgrades
P.S. 63 - BRONX09RESO A AUDITORIUM UPGRADE$500-$750K2019/05Auditorium UpgradesDesign
D017259 P.S. 65 - BRONX Auditorium Upgrades
P.S. 65 - BRONX07RESO A AUDITORIUM UPGRADE$750-1M2018/12Auditorium UpgradesDesign
D018668 P.S. 65 - BRONX Gymnasium
P.S. 65 - BRONX07STANDALONE GYM ANNEX 4 M OVER2019/03GymnasiumDesign
D018687 P.S. 65 - BRONX Ext. Work
P.S. 65 - BRONX07AUDITORIUM LEAKS 1 M - 4 M2019/06Ext. WorkScope
D018730 P.S. 67 - BRONX Room Conversions/Upgrades
P.S. 67 - BRONX12STH SBHC 1 M - 4 M2019/05Room Conversions/UpgradesDesign
D018826 P.S. 67 - BRONX Ext. Work
P.S. 67 - BRONX12EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 67 - BRONX12FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 67 - BRONX12PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 67 - BRONX12ROOFS 4 M OVER2019/06Ext. WorkScope
P.S. 67 - BRONX12WINDOWS 4 M OVER2019/06OtherScope
D018850 P.S. 75 - BRONX Building Systems
P.S. 75 - BRONX08RESO A SUPPLEMENTAL COOLING 1 M - 4 M2019/04Building SystemsDesign
D017466 P.S. 78 - BRONX Ext. Work
P.S. 78 - BRONX11EXTERIOR MASONRY 4 M OVER2019/01Ext. WorkDesign
P.S. 78 - BRONX11FLOOD ELIMINATION 4 M OVER2019/01Ext. WorkDesign
P.S. 78 - BRONX11PARAPETS 4 M OVER2019/01Ext. WorkDesign
D018624 P.S. 81 - BRONX Ext. Work
P.S. 81 - BRONX10WATER INFILTRATION 4 M OVER2019/06Ext. WorkScope
D018466 P.S. 9 - BRONX Ext. Work
P.S. 9 - BRONX10CRACKED MASONRY 4 M OVER2019/05Ext. WorkDesign
P.S. 9 - BRONX10PARAPETS 4 M OVER2019/05Ext. WorkDesign
D018187 P.S. 92 - BRONX Electrical (Exclude RCT)
P.S. 92 - BRONX12ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/03Electrical (Exclude RCT)Design
D018919 P.S./I.S. 218 - BRONX Science Lab Upgrades
P.S./I.S. 218 - BRONX09RESO A SCIENCE LAB UPGRADES$250-$500K2019/06Science Lab UpgradesScope
D018691 SCHOOL FOR TOURISM AND HOSPITA Playgrounds
SCHOOL FOR TOURISM AND HOSPITA08TCU REMOVAL/PLAYGROUND REDEVELOPMENT 1 M - 4 M2019/06PlaygroundsScope
D018692 UNIVERSITY HEIGHTS HS - BRONX Playgrounds
UNIVERSITY HEIGHTS HS - BRONX07TCU REMOVAL/PLAYGROUND REDEVELOPMENT 1 M - 4 M2019/06PlaygroundsScope
D018125 WORLD CULTURES HS - X Electrical (Exclude RCT)
WORLD CULTURES HS - X12ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/01Electrical (Exclude RCT)Design
D018647 X188 SPED - BRONX Ext. Work
X188 SPED - BRONX08MASONRY 4 M OVER2019/04Ext. WorkDesign
X188 SPED - BRONX08PARAPETS 4 M OVER2019/04Ext. WorkDesign
X188 SPED - BRONX08ROOFS 4 M OVER2019/04Ext. WorkDesign
D018822 X188 SPED - BRONX Ext. Work
X188 SPED - BRONX10EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
X188 SPED - BRONX10FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
X188 SPED - BRONX10PARAPETS 4 M OVER2019/06Ext. WorkScope
X188 SPED - BRONX10ROOFS 4 M OVER2019/06Ext. WorkScope
BROOKLYN
D017684 ACADEMY OF INNOV TECH - BROOKL Auditorium Upgrades
ACADEMY OF INNOV TECH - BROOKL19ENY AUDITORIUM UPGRADE 1 M - 4 M2018/12Auditorium UpgradesDesign
D018497 ACADEMY OF INNOV TECH - BROOKL Gymnasium
ACADEMY OF INNOV TECH - BROOKL19RESO A GYMNASIUM UPGRADE$250-$500K2018/12GymnasiumDesign
D018153 AUTOMOTIVE TRADES VOC HS - K Electrical (Exclude RCT)
AUTOMOTIVE TRADES VOC HS - K14ELECTRICAL WORK FOR A/C INITIATIVE 1 M - 4 M2019/01Electrical (Exclude RCT)Design
D018741 AUTOMOTIVE TRADES VOC HS - K Ext. Work
AUTOMOTIVE TRADES VOC HS - K14EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
AUTOMOTIVE TRADES VOC HS - K14FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
AUTOMOTIVE TRADES VOC HS - K14PARAPETS 4 M OVER2019/06Ext. WorkScope
AUTOMOTIVE TRADES VOC HS - K14ROOFS 4 M OVER2019/06Ext. WorkScope
AUTOMOTIVE TRADES VOC HS - K14WINDOWS 4 M OVER2019/06OtherScope
D018310 BED-STUYVESANT PREPARATORY HS Ext. Work
BED-STUYVESANT PREPARATORY HS13PARAPETS 4 M OVER2019/03Ext. WorkDesign
BED-STUYVESANT PREPARATORY HS13ROOFS 4 M OVER2019/03Ext. WorkDesign
K373 SPED - BROOKLYN13EXTERIOR MASONRY 4 M OVER2019/03Ext. WorkDesign
D018145 BROOKLYN GARDENS ELEMENTARY SC Electrical (Exclude RCT)
BROOKLYN GARDENS ELEMENTARY SC19ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/05Electrical (Exclude RCT)Scope
D017943 BROOKLYN TECH HS - K Boilers/Heating Plant Upgrade
BROOKLYN TECH HS - K13BOILER WORK 4 M OVER2019/05Boilers/Heating Plant UpgradeDesign
D018548 BROOKLYN TECH HS - K Science Lab Upgrades
BROOKLYN TECH HS - K13SCIENCE LAB UPGRADE 1 M - 4 M2019/05Science Lab UpgradesDesign
D018635 BROOKLYN TECH HS - K Electrical (Exclude RCT)
BROOKLYN TECH HS - K13PA SYSTEM 1 M - 4 M2019/06Electrical (Exclude RCT)Scope
D018234 BROOKLYN THEATRE ARTS H.S. - K Electrical (Exclude RCT)
BROOKLYN THEATRE ARTS H.S. - K18ELECTRICAL WORK FOR A/C INITIATIVE$250-$500K2018/12Electrical (Exclude RCT)Design
D015344 BUSHWICK LEADERS - K Other
BUSHWICK LEADERS - K32CERTIFICATE OF OCCUPANCY 4 M OVER2019/03OtherDesign
BUSHWICK LEADERS - K32FIRE SPRINKLER SYSTEM 4 M OVER2019/03OtherDesign
D018976 COBBLE HILL SCHL OF AMER. STU Boilers/Heating Plant Upgrade
COBBLE HILL SCHL OF AMER. STU15LSP REPLACE DOMESTIC HOT WATER HEATER$0- $250K2019/05Boilers/Heating Plant UpgradeScope
D018492 DISTRICT 20 PRE-K CENTER Building Systems
DISTRICT 20 PRE-K CENTER20BACKFLOW PREVENTION DEVICES$250-$500K2019/01Building SystemsDesign
D018340 EAST FLATBUSH COMMUNITY RESCH Auditorium Upgrades
EAST FLATBUSH COMMUNITY RESCH18RESO A AUDITORIUM UPGRADE$250-$500K2018/12Auditorium UpgradesDesign
D018008 EDWARD R. MURROW HS - K Electrical (Exclude RCT)
EDWARD R. MURROW HS - K21IPDVS CAMERA INSTALLATION$250-$500K2018/12Electrical (Exclude RCT)Design
D018007 FORT HAMILTON HS - K Electrical (Exclude RCT)
FORT HAMILTON HS - K20IPDVS CAMERA INSTALLATION$250-$500K2018/12Electrical (Exclude RCT)Design
D018205 GEORGE WESTINGHOUSE VOC. HS Electrical (Exclude RCT)
GEORGE WESTINGHOUSE VOC. HS13ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/03Electrical (Exclude RCT)Design
D018202 H.S. 745 - BROOKLYN Electrical (Exclude RCT)
H.S. 745 - BROOKLYN17ELECTRICAL WORK FOR A/C INITIATIVE$250-$500K2019/03Electrical (Exclude RCT)Design
D018129 I.S. 136 - BROOKLYN Electrical (Exclude RCT)
I.S. 136 - BROOKLYN15ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2018/12Electrical (Exclude RCT)Design
D018144 I.S. 171 - BROOKLYN Electrical (Exclude RCT)
I.S. 171 - BROOKLYN19ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2018/12Electrical (Exclude RCT)Design
D018770 I.S. 2 - BROOKLYN Ext. Work
I.S. 2 - BROOKLYN17EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
I.S. 2 - BROOKLYN17PARAPETS 4 M OVER2019/06Ext. WorkScope
I.S. 2 - BROOKLYN17ROOFS 4 M OVER2019/06Ext. WorkScope
I.S. 2 - BROOKLYN17WINDOWS 4 M OVER2019/06OtherScope
D018903 I.S. 2 - BROOKLYN Building Systems
I.S. 2 - BROOKLYN17CONDENSING UNITS DX COILS REPLACEMENT$500-$750K2019/06Building SystemsScope
D018450 I.S. 201 - BROOKLYN Room Conversions/Upgrades
I.S. 201 - BROOKLYN20RESO A ROOM CONVERSION 1 M - 4 M2019/04Room Conversions/UpgradesDesign
D018780 I.S. 223 - BROOKLYN Ext. Work
I.S. 223 - BROOKLYN20EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
I.S. 223 - BROOKLYN20FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
I.S. 223 - BROOKLYN20PARAPETS 4 M OVER2019/06Ext. WorkScope
I.S. 223 - BROOKLYN20ROOFS 4 M OVER2019/06Ext. WorkScope
D018783 I.S. 240 - BROOKLYN Ext. Work
I.S. 240 - BROOKLYN22EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
I.S. 240 - BROOKLYN22FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
I.S. 240 - BROOKLYN22PARAPETS 4 M OVER2019/06Ext. WorkScope
I.S. 240 - BROOKLYN22ROOFS 4 M OVER2019/06Ext. WorkScope
I.S. 240 - BROOKLYN22WINDOWS 4 M OVER2019/06OtherScope
D018784 I.S. 246 - BROOKLYN Ext. Work
I.S. 246 - BROOKLYN17EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
I.S. 246 - BROOKLYN17FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
I.S. 246 - BROOKLYN17PARAPETS 4 M OVER2019/06Ext. WorkScope
D018684 I.S. 340 - BROOKLYN Playgrounds
I.S. 340 - BROOKLYN13UPE- PLAYGROUND$500-$750K2019/04PlaygroundsDesign
D018437 I.S. 351 - BROOKLYN Science Lab Upgrades
I.S. 351 - BROOKLYN13RESO A COURTYARD GREENHOUSE 1 M - 4 M2019/06Science Lab UpgradesDesign
D018693 I.S. 51 - BROOKLYN Ext. Work
I.S. 51 - BROOKLYN15PARAPET 4 M OVER2019/06Ext. WorkScope
D018776 I.S. 61 - BROOKLYN Ext. Work
I.S. 61 - BROOKLYN17EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
I.S. 61 - BROOKLYN17PARAPETS 4 M OVER2019/06Ext. WorkScope
I.S. 61 - BROOKLYN17ROOFS 4 M OVER2019/06Ext. WorkScope
I.S. 61 - BROOKLYN17WINDOWS 4 M OVER2019/06OtherScope
D018139 I.S. 62 - BROOKLYN Electrical (Exclude RCT)
I.S. 62 - BROOKLYN20ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/03Electrical (Exclude RCT)Design
D018574 I.S. 71 - BROOKLYN Ext. Work
I.S. 71 - BROOKLYN14WATER INFILTRATION 1 M - 4 M2019/05Ext. WorkDesign
D018925 I.S. 821 - BROOKLYN Auditorium Upgrades
I.S. 821 - BROOKLYN15RESO A AUDITORIUM UPGRADE$250-$500K2019/06Auditorium UpgradesScope
D018737 IT TAKES A VILLAGE ACADEMY - K Ext. Work
IT TAKES A VILLAGE ACADEMY - K18EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
IT TAKES A VILLAGE ACADEMY - K18FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
IT TAKES A VILLAGE ACADEMY - K18PARAPETS 4 M OVER2019/06Ext. WorkScope
IT TAKES A VILLAGE ACADEMY - K18ROOFS 4 M OVER2019/06Ext. WorkScope
D018004 JAMES MADISON HS - BROOKLYN Electrical (Exclude RCT)
JAMES MADISON HS - BROOKLYN22IPDVS CAMERA INSTALLATION$0- $250K2018/12Electrical (Exclude RCT)Design
D018738 JOHN DEWEY HS - BROOKLYN Ext. Work
JOHN DEWEY HS - BROOKLYN21EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
JOHN DEWEY HS - BROOKLYN21ROOFS 4 M OVER2019/06Ext. WorkScope
JOHN DEWEY HS - BROOKLYN21WINDOWS 4 M OVER2019/06OtherScope
D018434 K053 SPED - BROOKLYN Room Conversions/Upgrades
K053 SPED - BROOKLYN19RESO A ROOM CONVERSIONS/PARTITIONING$250-$500K2019/03Room Conversions/UpgradesDesign
D018448 K368 SPED - BROOKLYN Room Conversions/Upgrades
K368 SPED - BROOKLYN14RESO A ROOM CONVERSIONS/PARTITIONING$250-$500K2019/03Room Conversions/UpgradesDesign
D018000 K396 SPED - BROOKLYN Electrical (Exclude RCT)
K396 SPED - BROOKLYN23RESO A IPDVS CAMERA INSTALLATION$250-$500K2019/05Electrical (Exclude RCT)Design
D018787 K721 SPED - BROOKLYN Ext. Work
K721 SPED - BROOKLYN21EXTERIOR MASONRY 1 M - 4 M2019/06Ext. WorkScope
D018254 K811 SPED - BROOKLYN Electrical (Exclude RCT)
K811 SPED - BROOKLYN22RESO A IPDVS CAMERA INSTALLATION$0- $250K2019/06Electrical (Exclude RCT)Design
D018252 KINGSBOROUGH EARLY COLLEGE SCH Auditorium Upgrades
KINGSBOROUGH EARLY COLLEGE SCH21RESO A AUDITORIUM UPGRADE 1 M - 4 M2019/03Auditorium UpgradesDesign
D018556 KINGSBOROUGH EARLY COLLEGE SCH Electrical (Exclude RCT)
KINGSBOROUGH EARLY COLLEGE SCH21ELECTRICAL WORK FOR A/C INITIATIVE$500-$750K2019/03Electrical (Exclude RCT)Design
D018764 KINGSBOROUGH EARLY COLLEGE SCH Ext. Work
KINGSBOROUGH EARLY COLLEGE SCH21ROOF 4 M OVER2019/06Ext. WorkScope
D017824 MIDWOOD H.S. Building Systems
MIDWOOD H.S.22RESO A SUPPLEMENTAL COOLING 1 M - 4 M2018/12Building SystemsDesign
D018005 NEW UTRECHT HS - BROOKLYN Electrical (Exclude RCT)
NEW UTRECHT HS - BROOKLYN20IPDVS CAMERA INSTALLATION$0- $250K2018/12Electrical (Exclude RCT)Design
D018697 NEW UTRECHT HS - BROOKLYN Ext. Work
NEW UTRECHT HS - BROOKLYN20WATER PENETRATION$250-$500K2019/06Ext. WorkScope
D018610 P.S. 1 - BROOKLYN Electrical (Exclude RCT)
P.S. 1 - BROOKLYN15PUBLIC ADDRESS/CLOCK SYSTEM$250-$500K2019/03Electrical (Exclude RCT)Design
D018922 P.S. 1 - BROOKLYN Auditorium Upgrades
P.S. 1 - BROOKLYN15RESO A AUDITORIUM UPGRADE$250-$500K2019/06Auditorium UpgradesScope
D017497 P.S. 104 - BROOKLYN Boilers/Heating Plant Upgrade
P.S. 104 - BROOKLYN20PLANYC BOILER CONVERSION 4 M OVER2018/12Boilers/Heating Plant UpgradeDesign
P.S. 104 - BROOKLYN20PLANYC CLIMATE CONTROL 4 M OVER2018/12Building SystemsDesign
D018772 P.S. 11 - BROOKLYN Ext. Work
P.S. 11 - BROOKLYN13EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 11 - BROOKLYN13FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 11 - BROOKLYN13PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 11 - BROOKLYN13ROOFS 4 M OVER2019/06Ext. WorkScope
D017996 P.S. 127 - BROOKLYN Other
P.S. 127 - BROOKLYN20PHASE 3 VOLUNTARY ADA/ROOM CONVERSION WORK$250-$500K2018/12OtherDesign
D018072 P.S. 135 - BROOKLYN Ext. Work
P.S. 135 - BROOKLYN18FACADE 4 M OVER2019/03Ext. WorkDesign
P.S. 135 - BROOKLYN18PARAPETS 4 M OVER2019/03Ext. WorkDesign
P.S. 135 - BROOKLYN18ROOFS 4 M OVER2019/03Ext. WorkDesign
P.S. 135 - BROOKLYN18STRUCTURAL DEFECTS 4 M OVER2019/03Ext. WorkDesign
D018778 P.S. 138 - BROOKLYN Ext. Work
P.S. 138 - BROOKLYN17EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 138 - BROOKLYN17FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 138 - BROOKLYN17PARAPETS 4 M OVER2019/06Ext. WorkScope
D017997 P.S. 145 - BROOKLYN Ext. Work
P.S. 145 - BROOKLYN32EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 145 - BROOKLYN32ROOFS 4 M OVER2019/06Ext. WorkScope
P.S. 145 - BROOKLYN32WATER INFILTRATION 4 M OVER2019/06Ext. WorkScope
P.S. 145 - BROOKLYN32WINDOWS 4 M OVER2019/06OtherScope
D017540 P.S. 147 - BROOKLYN Ext. Work
P.S. 147 - BROOKLYN14WATER INFILTRATION 4 M OVER2019/05Ext. WorkDesign
D018852 P.S. 147 - BROOKLYN Playgrounds
P.S. 147 - BROOKLYN14RESO A PLAYGROUND$250-$500K2019/06PlaygroundsScope
D018788 P.S. 149 - BROOKLYN Ext. Work
P.S. 149 - BROOKLYN19PARAPETS 1 M - 4 M2019/06Ext. WorkScope
P.S. 149 - BROOKLYN19ROOFS 1 M - 4 M2019/06Ext. WorkScope
D018773 P.S. 15 - BROOKLYN Ext. Work
P.S. 15 - BROOKLYN15EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 15 - BROOKLYN15ROOFS 4 M OVER2019/06Ext. WorkScope
P.S. 15 - BROOKLYN15WINDOWS 4 M OVER2019/06OtherScope
D018974 P.S. 151 - BROOKLYN Boilers/Heating Plant Upgrade
P.S. 151 - BROOKLYN32LSP WATER HEATER$0- $250K2019/05Boilers/Heating Plant UpgradeScope
D018479 P.S. 152 - BROOKLYN Playgrounds
P.S. 152 - BROOKLYN22RESO A PLAYGROUND UPGRADE$0- $250K2019/01PlaygroundsDesign
D018142 P.S. 158 - BROOKLYN Electrical (Exclude RCT)
P.S. 158 - BROOKLYN19ELECTRICAL WORK FOR A/C INITIATIVE$250-$500K2019/04Electrical (Exclude RCT)Design
D018779 P.S. 158 - BROOKLYN Ext. Work
P.S. 158 - BROOKLYN19FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 158 - BROOKLYN19PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 158 - BROOKLYN19WINDOWS 4 M OVER2019/06OtherScope
D018676 P.S. 159 - BROOKLYN Gymnasium
P.S. 159 - BROOKLYN19STANDALONE GYM ANNEX 4 M OVER2019/03GymnasiumDesign
D018700 P.S. 159 - BROOKLYN Playgrounds
P.S. 159 - BROOKLYN19TCU REMOVAL/PLAYGROUND REDEVELOPMENT 1 M - 4 M2019/03PlaygroundsDesign
D018218 P.S. 160 - BROOKLYN Electrical (Exclude RCT)
P.S. 160 - BROOKLYN20ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/06Electrical (Exclude RCT)Scope
D018658 P.S. 169 - BROOKLYN Accessibility
P.S. 169 - BROOKLYN15FULL ACCESSIBILITY 4 M OVER2019/05AccessibilityDesign
D018926 P.S. 169 - BROOKLYN Auditorium Upgrades
P.S. 169 - BROOKLYN15RESO A AUDITORIUM UPGRADE$250-$500K2019/06Auditorium UpgradesScope
D018671 P.S. 17 - BROOKLYN Gymnasium
P.S. 17 - BROOKLYN14STANDALONE GYM ANNEX 4 M OVER2019/03GymnasiumDesign
D018989 P.S. 170 - BROOKLYN Building Systems
P.S. 170 - BROOKLYN20REINFORCING SUPPORT ELEMENTS 1 M - 4 M2019/05Building SystemsDesign
D018675 P.S. 172 - BROOKLYN Gymnasium
P.S. 172 - BROOKLYN15STANDALONE GYM ANNEX 4 M OVER2019/04GymnasiumDesign
D018603 P.S. 177 - BROOKLYN Playgrounds
P.S. 177 - BROOKLYN21PLANYC PLAYGROUND REDEVELOPMENT 1 M - 4 M2019/06PlaygroundsDesign
D018709 P.S. 181 - BROOKLYN Ext. Work
P.S. 181 - BROOKLYN17FLOOD ELIMINATION 1 M - 4 M2019/06Ext. WorkScope
D017959 P.S. 184 - BROOKLYN Playgrounds
P.S. 184 - BROOKLYN23PLAYGROUND SURFACES 1 M - 4 M2019/03PlaygroundsDesign
D018736 P.S. 184 - BROOKLYN Ext. Work
P.S. 184 - BROOKLYN23EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 184 - BROOKLYN23PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 184 - BROOKLYN23ROOFS 4 M OVER2019/06Ext. WorkScope
D018661 P.S. 190 - BROOKLYN Gymnasium
P.S. 190 - BROOKLYN19STANDALONE GYM ANNEX 4 M OVER2019/03GymnasiumDesign
D018869 P.S. 193 - BROOKLYN Library Upgrades
P.S. 193 - BROOKLYN22RESO A LIBRARY UPGRADE$250-$500K2019/06Library UpgradesScope
D018975 P.S. 193 - BROOKLYN Boilers/Heating Plant Upgrade
P.S. 193 - BROOKLYN22LSP PVI DOMESTIC WATER HEATER$0- $250K2019/05Boilers/Heating Plant UpgradeScope
D018643 P.S. 196 - BROOKLYN Ext. Work
P.S. 196 - BROOKLYN14DEFECTIVE FACADE 1 M - 4 M2019/06Ext. WorkDesign
P.S. 196 - BROOKLYN14DEFECTIVE FOUNDATION WALLS- WATER INFILTRATION 1 M - 4 M2019/06Ext. WorkDesign
D015290 P.S. 219 - BROOKLYN Boilers/Heating Plant Upgrade
P.S. 219 - BROOKLYN18BOILER REPLACEMENT 1 M - 4 M2018/12Boilers/Heating Plant UpgradeDesign
D018879 P.S. 222 - BROOKLYN Building Systems
P.S. 222 - BROOKLYN22RESO A SUPPLEMENTAL COOLING$0- $250K2019/06Building SystemsScope
D018781 P.S. 229 - BROOKLYN Ext. Work
P.S. 229 - BROOKLYN20EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 229 - BROOKLYN20FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 229 - BROOKLYN20PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 229 - BROOKLYN20ROOFS 4 M OVER2019/06Ext. WorkScope
D018840 P.S. 23 - BROOKLYN Building Systems
P.S. 23 - BROOKLYN14RESO A SUPPLEMENTAL COOLING$250-$500K2019/05Building SystemsDesign
D018782 P.S. 230 - BROOKLYN Ext. Work
P.S. 230 - BROOKLYN15EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 230 - BROOKLYN15PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 230 - BROOKLYN15ROOFS 4 M OVER2019/06Ext. WorkScope
D018389 P.S. 24 - BROOKLYN Playgrounds
P.S. 24 - BROOKLYN15RESO A PLAYGROUNDS$250-$500K2019/04PlaygroundsDesign
D018774 P.S. 24 - BROOKLYN Ext. Work
P.S. 24 - BROOKLYN15PARAPETS 1 M - 4 M2019/06Ext. WorkScope
D018494 P.S. 241 - BROOKLYN Building Systems
P.S. 241 - BROOKLYN17LSP BACKFLOW PREVENTION DEVICES$250-$500K2019/03Building SystemsDesign
D018220 P.S. 244 - BROOKLYN Electrical (Exclude RCT)
P.S. 244 - BROOKLYN18ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/05Electrical (Exclude RCT)Design
D018257 P.S. 247 - BROOKLYN Ext. Work
P.S. 247 - BROOKLYN20TERRA COTTA 4 M OVER2019/06Ext. WorkScope
D018634 P.S. 25 - BROOKLYN Playgrounds
P.S. 25 - BROOKLYN16PLAY YARD 1 M - 4 M2019/05PlaygroundsDesign
D017809 P.S. 251 - BROOKLYN Building Systems
P.S. 251 - BROOKLYN22PLANYC CLIMATE CONTROL 4 M OVER2019/03Building SystemsDesign
P.S. 251 - BROOKLYN22PlaNYC Boiler Conversion 4 M OVER2019/03Boilers/Heating Plant UpgradeDesign
D018785 P.S. 255 - BROOKLYN Ext. Work
P.S. 255 - BROOKLYN22EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 255 - BROOKLYN22PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 255 - BROOKLYN22ROOFS 4 M OVER2019/06Ext. WorkScope
P.S. 255 - BROOKLYN22WINDOWS 4 M OVER2019/06OtherScope
D018694 P.S. 261 - BROOKLYN Ext. Work
P.S. 261 - BROOKLYN15WATER INFILTRATION 1 M - 4 M2019/06Ext. WorkScope
D018149 P.S. 268 - BROOKLYN Electrical (Exclude RCT)
P.S. 268 - BROOKLYN18ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/05Electrical (Exclude RCT)Design
D018104 P.S. 272 - BROOKLYN Electrical (Exclude RCT)
P.S. 272 - BROOKLYN18ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/03Electrical (Exclude RCT)Design
D018307 P.S. 274 - BROOKLYN Ext. Work
P.S. 274 - BROOKLYN32EXTERIOR MASONRY 1 M - 4 M2019/07Ext. WorkScope
P.S. 274 - BROOKLYN32PARAPETS 1 M - 4 M2019/07Ext. WorkScope
D018493 P.S. 279 - BROOKLYN Building Systems
P.S. 279 - BROOKLYN18BACKFLOW PREVENTION DEVICES$750-1M2019/05Building SystemsDesign
D018843 P.S. 288 - BROOKLYN Building Systems
P.S. 288 - BROOKLYN21RESO A SUPPLEMENTAL COOLING 1 M - 4 M2019/04Building SystemsDesign
D018245 P.S. 298 - BROOKLYN Electrical (Exclude RCT)
P.S. 298 - BROOKLYN23ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/05Electrical (Exclude RCT)Design
D017302 P.S. 312 - BROOKLYN Playgrounds
P.S. 312 - BROOKLYN22Reso A Learning Garden 4 M OVER2019/03PlaygroundsDesign
D018786 P.S. 328 - BROOKLYN Ext. Work
P.S. 328 - BROOKLYN19EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 328 - BROOKLYN19PARAPETS 4 M OVER2019/06Ext. WorkScope
P.S. 328 - BROOKLYN19ROOFS 4 M OVER2019/06Ext. WorkScope
D018519 P.S. 345 - BROOKLYN Ext. Work
P.S. 345 - BROOKLYN19EXTERIOR MASONRY 1 M - 4 M2019/05Ext. WorkDesign
P.S. 345 - BROOKLYN19WATER INFILTRATION 1 M - 4 M2019/05Ext. WorkDesign
D018633 P.S. 377 - BROOKLYN Auditorium Upgrades
P.S. 377 - BROOKLYN32AUDITORIUM UPGRADE$500-$750K2019/05Auditorium UpgradesDesign
D018775 P.S. 38 - BROOKLYN Ext. Work
P.S. 38 - BROOKLYN15EXTERIOR MASONRY 1 M - 4 M2019/06Ext. WorkScope
P.S. 38 - BROOKLYN15ROOFS 1 M - 4 M2019/06Ext. WorkScope
D018138 P.S. 41 - BROOKLYN Electrical (Exclude RCT)
P.S. 41 - BROOKLYN23ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/01Electrical (Exclude RCT)Design
D018720 P.S. 41 - BROOKLYN Boilers/Heating Plant Upgrade
P.S. 41 - BROOKLYN23PLANYC BOILER CONVERSION 4 M OVER2019/06Boilers/Heating Plant UpgradeScope
P.S. 41 - BROOKLYN23PLANYC CLIMATE CONTROL 4 M OVER2019/06Building SystemsScope
D018920 P.S. 45 - BROOKLYN Playgrounds
P.S. 45 - BROOKLYN32RESO A PLAYGROUND UPGRADE$250-$500K2019/06PlaygroundsScope
D018880 P.S. 506 - BROOKLYN Building Systems
P.S. 506 - BROOKLYN20RESO A SUPPLEMENTAL COOLING$250-$500K2019/05Building SystemsScope
D018261 P.S. 56 - BROOKLYN Ext. Work
P.S. 56 - BROOKLYN13EXTERIOR MASONRY 4 M OVER2019/03Ext. WorkDesign
P.S. 56 - BROOKLYN13PARAPETS 4 M OVER2019/03Ext. WorkDesign
P.S. 56 - BROOKLYN13ROOFS 4 M OVER2019/03Ext. WorkDesign
D018777 P.S. 69 - BROOKLYN Ext. Work
P.S. 69 - BROOKLYN20EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 69 - BROOKLYN20ROOFS 4 M OVER2019/06Ext. WorkScope
D018571 P.S. 705 - BROOKLYN Building Systems
P.S. 705 - BROOKLYN17HVAC 1 M - 4 M2019/03Building SystemsDesign
D018602 P.S. 748 - BROOKLYN Playgrounds
P.S. 748 - BROOKLYN20PLANYC PLAYGROUND REDEVELOPMENT$750-1M2019/06PlaygroundsDesign
D018864 P.S. 75 - BROOKLYN Ext. Work
P.S. 75 - BROOKLYN32EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
P.S. 75 - BROOKLYN32FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
P.S. 75 - BROOKLYN32WINDOWS 4 M OVER2019/06OtherScope
D018594 P.S. 92 - BROOKLYN Electrical (Exclude RCT)
P.S. 92 - BROOKLYN17ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/04Electrical (Exclude RCT)Design
D018724 P.S. 92 - BROOKLYN Ext. Work
P.S. 92 - BROOKLYN17EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
D018751 P.S. 94 - BROOKLYN Electrical (Exclude RCT)
P.S. 94 - BROOKLYN15RESO A IPDVS CAMERA INSTALLATION$250-$500K2019/05Electrical (Exclude RCT)Scope
D018601 P.S. 95 - BROOKLYN Playgrounds
P.S. 95 - BROOKLYN21PLANYC PLAYGROUND REDEVELOPMENT 1 M - 4 M2019/06PlaygroundsDesign
D018789 PASSAGES ACADEMY Ext. Work
PASSAGES ACADEMY19EXTERIOR MASONRY 1 M - 4 M2019/06Ext. WorkScope
PASSAGES ACADEMY19FLOOD ELIMINATION 1 M - 4 M2019/06Ext. WorkScope
PASSAGES ACADEMY19PARAPETS 1 M - 4 M2019/06Ext. WorkScope
PASSAGES ACADEMY19ROOFS 1 M - 4 M2019/06Ext. WorkScope
PASSAGES ACADEMY19WINDOWS 1 M - 4 M2019/06OtherScope
D018650 PATHWAYS IN TECHNOLOGY EARLY C Electrical (Exclude RCT)
PATHWAYS IN TECHNOLOGY EARLY C17ELECTRICAL WORK FOR A/C INITIATIVE$0- $250K2019/06Electrical (Exclude RCT)Scope
D018689 PRE-K CENTER AT BISHOP FORD SC Playgrounds
PRE-K CENTER AT BISHOP FORD SC15PLAYGROUND$500-$750K2019/06PlaygroundsDesign
D018714 SUCCESS ACADEMY CHARTER SCHOOL Boilers/Heating Plant Upgrade
SUCCESS ACADEMY CHARTER SCHOOL14PLANYC BOILER CONVERSION 4 M OVER2019/05Boilers/Heating Plant UpgradeDesign
SUCCESS ACADEMY CHARTER SCHOOL14PLANYC CLIMATE CONTROL 4 M OVER2019/05Building SystemsDesign
D018582 SUMMIT ACADEMY CHARTER SCHOOL Building Systems
SUMMIT ACADEMY CHARTER SCHOOL15RPZ BACKFLOW PREVENTION DEVICES$250-$500K2019/06Building SystemsScope
D018006 TELECOM. ARTS & TECH. HS - K Electrical (Exclude RCT)
TELECOM. ARTS & TECH. HS - K20IPDVS CAMERA INSTALLATION$0- $250K2018/12Electrical (Exclude RCT)Design
D018203 THE BROOKLYN SCHOOL FOR SOCIAL Electrical (Exclude RCT)
THE BROOKLYN SCHOOL FOR SOCIAL32ELECTRICAL WORK FOR A/C INITIATIVE$250-$500K2018/12Electrical (Exclude RCT)Design
D018148 THE FRESH CREEK SCHOOL - BROOK Electrical (Exclude RCT)
THE FRESH CREEK SCHOOL - BROOK19ELECTRICAL WORK FOR A/C INITIATIVE$500-$750K2019/05Electrical (Exclude RCT)Scope
D018649 THE INTERNATIONAL HS - BROOKLY Electrical (Exclude RCT)
THE INTERNATIONAL HS - BROOKLY17ELECTRICAL WORK FOR A/C INITIATIVE$250-$500K2019/05Electrical (Exclude RCT)Design
D018572 WIILIAMSBURG PREP- BROOKLYN Ext. Work
WIILIAMSBURG PREP- BROOKLYN14FLOOD ELIMINATION 1 M - 4 M2019/06Ext. WorkScope
D018735 WILLIAM E. GRADY VOC HS - K Other
WILLIAM E. GRADY VOC HS - K21ANSUL SYSTEM DUCTWORK$500-$750K2019/06OtherScope
D018739 WILLIAM MAXWELL VOC HS - K Ext. Work
WILLIAM MAXWELL VOC HS - K19EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
WILLIAM MAXWELL VOC HS - K19FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
WILLIAM MAXWELL VOC HS - K19PARAPETS 4 M OVER2019/06Ext. WorkScope
WILLIAM MAXWELL VOC HS - K19WINDOWS 4 M OVER2019/06OtherScope
MANHATTAN
D018504 BERGTRAUM HS - MANHATTAN Electrical (Exclude RCT)
BERGTRAUM HS - MANHATTAN02PUBLIC ADDRESS & CLOCK SYSTEMS 1 M - 4 M2019/01Electrical (Exclude RCT)Design
D018802 EDWARD A. REYNOLDS WEST SIDE H Ext. Work
EDWARD A. REYNOLDS WEST SIDE H03EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
EDWARD A. REYNOLDS WEST SIDE H03FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
EDWARD A. REYNOLDS WEST SIDE H03PARAPETS 4 M OVER2019/06Ext. WorkScope
EDWARD A. REYNOLDS WEST SIDE H03ROOFS 4 M OVER2019/06Ext. WorkScope
D018711 GREGORIO LUPERON PREP. SCHOOL Science Lab Upgrades
GREGORIO LUPERON PREP. SCHOOL06RESO A SCIENCE LAB UPGRADE 1 M - 4 M2019/06Science Lab UpgradesDesign
D018473 HAMILTON GRANGE MIDDLE SCHOOL Gymnasium
HAMILTON GRANGE MIDDLE SCHOOL06RESO A GYMNASIUM UPGRADE$250-$500K2019/01GymnasiumDesign
D017980 HS FOR HEALTH CAREER & SCIENCE Building Systems
HS FOR HEALTH CAREER & SCIENCE06WATER MAIN- BACKFLOW ISSUE$750-1M2018/12Building SystemsDesign
D018049 HS FOR HEALTH CAREER & SCIENCE Electrical (Exclude RCT)
HS FOR HEALTH CAREER & SCIENCE06IPDVS CAMERA INSTALLATION$250-$500K2018/12Electrical (Exclude RCT)Design
D018679 HS FOR HEALTH CAREER & SCIENCE Ext. Work
HS FOR HEALTH CAREER & SCIENCE06EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
HS FOR HEALTH CAREER & SCIENCE06FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
HS FOR HEALTH CAREER & SCIENCE06PARAPETS 4 M OVER2019/06Ext. WorkScope
HS FOR HEALTH CAREER & SCIENCE06ROOFS 4 M OVER2019/06Ext. WorkScope
HS FOR HEALTH CAREER & SCIENCE06WINDOWS 4 M OVER2019/06OtherScope
D018704 HS FOR HEALTH CAREER & SCIENCE Accessibility
HS FOR HEALTH CAREER & SCIENCE06ADA SHELTER COMPLIANCE RAMP$0- $250K2019/05AccessibilityDesign
D017265 I.S. 114 - MANHATTAN Ext. Work
I.S. 114 - MANHATTAN02RESO A ROOFTOP GREENHOUSE 1 M - 4 M2019/04Ext. WorkDesign
D018468 I.S. 12 - MANHATTAN Gymnasium
I.S. 12 - MANHATTAN04GYM CEILING$250-$500K2019/03GymnasiumDesign
D018680 I.S. 143 - MANHATTAN Building Systems
I.S. 143 - MANHATTAN06WATER MAIN / BACKFLOW PREVENTION$500-$750K2019/06Building SystemsScope
D017973 I.S. 293 - MANHATTAN Electrical (Exclude RCT)
I.S. 293 - MANHATTAN06FIRE ALARM SYSTEM$250-$500K2019/06Electrical (Exclude RCT)Scope
P025604 I.S. 328 - MANHATTAN Electrical (Exclude RCT)
I.S. 328 - MANHATTAN06IPDVS CAMERA INSTALLATION$500-$750K2018/12Electrical (Exclude RCT)Design
M035 SPED - MANHATTAN02IPDVS CAMERA INSTALLATION$500-$750K2018/12Electrical (Exclude RCT)Design
P.S. 210 - MANHATTAN06IPDVS CAMERA INSTALLATION$500-$750K2018/12Electrical (Exclude RCT)Design
D017862 I.S. 362 - MANHATTAN Kitchen Conversion
I.S. 362 - MANHATTAN05KITCHEN AREAS 4 M OVER2019/03Kitchen ConversionDesign
I.S. 362 - MANHATTAN05ROOM CONVERSION 4 M OVER2019/03Room Conversions/UpgradesDesign
D018715 I.S. 54 - MANHATTAN Boilers/Heating Plant Upgrade
I.S. 54 - MANHATTAN03PLANYC BOILER CONVERSION 4 M OVER2019/05Boilers/Heating Plant UpgradeDesign
I.S. 54 - MANHATTAN03PLANYC CLIMATE CONTROL 4 M OVER2019/05Building SystemsDesign
D018801 J. K. ONASSIS HS FOR INT CAREE Ext. Work
J. K. ONASSIS HS FOR INT CAREE02EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
J. K. ONASSIS HS FOR INT CAREE02FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
J. K. ONASSIS HS FOR INT CAREE02PARAPETS 4 M OVER2019/06Ext. WorkScope
D018791 LOWER EAST SIDE PREP HS - M Ext. Work
LOWER EAST SIDE PREP HS - M01EXTERIOR MASONRY 4 M OVER2019/06Ext. WorkScope
LOWER EAST SIDE PREP HS - M01FLOOD ELIMINATION 4 M OVER2019/06Ext. WorkScope
LOWER EAST SIDE PREP HS - M01ROOFS 4 M OVER2019/06Ext. WorkScope
D018734 M000 - MANHATTAN Gymnasium
M000 - MANHATTAN02UPE- INTERIOR CONVERSION 4 M OVER2019/06GymnasiumScope
D018799 M169